← Back
BuildNYC
Elevator apt, semi-fireproof without stores
508 WEST 55TH STREET
MANHATTAN · BIN 1081752
💬 Discuss this project
2000Year Built
6Stories
D1Building Class
R8Zoning
53,472 sfGross Floor Area
58Units
LL97 CoveredRent Stabilized2 Active Violations 1 old, status unconfirmed ▸
Elevator apt, semi-fireproof without stores · Owner of record: Asn Foundry · 12,552 sf lot · 4.26 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 4Unit 4011p · 1 filing · 5 docs
Floor 3
Floor 27p · 1 filing · 6 docs
Floor 1
Cellar7p · 1 filing · 6 docs
Site & exterior6p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Equity Residential610/17/2026
Clinton 54503/21/2026
Member303/21/2026
Asn Foundry203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Hansen Engineering210/16/2026
Azsk Architects107/13/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
S S Architectural Design203/21/2026
Socotec203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GS Construction GroupGeneral Contractor203/21/2026
Jam ElectricalElectrical103/21/2026
Pumping Sol Plumbing & Mechanical IPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Hansen Engineering8174210/16/2026
Buildtech Engineering6369107/13/2021
Building Lifecycle
All (74)Filed (3)Permit Issued (2)Signed Off (1)Violation (60)Inspection (4)Special Inspection (4)
10/16/2026
Filed — Alteration
FILING HEREWITH TO MODIFY GAS PLUMBING SYSTEM AS PER PLANS. . THERE IS NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01249051-P1
10/02/2026
Special inspection requirement — Tenant Protection Plan Compliance
10/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
09/16/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/11/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/12/2026
Violation issued (HPD, open)
A
08/12/2026
Violation issued (HPD, open)
A
05/29/2026
Permit issued — Plumbing
M01249051-I1-PL
12/18/2025
Violation issued (HPD, closed)
C
08/26/2025
Filed — Alteration
FILING HEREWITH TO MODIFY GAS PLUMBING SYSTEM AS PER PLANS. . THERE IS NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01249051-I1
08/13/2025
Special inspection requirement — Tenant Protection Plan Compliance
Ryan Hansen
08/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
11/11/2024
Violation issued (HPD, closed)
C
08/03/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/03/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/28/2023
Violation issued (HPD, closed)
A
07/28/2023
Violation issued (HPD, closed)
A
06/27/2023
Violation issued (ECB, closed)
Boilers
06/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/12/2022
Violation issued (HPD, closed)
B
11/12/2022
Violation issued (HPD, closed)
B
11/12/2022
Violation issued (HPD, closed)
C
11/05/2021
Signed off — Alteration
M00555271-I1
10/27/2021
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/25/2021
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
09/27/2021
Permit issued — General Construction
M00555271-I1-GC
07/13/2021
Filed — Alteration
M00555271-I1
06/10/2021
Violation issued (ECB, closed)
Quality of Life
06/10/2021
Violation issued (ECB, closed)
Construction
06/10/2021
Violation issued (ECB, closed)
Construction
04/01/2021
Violation issued (HPD, closed)
I
04/01/2021
Violation issued (HPD, closed)
A
12/24/2019
Violation issued (HPD, closed)
B
10/25/2019
Violation issued (HPD, closed)
I
10/10/2018
Violation issued (HPD, closed)
I
03/06/2018
Violation issued (HPD, closed)
A
03/06/2018
Violation issued (HPD, closed)
A
03/06/2018
Violation issued (HPD, closed)
A
03/06/2018
Violation issued (HPD, closed)
A
03/06/2018
Violation issued (HPD, closed)
A
02/28/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/28/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/26/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/26/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/07/2016
Violation issued (HPD, closed)
C
04/07/2016
Violation issued (HPD, closed)
C
10/02/2015
Violation issued (HPD, closed)
I
06/18/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/18/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/30/2014
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
05/30/2014
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/19/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 74 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedPumping Sol Plumbing & Mechanical I05/29/2026
DOB NOWGeneral ConstructionSigned-offGS Construction Group09/27/2021
BISOTISSUEDGotham Construction02/21/2002
BISPLISSUEDPar Plumbing Co03/14/2001
BISBLISSUEDUnflat, Asso02/15/2001
BISSPISSUEDPace Plumbing12/29/2000
BISEQISSUEDGotham Oranigzation11/30/2000
BIS—ISSUEDGotham Oranigzation11/30/2000
BISPLISSUEDPar Plumbing Co04/27/2000
BIS—ISSUEDGotham Oranigzation12/14/1999
BIS—ISSUEDDanilello Carting Co12/09/1999
BISEQISSUEDDanilello Carting Co12/09/1999
1 project · most recent 10/16/2026
Gas Water/Sanitary
FiledStatusContractorScope
10/16/2026Permit IssuedPumping Sol Plumbing & Mechanical IGas, Water/Sanitary
2 projects · most recent 10/16/2026
General Wiring
FiledStatusContractorScope
10/16/2026Permit IssuedInterstate ElectricGeneral Wiring
03/22/2024Permit IssuedJam Electrical—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
09/16/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/11/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/27/2021Pass-Final General Construction Non-Directive 14PassView ↗
10/25/2021Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
10/02/2026Tenant Protection Plan Compliance—special
10/01/2026Fire-Resistant Penetrations and JointsRyan Hansenspecial
08/13/2025Tenant Protection Plan ComplianceRyan Hansenspecial
08/13/2025Fire-Resistant Penetrations and JointsRyan Hansenspecial
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
09/03/2026M00555271-I1Request digital key ↗
08/21/2026M01249051-I1Request digital key ↗
▸Applications & Permits1
▸DOB NOWHPD Certification Letter or CPC Special Permit1
08/13/2026M00555271-I1Open ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature3
10/18/2026M01249051-P1Open ↗
09/03/2026M00555271-I1Open ↗
08/13/2026M01249051-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
10/18/2026M01249051-P1Open ↗
08/31/2026M01249051-I1Open ↗
▸Safety & Tenant Protection4
▸DOB NOWHPD-2: Clinton Special District Anti-Harassment Checklist3
10/18/2026M01249051-P1Open ↗
08/13/2026M00555271-I1Open ↗
08/13/2026M01249051-I1Open ↗
▸DOB NOWCertificate of No Harassment1
08/13/2026M00555271-I1Open ↗