Multi-story retail building (2+)
509 BRIGHTON BEACH AVE
BROOKLYN · BIN 3244866
💬 Discuss this project
1927Year Built
2Stories
K2Building Class
R6Zoning
4,000 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Multi-story retail building (2+) · Owner of record: 509 BRIGHTON LLC · 2,000 sf lot · 2 FAR built · Flood zone AE
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction2p · 1 filing · 3 docs
Floor 1Under Construction7p · 4 filings · 20 docs
CellarUnder Construction5p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JABER REALTY3009/13/2026
ACE GROUP NY407/08/2026
DESIGN TEAM SIGN COMPANY303/22/2026
HARD ROCK CONSTRUCTION203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/09/2023$1.9M—— → —$475/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHON ENGINEERING407/30/2026
ZENITH HOME INSPECTIONS106/13/2024
EAB ARCHITECTURAL DESIGNS, PLLC402/20/2024
ENTHINK ENGINEERS LLC110/18/2023
BRICOLAGE DESIGNS305/25/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LOUIS STRIAR203/21/2026
BRICOLAGE DESIGNS203/21/2026
CHON ENGINEERING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
E. HOQUE CONTRACTING GR*General Contractor407/08/2026
GRAND CONSTRUCTION AND DEGeneral Contractor207/08/2026
JOSEPH WEINSTEIN ELECTRICElectrical203/22/2026
HARD ROCK CONSTRUCTIONGeneral Contractor107/08/2026
I DO PLUMBING & HTG INCPlumbing107/08/2026
L&J PLG & HTG CO OF NY INPlumbing107/08/2026
TRI CITY MECHANICAL GROUP CORPPlumbing107/08/2026
HOLNESS, GEORGEElectrical103/21/2026
L S SIGNScaffold107/08/2026
TRANSCANADAElectrical103/21/2026
ACE GROUP NY CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
J&R DESIGN AND INSPECTION6637102/13/2026
AA BUILDING & INSPECTION1519104/05/2023
Building Lifecycle
All (98)Filed (13)Permit Issued (10)Signed Off (6)Violation (2)Inspection (9)Objection (28)Special Inspection (30)
07/31/2026
Special inspection requirement — HVAC-R and service water heating equipment
Steve Chon
07/31/2026
Special inspection requirement — Energy Code Compliance Inspections
Steve Chon
07/31/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Steve Chon
07/31/2026
Special inspection requirement — HVAC-R and service water heating system controls
Steve Chon
07/30/2026
Filed — Alteration
TO BUILD COMMERCIAL LAUNDROMAT. WORK INCLUDES INSTALLATION OF WASHERS, DRYER, WATER HEATERS, AND SPRINKLERS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01357488-P2
07/30/2026
Special inspection requirement — Energy Code Compliance Inspections
Steve Chon
07/30/2026
Special inspection requirement — HVAC-R and service water heating equipment
Steve Chon
07/30/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Steve Chon
07/30/2026
Special inspection requirement — HVAC-R and service water heating system controls
Steve Chon
07/28/2026
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
07/27/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/21/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/15/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/03/2026
Permit issued — General Construction
B01357456-I1-GC-CX
04/14/2026
Filed — Alteration
TO BUILD COMMERCIAL LAUNDROMAT. WORK INCLUDES INSTALLATION OF WASHERS, DRYER, WATER HEATERS, AND SPRINKLERS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01357488-P1
02/19/2026
Permit issued — Plumbing
B01357488-I1-PL
02/18/2026
Permit issued — Mechanical Systems
B01357456-I1-GC-CX
02/13/2026
Filed — Alteration
TO BUILD COMMERCIAL LAUNDROMAT. WORK INCLUDES INSTALLATION OF WASHERS, DRYER, WATER HEATERS, AND SPRINKLERS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01357488-I1
02/13/2026
Filed — Alteration
B01357456-I1
12/13/2024
Signed off — Alteration
INTERIOR ALTERATION TO EXISTING COMMERICAL TENANT SPACE ON THE FIRST FLOOR. REMOVAL OF INTERIOR FINISHES AND INSTALLATION OF NEW FINISHES AND MILLWORK THROUGHOUT
B00967120-I1
12/12/2024
Signed off — Alteration
SCOPE OF WORK TO INCLUDE NEW PLUMBING FIXTURES AT THE FIRST FLOOR COMMERICAL TENANT SPACE.
B00968949-I1
11/19/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/17/2024
Signed off — Alteration
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - CINNABON CARVEL. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B01043903-I1
06/14/2024
Permit issued — Sign
B01043903-I1-SG
06/13/2024
Filed — Alteration
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - CINNABON CARVEL. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B01043903-I1
06/13/2024
Special inspection requirement — Final
ADITYA DESAI
03/22/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/22/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/14/2024
Permit issued — Plumbing
B00968949-I1-PL
03/06/2024
Permit issued — General Construction
B00967120-I1-GC
02/28/2024
Special inspection requirement — Lighting controls
BRIAN T. O'CONNOR
02/28/2024
Special inspection requirement — Interior lighting power
BRIAN T. O'CONNOR
02/28/2024
Special inspection requirement — Energy Code Compliance Inspections
Vicente Varela
02/28/2024
Special inspection requirement — Final
Vicente Varela
02/28/2024
Special inspection requirement — HVAC-R and service water heating equipment
BRIAN T. O'CONNOR
02/28/2024
Special inspection requirement — HVAC-R and service water heating system controls
BRIAN T. O'CONNOR
02/28/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
BRIAN T. O'CONNOR
02/28/2024
Special inspection requirement — Maintenance information
BRIAN T. O'CONNOR
02/23/2024
Special inspection requirement — Energy Code Compliance Inspections
Vicente Varela
02/20/2024
Filed — Alteration
SCOPE OF WORK TO INCLUDE NEW PLUMBING FIXTURES AT THE FIRST FLOOR COMMERICAL TENANT SPACE.
B00968949-P1
02/20/2024
Filed — Alteration
INTERIOR ALTERATION TO EXISTING COMMERICAL TENANT SPACE ON THE FIRST FLOOR. REMOVAL OF INTERIOR FINISHES AND INSTALLATION OF NEW FINISHES AND MILLWORK THROUGHOUT
B00967120-P1
02/20/2024
Special inspection requirement — Maintenance information
02/20/2024
Special inspection requirement — Energy Code Compliance Inspections
02/20/2024
Special inspection requirement — Final
02/20/2024
Special inspection requirement — Interior lighting power
02/20/2024
Special inspection requirement — HVAC-R and service water heating system controls
02/20/2024
Special inspection requirement — HVAC-R and service water heating equipment
02/20/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
02/20/2024
Special inspection requirement — Lighting controls
02/20/2024
Special inspection requirement — Energy Code Compliance Inspections
12/27/2023
Objection resolved — Addressed
12/26/2023
Objection resolved — Addressed
12/18/2023
Objection resolved — Addressed
12/18/2023
Objection resolved — Addressed
12/14/2023
Objection resolved — Addressed
12/14/2023
Objection resolved — Addressed
12/08/2023
Objection resolved — Addressed
12/08/2023
Objection resolved — Addressed
12/08/2023
Objection resolved — Addressed
12/08/2023
Objection resolved — Addressed
Latest 60 of 98 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedGRAND CONSTRUCTION AND DE06/03/2026
DOB NOWPlumbingPermit IssuedI DO PLUMBING & HTG INC02/19/2026
DOB NOWMechanical SystemsPermit IssuedGRAND CONSTRUCTION AND DE02/18/2026
DOB NOWSignSigned-offWEINFELD, ELLIOT06/14/2024
DOB NOWPlumbingSigned-offL&J PLG & HTG CO OF NY IN03/14/2024
DOB NOWGeneral ConstructionSigned-offHARD ROCK CONSTRUCTION03/06/2024
DOB NOWSidewalk ShedPermit IssuedACE GROUP NY CORP10/19/2023
DOB NOWPlumbingSigned-offFLAVIO MECHANICAL CORP08/29/2023
DOB NOWConstruction FenceSigned-offE. HOQUE CONTRACTING GR*06/14/2023
DOB NOWGeneral ConstructionSigned-offE. HOQUE CONTRACTING GR*06/10/2023
BISPLISSUEDORION PLUMBING & HTG CORP01/06/2014
BISOTISSUEDHAPPY GARDEN CONSTR. CORP12/27/2013
1 project · most recent 07/30/2026
Gas Plumbing-Sprinkler Water/Sanitary
FiledStatusContractorScope
07/30/2026Permit IssuedI DO PLUMBING & HTG INCGas, Plumbing-Sprinkler, Water/Sanitary
5 projects · most recent 04/23/2026
General Wiring
FiledStatusContractorScope
04/23/2026Permit IssuedLND ELECTRIC LLCGeneral Wiring
05/30/2024CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
12/05/2023Permit IssuedWEBSTAR ELECL CONTRS INCGeneral Wiring
10/24/2023CompleteHIGH QUALITY ELECTRIC OF—
09/13/2023CompleteJOE ELECTRICAL INCGeneral Wiring
1 project · most recent 10/18/2023
Sidewalk Shed
FiledStatusContractorScope
10/18/2023Permit IssuedACE GROUP NY CORPSidewalk Shed
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
07/28/2026Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
07/27/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/21/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/15/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/19/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/22/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/22/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/13/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/07/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
07/31/2026HVAC-R and service water heating equipmentSteve Chonenergy_progress
07/31/2026Energy Code Compliance InspectionsSteve Chonprogress
07/31/2026HVAC-R and service water piping design and insulationSteve Chonenergy_progress
07/31/2026HVAC-R and service water heating system controlsSteve Chonenergy_progress
07/30/2026Energy Code Compliance InspectionsSteve Chonprogress
07/30/2026HVAC-R and service water heating equipmentSteve Chonenergy_progress
07/30/2026HVAC-R and service water piping design and insulationSteve Chonenergy_progress
07/30/2026HVAC-R and service water heating system controlsSteve Chonenergy_progress
06/13/2024FinalADITYA DESAIprogress
02/28/2024Lighting controlsBRIAN T. O'CONNORenergy_progress
02/28/2024Interior lighting powerBRIAN T. O'CONNORenergy_progress
02/28/2024Energy Code Compliance InspectionsVicente Varelaprogress
02/28/2024FinalVicente Varelaprogress
02/28/2024HVAC-R and service water heating equipmentBRIAN T. O'CONNORenergy_progress
02/28/2024HVAC-R and service water heating system controlsBRIAN T. O'CONNORenergy_progress
02/28/2024HVAC-R and service water piping design and insulationBRIAN T. O'CONNORenergy_progress
02/28/2024Maintenance informationBRIAN T. O'CONNORenergy_progress
02/23/2024Energy Code Compliance InspectionsVicente Varelaprogress
02/20/2024Maintenance information—energy_progress
02/20/2024Energy Code Compliance Inspections—progress
02/20/2024Final—progress
02/20/2024Interior lighting power—energy_progress
02/20/2024HVAC-R and service water heating system controls—energy_progress
02/20/2024HVAC-R and service water heating equipment—energy_progress
02/20/2024HVAC-R and service water piping design and insulation—energy_progress
Latest 25 of 44.
▾Documents — 83 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/27/2026B00854531-S2Request digital key ↗
08/27/2026B00854531-S1Request digital key ↗
08/26/2026B00949566-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits3
▸BISWORK PERMIT APPLICATION2
01/06/2014340109279Open ↗
12/27/2013340109279Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
12/27/2013340109279Open ↗
▸Seals & Professional Certifications46
▸DOB NOWProgress Inspector Seal & Signature22
09/01/2026B00967120-I1Open ↗
09/01/2026B00967120-I1Open ↗
09/01/2026B00967120-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/27/2026B00854531-I1Open ↗
08/27/2026B00854531-S1Open ↗
08/27/2026B00854531-S2Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
08/22/2026B00854531-I1Open ↗
08/22/2026B00854531-I1Open ↗
08/22/2026B00854531-I1Open ↗
Showing 3 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
12/27/2013340109279Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/27/2013340109279Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/27/2013340109279Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
05/20/2014340109279Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING1
12/27/2013340109279Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
02/01/2014340109279Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/27/2026B00854531-S2Open ↗
08/18/2026B01357456-I1Open ↗
08/17/2026B01357488-P1Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/27/2013340109279Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
12/27/2013340109279Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
05/20/2014340109279Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
12/27/2013340109279Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
05/20/2014340109279Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
12/27/2013340109279Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
05/20/2014340109279Open ↗
12/27/2013340109279Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
12/27/2013340109279Open ↗