← Back
Office with commercial, 7-19 stories
Wolf Building
508 WEST 26 STREET · BIN 1012385
💬 Discuss this project
1927Year Built
9Stories
O6Building Class
M1-5Zoning
146,416 sfGross Floor Area
46Units
LL97 Covered10 Open Violations 6 unresolved · 4 paperwork only ▸FISP: SWARMP
Office with commercial, 7-19 stories · Owner of record: WEST CHELSEA BUILDING LLC · 12,343 sf lot · 11.86 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Floor 1022p · 4 filings · 20 docs
Floor 9
Floor 81p · 1 filing · 20 docs
Floor 7
Floor 6
Floor 5
Floor 42p · 1 filing · 6 docs
Floor 3
Floor 2
Floor 1
1 job · most recent 06/04/2026
FiledStatusContractorScope
06/04/2026———
2 jobs · most recent 06/04/2026
Water/Sanitary
FiledStatusContractorScope
06/04/2026Signed-offJ.A. MECH. PLBG. & HTG INWater/Sanitary
08/30/2022Permit IssuedJ.A. MECH. PLBG. & HTG INWater/Sanitary
15 jobs · most recent 04/08/2026
General Wiring
FiledStatusContractorScope
04/08/2026Permit IssuedPOWER SURGE ELECTRIC, INCGeneral Wiring
06/15/2023CompleteDIAKONIA ELEC'L AND CONSTGeneral Wiring
06/15/2023CompleteDIAKONIA ELEC'L AND CONSTGeneral Wiring
06/15/2023CompleteDIAKONIA ELEC'L AND CONSTGeneral Wiring
06/07/2023Permit IssuedDIAKONIA ELEC'L AND CONSTGeneral Wiring
03/21/2023CompleteBOROWIDE ELECT'L CONTR'S—
03/10/2023CompleteBOROWIDE ELECT'L CONTR'S—
06/15/2022CompleteALLSTATE ELEC'L CONT INC—
04/05/2022CompleteMONTGOMERY ELEC'L CONTR'GGeneral Wiring
12/26/2021CompleteDIAKONIA ELEC'L AND CONSTGeneral Wiring
09/24/2021Permit IssuedDIAKONIA ELEC'L AND CONSTGeneral Wiring
09/22/2021CompleteDIAKONIA ELEC'L AND CONST7 meters, 7 new_meters
10/31/2019Permit IssuedDIAKONIA ELEC'L AND CONSTGeneral Wiring
08/14/2018CompleteAVALON ELECTRIC CORP.General Wiring
08/03/2018CompleteJAVELIN ELECTRIC INCGeneral Wiring
Building Lifecycle
All (236)Filed (35)Permit Issued (31)Signed Off (16)Facade (FISP) (19)Violation (60)Inspection (6)Objection (39)Special Inspection (30)
06/29/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/23/2026
Permit issued — Plumbing
M01398773-S1-PL
06/12/2026
Objection resolved — Resolved
06/11/2026
Objection raised — Cost
06/04/2026
Filed — Alteration
HEREBY FILING FOR THE RELOCATION OF PLUMBING FIXTURES. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01398773-S1
05/29/2026
Filed — Alteration
HEREBY FILING FOR THE RELOCATION OF PLUMBING FIXTURES. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01398773-I1
05/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Josephine Zurica
05/07/2026
Special inspection requirement — Sprinkler Systems
Josephine Zurica
12/05/2025
Violation issued (ECB, closed)
Construction
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/12/2025
Signed off — Alteration
HEREBY FILING FOR NEW AC/ACCU UNITS ON PARTIAL 10TH FLOOR & ROOF. NO CHANGE IN USE OCCUPANCY NOR EGRESS.
M01063977-I1
09/02/2025
Permit issued — Plumbing
M00286013-I1-PL
08/26/2025
Signed off — Alteration
M00852335-I1
08/06/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01061932-I1
04/30/2025
Signed off — Alteration
M00828775-I1
04/10/2025
Permit issued — Mechanical Systems
M01063977-I1-MS
03/18/2025
Permit issued — Sidewalk Shed
M00852335-I1-SH
03/10/2025
Cycle 9 facade inspection completed
03/10/2025
Cycle 9 facade report signed — SWARMP
02/14/2025
Permit issued — Sidewalk Shed
M00828775-I1-SH
01/31/2025
Permit issued — Mechanical Systems
M01063977-I1-MS
01/15/2025
Violation issued (ECB, closed)
Construction
11/15/2024
Violation issued (ECB, open)
Construction
11/12/2024
Cycle 9 facade report submitted
10/04/2024
Filed — Alteration
EXTERIOR FACADE RESTORATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00902853-P1
10/02/2024
Special inspection requirement — Final
Mark Ellis
10/02/2024
Special inspection requirement — Energy Code Compliance Inspections
Mark Ellis
10/02/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
alon egozi
08/19/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/12/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/07/2024
Permit issued — General Construction
M00902853-I1-GC
08/02/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/29/2024
Objection resolved — Addressed
07/24/2024
Objection raised — Scope
07/23/2024
Filed — Alteration
HEREBY FILING FOR NEW AC/ACCU UNITS ON PARTIAL 10TH FLOOR & ROOF. NO CHANGE IN USE OCCUPANCY NOR EGRESS.
M01063977-I1
07/22/2024
Special inspection requirement — Maintenance information
Josephine Zurica
07/22/2024
Special inspection requirement — Energy Code Compliance Inspections
Josephine Zurica
07/22/2024
Special inspection requirement — Shutoff dampers
Josephine Zurica
07/12/2024
Signed off — Alteration
HEREBY FILING FOR THE REMOVAL AND RELOCATION OF SPRINKLER HEADS. NOC HANGE TO USE OCCUPANCY OR EGRESS.
M00408921-I1
07/12/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Josephine Zurica
07/12/2024
Special inspection requirement — HVAC-R and service water heating equipment
Josephine Zurica
07/12/2024
Special inspection requirement — HVAC-R and service water heating system controls
Josephine Zurica
06/28/2024
Permit issued — Plumbing
M00286013-I1-PL
06/11/2024
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01061932-I1
06/11/2024
Permit issued — Sidewalk Shed
M01061932-I1-SH
06/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Josephine Zurica
06/10/2024
Special inspection requirement — Final
Josephine Zurica
06/10/2024
Special inspection requirement — Mechanical Systems
Josephine Zurica
05/07/2024
Special inspection requirement — Sprinkler Systems
Josephine Zurica
05/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Josephine Zurica
04/16/2024
Filed — Alteration
HEREBY FILING FOR THE REMOVAL AND RELOCATION OF SPRINKLER HEADS. NOC HANGE TO USE OCCUPANCY OR EGRESS.
M00408921-P6
03/26/2024
Permit issued — Sidewalk Shed
M00852335-I1-SH
03/11/2024
Signed off — Alteration
M00942803-I1
02/21/2024
Cycle 9 facade report submitted
02/19/2024
Cycle 9 facade report signed — UNSAFE
02/16/2024
Permit issued — Sidewalk Shed
M00828775-I1-SH
01/24/2024
Cycle 9 facade inspection completed
12/06/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00914819-I1
11/01/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/06/2023
Permit issued — Supported Scaffold
M00942803-I1-SF
Latest 60 of 236 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JERRICK ASSOCIATES1107/08/2026
COVATI CONSTRUCTION303/22/2026
THE OWNER OF103/22/2026
NTJ ASSOCIATES1503/22/2026
CEPRINE SCAFFOLDING SERVICES103/21/2026
NTJ ASSOCI103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JENNY FLORES EXPEDITING2303/21/2026
AE DESIGN SOLUTION603/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
NORTHEAST EXPEDITING403/21/2026
JAM CONSULTANTS, INC.203/21/2026
RICHARD LEWIS ARCHITECT203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J.A. MECH. PLBG. & HTG INPlumbing707/08/2026
JERRICK ASSOCIATES INCGeneral Contractor707/08/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor507/08/2026
DIAKONIA ELEC'L AND CONSTElectrical503/22/2026
CEPRINE CONSTRUCTION INCGeneral Contractor507/08/2026
WHITE LEAF MECHANICAL CORGeneral Contractor507/08/2026
ANESIS SERVICES CORPFire Protection407/08/2026
BROSNA CONSTRUCTION CORPOGeneral Contractor307/08/2026
COVATI CONSTRUCTION CORPGeneral Contractor203/21/2026
THOMAS FAYFire Protection203/21/2026
HUDSON PLMBING & MCH, LLCPlumbing107/08/2026
BIRNBAUM, ALANElectrical103/21/2026
MONTGOMERY ELEC'L CONTR'GElectrical103/22/2026
WEST CHELSEA BUILDING LLCGeneral Contractor107/08/2026
KREMER, WILLIAMElectrical103/21/2026
NAVAS, WILMERElectrical103/21/2026
TOUGH STALLION LLCElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DAGHER ENGINEERING24411405/29/2026
ASE ENGINEERING PLLC5785210/04/2024
MEP INSPECTIONS, INC1102306/06/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJ.A. MECH. PLBG. & HTG IN06/23/2026
DOB NOWPlumbingPermit IssuedJ.A. MECH. PLBG. & HTG IN09/02/2025
DOB NOWMechanical SystemsSigned-offWHITE LEAF MECHANICAL COR04/10/2025
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC03/18/2025
DOB NOWSidewalk ShedSigned-offCEPRINE CONSTRUCTION INC02/14/2025
DOB NOWMechanical SystemsSigned-offWHITE LEAF MECHANICAL COR01/31/2025
DOB NOWGeneral ConstructionPermit IssuedGE 2A CONSTRUCTION08/07/2024
DOB NOWPlumbingPermit IssuedJ.A. MECH. PLBG. & HTG IN06/28/2024
DOB NOWSidewalk ShedSigned-offGE 2A CONSTRUCTION06/11/2024
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC03/26/2024
DOB NOWSidewalk ShedSigned-offCEPRINE CONSTRUCTION INC02/16/2024
DOB NOWSupported ScaffoldSigned-offGE 2A CONSTRUCTION10/06/2023
DOB NOWSidewalk ShedSigned-offGE 2A CONSTRUCTION08/14/2023
DOB NOWGeneral ConstructionPermit IssuedGE 2A CONSTRUCTION08/08/2023
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC04/03/2023
DOB NOWSidewalk ShedSigned-offCEPRINE CONSTRUCTION INC02/27/2023
DOB NOWSprinklersSigned-offTHOMAS FAY04/08/2022
DOB NOWSprinklersSigned-offTHOMAS FAY02/16/2022
DOB NOWPlumbingSigned-offHUDSON PLMBING & MCH, LLC11/19/2021
DOB NOWGeneral ConstructionSigned-offBROSNA CONSTRUCTION CORPO11/17/2021
DOB NOWMechanical SystemsSigned-offBROSNA CONSTRUCTION CORPO11/17/2021
DOB NOWMechanical SystemsSigned-offWHITE LEAF MECHANICAL COR09/27/2021
DOB NOWPlumbingPermit IssuedJ.A. MECH. PLBG. & HTG IN09/17/2021
DOB NOWSprinklersSigned-offTHOMAS FAY01/19/2021
DOB NOWPlumbingSigned-offJ.A. MECH. PLBG. & HTG IN11/23/2020
DOB NOWPlumbingPermit IssuedJ.A. MECH. PLBG. & HTG IN11/02/2020
DOB NOWSprinklersSigned-offTHOMAS FAY07/24/2020
DOB NOWMechanical SystemsSigned-offWEST CHELSEA BUILDING03/18/2020
DOB NOWPlumbingPermit IssuedJ.A. MECH. PLBG. & HTG IN01/22/2020
DOB NOWMechanical SystemsSigned-offCOVATI CONSTRUCTION01/21/2020
DOB NOWPlumbingSigned-offJ.A. MECH. PLBG. & HTG IN12/03/2019
BISOTISSUEDWEST CHELSEA BUILDING LLC05/23/2025
BISOTISSUEDWEST CHELSEA BUILDING LLC05/23/2025
BISOTISSUEDWEST CHELSEA BUILDING LLC05/23/2025
BIS—ISSUEDWEST CHELSEA BUILDING LLC05/23/2025
BISOTISSUEDWEST CHELSEA BUILDING LLC05/23/2025
BISOTISSUEDWEST CHELSEA BUILDING LLC05/23/2025
BISOTISSUEDWEST CHELSEA BUILDING LLC05/20/2024
BISOTISSUEDWEST CHELSEA BUILDING LLC05/20/2024
BISOTISSUEDWEST CHELSEA BUILDING LLC05/20/2024
+ 41 more permits on file
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
06/29/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/19/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/12/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/02/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/20/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/27/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 64
DateRequirementInspectorRole
05/07/2026Fire-Resistant Penetrations and JointsJosephine Zuricaspecial
05/07/2026Sprinkler SystemsJosephine Zuricaspecial
10/02/2024Structural Stability – Alterations of existing buildingsalon egozispecial
10/02/2024FinalMark Ellisprogress
10/02/2024Energy Code Compliance InspectionsMark Ellisprogress
07/22/2024Maintenance informationJosephine Zuricaenergy_progress
07/22/2024Energy Code Compliance InspectionsJosephine Zuricaprogress
07/22/2024Shutoff dampersJosephine Zuricaenergy_progress
07/12/2024HVAC-R and service water heating system controlsJosephine Zuricaenergy_progress
07/12/2024HVAC-R and service water piping design and insulationJosephine Zuricaenergy_progress
07/12/2024HVAC-R and service water heating equipmentJosephine Zuricaenergy_progress
06/10/2024Mechanical SystemsJosephine Zuricaspecial
06/10/2024FinalJosephine Zuricaprogress
06/10/2024Fire-Resistant Penetrations and JointsJosephine Zuricaspecial
05/07/2024Sprinkler SystemsJosephine Zuricaspecial
05/07/2024Fire-Resistant Penetrations and JointsJosephine Zuricaspecial
06/29/2023Lighting controlsNicolas Crosettoenergy_progress
06/29/2023Shutoff dampersNicolas Crosettoenergy_progress
06/29/2023HVAC-R and service water piping design and insulationNicolas Crosettoenergy_progress
06/29/2023Maintenance informationNicolas Crosettoenergy_progress
06/29/2023FinalNicolas Crosettoprogress
06/29/2023Mechanical SystemsNicolas Crosettospecial
06/29/2023Energy Code Compliance InspectionsNicolas Crosettoprogress
06/29/2023HVAC-R and service water heating system controlsNicolas Crosettoenergy_progress
06/29/2023Interior lighting powerNicolas Crosettoenergy_progress
Latest 25 of 64.
▾Documents — 1,394 on file (BIS + DOB NOW)
▸Plans & Drawings35
▸DOB NOWPlans/Sketch14
09/03/2026M00542367-P1Request digital key ↗
09/03/2026M00542367-I1Request digital key ↗
09/03/2026M00542349-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler8
09/05/2026M00246463-I1Request digital key ↗
09/04/2026M00408921-P1Request digital key ↗
09/04/2026M00408921-P2Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Plumbing7
09/05/2026M00246409-I1Request digital key ↗
09/05/2026M00286013-I1Request digital key ↗
09/05/2026M00286013-P3Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems4
09/05/2026M00223507-I1Request digital key ↗
09/01/2026M00424593-P1Request digital key ↗
09/01/2026M00424593-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly2
08/15/2026M00647600-I1Request digital key ↗
08/14/2026M00314395-I1Request digital key ↗
▸Applications & Permits298
▸BISPLAN / WORK APPROVAL APPLICATION146
10/01/2024103615385Open ↗
08/23/2024103615385Open ↗
04/15/2024103615385Open ↗
Showing 3 of 146 on file for this type
▸BISWORK PERMIT APPLICATION125
04/27/2020103615385Open ↗
04/27/2020104160774Open ↗
04/27/2020103503022Open ↗
Showing 3 of 125 on file for this type
▸DOB NOWLPC Approval/Permit16
08/13/2026M00902853-I1Open ↗
08/13/2026M00287805-I1Open ↗
08/13/2026M00286013-P4Open ↗
Showing 3 of 16 on file for this type
▸BISPLACE OF ASSEMBLY10
03/02/2022103749534Open ↗
02/28/2022122231469Open ↗
12/29/2021122231469Open ↗
Showing 3 of 10 on file for this type
▸BISPLAN / WORK & PERMITS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISFLOOD ZONE DESIGN CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications299
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION140
04/03/2020122353737Open ↗
03/04/2020123471876Open ↗
03/04/2020123471876Open ↗
Showing 3 of 140 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature35
09/05/2026M00246409-I1Open ↗
09/05/2026M00286013-I1Open ↗
09/05/2026M00286013-P4Open ↗
Showing 3 of 35 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST33
10/15/2020103503022Open ↗
Showing 1 of 33 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT24
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 24 on file for this type
▸DOB NOWProgress Inspector Seal & Signature24
09/23/2026M00647600-I1Open ↗
09/01/2026M00902853-P1Open ↗
09/01/2026M00902853-P1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/19/2026M00408921-P2Open ↗
09/19/2026M00408921-P2Open ↗
09/01/2026M00408921-P4Open ↗
Showing 3 of 20 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Trade Schedules & Equipment133
▸BISEQUIPMENT USE PERMITS35
04/20/2021103503022Open ↗
09/09/2020123752518Open ↗
03/02/2020123471876Open ↗
Showing 3 of 35 on file for this type
▸BISSELF-CERT PLUMBING NOTICE33
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 33 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE20
10/30/2019103503022Open ↗
Showing 1 of 20 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT20
04/20/2021103503022Open ↗
09/09/2020123752518Open ↗
02/25/2020123471876Open ↗
Showing 3 of 20 on file for this type
▸BISSCHEDULE B - PLUMBING14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA6
07/31/2020123471894Open ↗
Showing 1 of 6 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMITEQUIPMENT USE PERMITS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection56
▸BISANTI-HARASSMENT CHECKLIST26
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 26 on file for this type
▸DOB NOWHPD-1: Anti-Harassment Area Checklist23
09/05/2026M00246463-I1Open ↗
09/04/2026M00408921-P1Open ↗
09/04/2026M00408921-P2Open ↗
Showing 3 of 23 on file for this type
▸BISHPD-1 - Anti-Harassment Area Checklist4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTenant Protection Plan and Notes2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWCertificate of No Harassment1
08/13/2026M00542276-I1Open ↗
▸Environmental & Asbestos72
▸DOB NOWDEP ACP-5: Asbestos Assessment Report28
09/05/2026M00246409-I1Open ↗
09/05/2026M00286013-I1Open ↗
09/05/2026M00286013-P4Open ↗
Showing 3 of 28 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)24
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 24 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Energy Compliance84
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS46
03/04/2020123471876Open ↗
03/04/2020123471876Open ↗
02/28/2020123471876Open ↗
Showing 3 of 46 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS24
04/03/2020122353737Open ↗
03/04/2020123471876Open ↗
02/28/2020123471876Open ↗
Showing 3 of 24 on file for this type
▸BISTR8: Energy Code Progress Inspections4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
09/09/2020123752518Open ↗
09/09/2020123752518Open ↗
09/09/2020123752518Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00542367-I1Open ↗
▸Inspections & Test Reports14
▸BISTECHNICAL REPORT: RESPONSIBILITY14
10/07/2021103503022Open ↗
09/23/2021103503022Open ↗
09/23/2021103503022Open ↗
Showing 3 of 14 on file for this type
▸Approvals, Objections & Sign-offs155
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST49
10/07/2021103503022Open ↗
09/22/2020123471894Open ↗
09/09/2020123752518Open ↗
Showing 3 of 49 on file for this type
▸BISLANDMARKS APPROVAL29
07/12/2019123752518Open ↗
Showing 1 of 29 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE18
10/01/2024103615385Open ↗
08/23/2024103615385Open ↗
04/15/2024103615385Open ↗
Showing 3 of 18 on file for this type
▸BISADMINISTRATIVE OBJECTIONS18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸DOB NOWHigh Line Parks Approval17
09/04/2026M00408921-P1Open ↗
09/04/2026M00408921-P2Open ↗
09/04/2026M00408921-P3Open ↗
Showing 3 of 17 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISSUPERSEDING LETTER6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISHIGH LINE - PARKS APPROVAL REQUIRED2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership98
▸BISCOST AFFIDAVIT94
04/03/2020122353737Open ↗
03/04/2020123471876Open ↗
02/28/2020123471876Open ↗
Showing 3 of 94 on file for this type
▸BISDEPT OF FINANCE VERIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
09/22/2020123471894Open ↗
▸Filing & Intake Forms134
▸BISADDITIONAL INFORMATION63
03/05/2024104256261Open ↗
08/04/2023104160774Open ↗
08/04/2023104256261Open ↗
Showing 3 of 63 on file for this type
▸BISEFILING COVER SHEET45
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 45 on file for this type
▸BISBOROUGH INTAKE FORM22
04/27/2020103615385Open ↗
04/27/2020104160774Open ↗
04/27/2020104330252Open ↗
Showing 3 of 22 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Other Documents10
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISUnknown2
11/18/2019103503022Open ↗
11/18/2019103503022Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type