← Back
BuildNYC
Walk-up apt, over six families with stores
509 EAST 81ST STREET
MANHATTAN · BIN 1078714
💬 Discuss this project
1920Year Built
5Stories
C7Building Class
R8BZoning
16,640 sfGross Floor Area
63Units
Rent Stabilized13 Active Violations 12 unresolved · 1 paperwork only ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: Vulcan 81 Co · 5,108 sf lot · 3.26 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 57 Of 8 Realty CO. LLC7p · 1 filing · 12 docs
Floor 4
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Vulcan 81 Co1303/21/2026
7 of 8 Realty Co804/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Jose A. Santos P.E.P.C201/30/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Poseidon Expediting & Consulting SE403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
All Pro Plumbing & HeatingPlumbing307/08/2026
Village Electl ContractorsElectrical103/21/2026
Village Electl ContractorsElectrical103/22/2026
R&R Contracting ManagementGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Jose A Santos PE3292201/30/2025
Building Lifecycle
All (78)Filed (2)Permit Issued (2)Signed Off (2)Violation (60)Inspection (4)Special Inspection (8)
05/20/2026
Violation issued (HPD, closed)
I
05/14/2026
Violation issued (HPD, open)
C
05/14/2026
Violation issued (HPD, open)
B
05/14/2026
Violation issued (HPD, closed)
C
05/14/2026
Violation issued (HPD, closed)
C
04/20/2026
Violation issued (HPD, closed)
B
04/20/2026
Violation issued (HPD, closed)
B
04/20/2026
Violation issued (HPD, closed)
B
04/20/2026
Violation issued (HPD, closed)
B
04/20/2026
Violation issued (HPD, closed)
C
04/02/2026
Signed off — Alteration
PROPOSE TO PERFORM MINOR INTERIOR WORK, AND NEW NON-LOAD BEARING PARTITIONS AT EXISTING APARTMENT 17 (5TH FLOOR), AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRESS UNDER THIS APPLICATION.
M01164992-S1
03/29/2026
Violation issued (HPD, closed)
B
03/29/2026
Violation issued (HPD, closed)
C
03/21/2026
Violation issued (HPD, closed)
A
03/21/2026
Violation issued (HPD, closed)
B
03/02/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/21/2026
Violation issued (HPD, closed)
A
02/05/2026
Violation issued (HPD, closed)
C
02/05/2026
Violation issued (HPD, closed)
B
01/27/2026
Violation issued (ECB, closed)
Boilers
01/19/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/09/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/09/2025
Signed off — Alteration
PROPOSE TO PERFORM MINOR INTERIOR WORK, AND NEW NON-LOAD BEARING PARTITIONS AT EXISTING APARTMENT 17 (5TH FLOOR), AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRESS UNDER THIS APPLICATION.
M01164992-I1
12/04/2025
Violation issued (ECB, closed)
Construction
11/24/2025
Violation issued (HPD, closed)
C
10/27/2025
Violation issued (HPD, closed)
C
10/27/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/17/2025
Violation issued (HPD, closed)
B
10/17/2025
Violation issued (HPD, closed)
C
07/28/2025
Violation issued (HPD, closed)
B
07/28/2025
Violation issued (HPD, closed)
B
07/28/2025
Violation issued (HPD, closed)
B
07/28/2025
Violation issued (HPD, open)
C
07/28/2025
Violation issued (HPD, closed)
B
04/25/2025
Permit issued — Plumbing
M01164992-S1-PL
04/21/2025
Permit issued — General Construction
M01164992-I1-GC
04/09/2025
Violation issued (HPD, closed)
B
03/17/2025
Violation issued (HPD, closed)
B
03/17/2025
Violation issued (HPD, closed)
C
03/17/2025
Violation issued (HPD, closed)
C
03/17/2025
Violation issued (HPD, closed)
C
03/17/2025
Violation issued (HPD, closed)
C
03/10/2025
Violation issued (HPD, closed)
C
03/10/2025
Violation issued (HPD, closed)
C
03/10/2025
Violation issued (HPD, closed)
C
03/10/2025
Violation issued (HPD, closed)
C
03/06/2025
Violation issued (HPD, closed)
I
03/03/2025
Violation issued (HPD, closed)
C
02/24/2025
Violation issued (HPD, closed)
C
02/18/2025
Violation issued (HPD, closed)
C
02/18/2025
Violation issued (HPD, closed)
C
02/18/2025
Violation issued (HPD, closed)
A
02/14/2025
Violation issued (HPD, closed)
I
02/14/2025
Violation issued (HPD, closed)
I
02/14/2025
Violation issued (HPD, closed)
I
02/14/2025
Violation issued (HPD, closed)
I
02/14/2025
Violation issued (HPD, closed)
I
02/14/2025
Violation issued (HPD, closed)
I
02/14/2025
Violation issued (HPD, closed)
I
02/04/2025
Violation issued (HPD, closed)
A
Latest 60 of 78 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAll Pro Plumbing & Heating04/25/2025
DOB NOWGeneral ConstructionSigned-offR&R Contracting Management04/21/2025
BISPLISSUEDEast Coast Mechanical09/10/2018
BISFBISSUEDEast Coast Petroleum09/10/2018
BISPLISSUEDOrion Plumbing & Heating04/01/2013
BISOTISSUEDGreenwich Village Construction03/05/2013
BISOTISSUEDGreenwich Village Construction02/08/2012
BISOTISSUEDAngel C Construction05/24/2010
BISOTISSUEDAngel C Construction11/25/2009
BISFSISSUEDHercules Welding11/20/1995
7 projects · most recent 06/02/2026
General Wiring Boiler Controls
FiledStatusContractorScope
06/02/2026CompleteVillage Electl Contractors—
10/01/2025CompleteVillage Electl ContractorsGeneral Wiring
03/06/2025Permit IssuedVillage Electl ContractorsGeneral Wiring
02/28/2025Permit IssuedVillage Electl ContractorsGeneral Wiring
02/28/2025CompleteVillage Electl Contractors—
03/19/2020Permit IssuedAlco ElectricGeneral Wiring
07/17/2018Permit IssuedRomcon ElectricBoiler Controls
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/02/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/19/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/09/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/27/2025Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
01/13/2025Fire-Resistant Penetrations and JointsJose Santosspecial
01/09/2025Tenant Protection Plan ComplianceJose Santosspecial
01/09/2025Fire-Resistant Penetrations and JointsJose Santosspecial
01/09/2025Tenant Protection Plan ComplianceJose Santosspecial
01/09/2025Energy Code Compliance InspectionsJose Santosprogress
01/09/2025Fire-Resistance Rated ConstructionJose Santosprogress
01/09/2025Interior lighting powerJose Santosenergy_progress
01/09/2025Lighting controlsJose Santosenergy_progress
▾Documents — 91 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/25/2026M01164992-S1Request digital key ↗
08/25/2026M01164992-I1Request digital key ↗
▸Applications & Permits16
▸BISPLAN / WORK APPROVAL APPLICATION8
03/26/2019140799875Open ↗
09/07/2018140799875Open ↗
05/13/2013121510070Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION8
09/07/2018140799875Open ↗
09/07/2018140799875Open ↗
09/07/2018140799875Open ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications25
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
04/04/2019140799875Open ↗
03/26/2019140799875Open ↗
03/07/2013121510070Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
03/07/2013121510070Open ↗
02/09/2012120968943Open ↗
05/25/2010120361054Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
03/07/2013121510070Open ↗
02/09/2012120968943Open ↗
05/25/2010120361054Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/23/2026M01164992-I1Open ↗
08/23/2026M01164992-I1Open ↗
08/22/2026M01164992-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026M01164992-I1Open ↗
08/13/2026M01164992-S1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/23/2026M01164992-I1Open ↗
08/23/2026M01164992-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
09/07/2018140799875Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
09/07/2018140799875Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/07/2018140799875Open ↗
▸Trade Schedules & Equipment9
▸BISSCHEDULE B - PLUMBING5
09/07/2018140799875Open ↗
03/07/2013121510070Open ↗
02/09/2012120968943Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
03/26/2019140799875Open ↗
09/07/2018140799875Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
03/26/2019140799875Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
06/18/2013121510070Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST4
03/07/2013121510070Open ↗
02/09/2012120968943Open ↗
05/25/2010120361054Open ↗
Showing 3 of 4 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES1
09/07/2018140799875Open ↗
▸Environmental & Asbestos7
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
09/07/2018140799875Open ↗
03/07/2013121510070Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
02/09/2012120968943Open ↗
05/25/2010120361054Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026M01164992-I1Open ↗
08/13/2026M01164992-S1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
11/25/2009120209201Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/07/2013121510070Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/07/2018140799875Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/07/2018140799875Open ↗
▸BISTECHNICAL REPORT: ENERGY1
02/09/2012120968943Open ↗
▸Approvals, Objections & Sign-offs4
▸BISADMINISTRATIVE OBJECTIONS4
03/07/2013121510070Open ↗
02/09/2012120968943Open ↗
05/25/2010120361054Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT6
03/26/2019140799875Open ↗
09/07/2018140799875Open ↗
03/07/2013121510070Open ↗
Showing 3 of 6 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT4
03/07/2013121510070Open ↗
02/09/2012120968943Open ↗
05/25/2010120361054Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms9
▸BISEFILING COVER SHEET4
03/07/2013121510070Open ↗
02/09/2012120968943Open ↗
05/25/2010120361054Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION3
04/04/2019140799875Open ↗
03/26/2019140799875Open ↗
05/13/2013121510070Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
09/07/2018140799875Open ↗
▸BISBOROUGH INTAKE FORM1
03/26/2019140799875Open ↗