DOB12/13/2011VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
DOB12/13/2011VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
DOB12/31/2009V-DOB VIOLATION - ACTIVE
ECB05/22/2009VIOLATING CONDITIONS 15,16,19A,30A,40,48A,50,50A,50B,50C,50D 50-OIL SHUT OFF VALVE MISSING AT TOP OF OIL TANK, ALSO ANTI-SYPHON VALVE 50A-COLD WATER PIPES OVER OIL BURNER, NOT ISULATED "SWEATING: 50B-FUSABLE LNothing owed — awaiting certificate of correction
ECB05/22/2009VIOLATING CONDITIONS 5A,6A,16,24B,32A,36,44C,50,50A,50B 50-FLOW SWITCHDEFECTIVE. 50A-BOILER FLUE NOT INCREASED IN SIZE FOR TWO BOILERS, NOT TEE Y TOGETHER IN MANIFOLD. NOT INTO CHIMNEY, ABOVE LARGER BOILER FLUENothing owed — awaiting certificate of correction
ECB05/22/2009VIOLATING CONDITIONS 24B,50,50A,50B,50C,50D 50-SAFETY VALVE NOT INSTALLED IN OUTLET,"TOP OF BOILER" 50B-FLOW SWITCH DEFECTIVE. 50C-RATTING TAP COVERED, "UNREADABLE" 50D-FLUE PIPE SUPPORTED WITH BANDIRON.Nothing owed — awaiting certificate of correction