← Back
Over six families without stores
507 WEST 158 STREET
MANHATTAN · Washington Heights (South) · BIN 1062772
💬 Discuss this project
1905Year Built
5Stories
C1Building Class
R7-2Zoning
17,155 sfGross Floor Area
20Units
Rent Stabilized94 Open Violations 93 unresolved · 1 paperwork only ▸
Over six families without stores · Owner of record: NEW YORK EQUITY FUND 2004 LLC · 4,996 sf lot · 3.43 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalEquipmentCivilGeneralOther
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 3 docs
Floor 51 filing · 3 docs
Floor 41 filing · 3 docs
Floor 3
Floor 2
Floor 1
Site & exteriorUnder Construction3p · 1 filing · 3 docs
Filed — no permit issued32p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HPD1603/21/2026
COMMUNITY LEAGUE OF THE HEIGHTS203/21/2026
BULGER BUILDINGS LP203/21/2026
NEW YORK EQUITY FUND 2004 LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EMTG CONSULTANTS INC209/10/2026
URBAN QUOTIENT107/28/2026
P. M. ARCHITECTURE, PC110/11/2024
MSM ENGINEERING SERVICES, PLLC110/03/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KD DESIGNS103/21/2026
PM ARCHITECTURE PC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALPHA SCAFFOLDING INCGeneral Contractor404/09/2026
HORIZON CONSTRUCTION INCGeneral Contractor107/08/2026
H F PLUMBINGPlumbing103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CITY-WIDE TESTING INC416209/10/2026
Building Lifecycle
All (113)Filed (5)Permit Issued (3)Signed Off (1)Violation (60)Objection (16)Special Inspection (28)
09/15/2026
Objection raised — Scope
09/15/2026
Objection raised — Energy
09/15/2026
Objection raised — Mechanical
09/15/2026
Objection raised — Scope
09/10/2026
Filed — Alteration
Minor repairs and renovations throughout the residential units, public corridors and cellar. Minor partition work as indicated. Minor repairs to exterior facades, window replacement, and roof replacement only. All bulk conditions are existing.
M01419242-S3
08/27/2026
Violation issued (ECB, open)
Construction
08/24/2026
Special inspection requirement — Heating Systems
08/24/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/15/2026
Objection raised — Other
08/15/2026
Objection raised — Other
08/11/2026
Filed — Alteration
Minor repairs and renovations throughout the residential units, public corridors and cellar. Minor partition work as indicated. Minor repairs to exterior facades, window replacement, and roof replacement only. All bulk conditions are existing.
M01419242-S1
08/06/2026
Objection resolved — Addressed
08/06/2026
Objection resolved — Addressed
08/06/2026
Objection resolved — Addressed
08/06/2026
Objection resolved — Addressed
08/06/2026
Objection resolved — Addressed
08/05/2026
Special inspection requirement — Permanent certificate
08/05/2026
Special inspection requirement — Heating Systems
08/05/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/05/2026
Special inspection requirement — Energy Code Compliance Inspections
08/05/2026
Special inspection requirement — HVAC-R and service water heating equipment
08/05/2026
Special inspection requirement — Shutoff dampers
08/05/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
08/05/2026
Special inspection requirement — HVAC-R and service water heating system controls
08/05/2026
Special inspection requirement — Maintenance information
08/04/2026
Objection raised — Scope
08/04/2026
Objection raised — Admin
08/04/2026
Objection raised — Other
08/04/2026
Objection raised — Other
08/04/2026
Objection raised — Admin
08/03/2026
Violation issued (ECB, open)
Construction
07/28/2026
Filed — Alteration
Minor repairs and renovations throughout the residential units, public corridors and cellar. Minor partition work as indicated. Minor repairs to exterior facades, window replacement, and roof replacement only. All bulk conditions are existing.
M01419242-I1
07/28/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/27/2026
Special inspection requirement — Lighting controls
07/27/2026
Special inspection requirement — Interior lighting power
07/27/2026
Special inspection requirement — Exterior lighting power
07/21/2026
Special inspection requirement — Final
07/21/2026
Special inspection requirement — Mechanical Systems
06/29/2026
Special inspection requirement — Masonry
06/29/2026
Special inspection requirement — Energy Code Compliance Inspections
06/29/2026
Special inspection requirement — Fire-Resistance Rated Construction
06/29/2026
Special inspection requirement — Air barrier - visual inspection
06/29/2026
Special inspection requirement — Fenestration air leakage
06/29/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
06/29/2026
Special inspection requirement — Fenestration areas
06/29/2026
Special inspection requirement — Insulation placement and R values
06/29/2026
Special inspection requirement — Lighting in dwelling units
06/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/18/2026
Special inspection requirement — Final
02/26/2026
Violation issued (HPD, open)
A
02/20/2026
Violation issued (HPD, open)
B
02/20/2026
Violation issued (HPD, open)
B
01/26/2026
Violation issued (HPD, open)
A
01/26/2026
Violation issued (HPD, open)
A
01/16/2026
Violation issued (HPD, open)
A
01/16/2026
Violation issued (HPD, open)
A
01/16/2026
Violation issued (HPD, open)
A
01/09/2026
Violation issued (HPD, closed)
B
01/09/2026
Violation issued (HPD, open)
B
01/09/2026
Violation issued (HPD, closed)
B
Latest 60 of 113 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedALPHA SCAFFOLDING INC10/30/2025
DOB NOWGeneral ConstructionSigned-offHORIZON CONSTRUCTION INC12/09/2024
DOB NOWSupported ScaffoldPermit IssuedALPHA SCAFFOLDING INC10/23/2024
BISOTISSUEDQUIXOTIC SYSTEMS INC06/06/2016
BISPLISSUEDH & F PLUMBING INC01/20/2016
BISOTISSUEDQUIXOTIC SYSTEMS INC12/01/2015
BISPLISSUEDBETA PLUMBING & HTNG CORP01/12/2010
BISEQISSUEDTMA CONTRACTING,CORP07/30/2009
BISSPISSUEDTHE PLUMBING COMPANY INC.06/26/2007
BISPLISSUEDTHE PLUMBING COMPANY, INC.06/26/2007
BISEQISSUEDALMO GROUP CORPORATION03/19/2007
BIS—ISSUEDALMO GROUP CORPORATION03/19/2007
BISEQISSUEDCOLGATE SCAFFOLDING & EQUIPMENT03/01/2007
BISEQISSUEDALMO GROUP CORPORATION02/21/2007
BIS—ISSUEDALMO GROUP CORPORATION02/21/2007
BIS—ISSUEDALMO GROUP CORPORATION03/16/2005
BISEQISSUEDALMO GROUP CORPORATION03/16/2005
BISSPISSUEDBLETSAS PLBNG & HTG CORP03/16/2005
BISPLISSUEDBLETSAS PLBNG & HTG CORP12/17/2004
BIS—ISSUEDSIGMA CONTRACTING CORP06/10/2004
BISOTISSUEDEASTERN EMPIRE CONTR. INC.10/31/2001
BISOTISSUEDHASHEM CONTRACTING CORP.10/19/2000
BISEQISSUEDA. TAHER CONT. CO.09/25/2000
BISOTISSUEDZOMA CONSTRUCTION INC.09/22/2000
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
08/24/2026Heating Systems—special
08/24/2026Tenant Protection Plan Compliance—special
08/05/2026Permanent certificate—energy_progress
08/05/2026Heating Systems—special
08/05/2026Tenant Protection Plan Compliance—special
08/05/2026Energy Code Compliance Inspections—progress
08/05/2026HVAC-R and service water heating equipment—energy_progress
08/05/2026Shutoff dampers—energy_progress
08/05/2026HVAC-R and service water piping design and insulation—energy_progress
08/05/2026HVAC-R and service water heating system controls—energy_progress
08/05/2026Maintenance information—energy_progress
07/28/2026Tenant Protection Plan Compliance—special
07/27/2026Lighting controls—energy_progress
07/27/2026Interior lighting power—energy_progress
07/27/2026Exterior lighting power—energy_progress
07/21/2026Final—progress
07/21/2026Mechanical Systems—special
06/29/2026Masonry—special
06/29/2026Energy Code Compliance Inspections—progress
06/29/2026Fire-Resistance Rated Construction—progress
06/29/2026Air barrier - visual inspection—energy_progress
06/29/2026Fenestration air leakage—energy_progress
06/29/2026Fenestration and door U-factor and product ratings—energy_progress
06/29/2026Fenestration areas—energy_progress
06/29/2026Insulation placement and R values—energy_progress
Latest 25 of 28.
▾Documents — 37 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/26/2026M01119250-I1Request digital key ↗
08/26/2026M01122864-I1Request digital key ↗
08/16/2026M01419242-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits4
▸BISWORK PERMIT APPLICATION3
06/13/2016122614867Open ↗
01/28/2016122614867Open ↗
12/10/2015122614867Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
12/02/2015122614867Open ↗
▸Seals & Professional Certifications10
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
05/26/2017122614867Open ↗
12/02/2015122614867Open ↗
12/02/2015122614867Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/26/2026M01122864-I1Open ↗
08/16/2026M01419242-I1Open ↗
08/16/2026M01419242-S1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/02/2015122614867Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
12/02/2015122614867Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
12/02/2015122614867Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/26/2026M01122864-I1Open ↗
08/16/2026M01419242-S2Open ↗
08/16/2026M01419242-S1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/02/2015122614867Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
05/26/2017122614867Open ↗
12/10/2015122614867Open ↗
12/02/2015122614867Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
05/26/2017122614867Open ↗
▸Approvals, Objections & Sign-offs4
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/16/2026M01419242-S1Open ↗
08/14/2026M01419242-I1Open ↗
08/13/2026M01119250-I1Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
05/26/2017122614867Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
05/26/2017122614867Open ↗
12/02/2015122614867Open ↗
11/25/2015122614867Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
12/02/2015122614867Open ↗