← Back
BuildNYC
Walk-up apt, over six families with stores
509 HINSDALE STREET
BROOKLYN · BIN 3085400
💬 Discuss this project
1930Year Built
4Stories
C7Building Class
R6Zoning
—Gross Floor Area
25Units
435 Active Violations 431 unresolved · 4 paperwork only ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: Riverdale Avenue Properties · 3.6 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Site & exterior1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC Department of Housing Preservation and Development604/09/2026
Riverdale Avenue Properties303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FL&M Engineering Design & Inspection112/31/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Deltex Electrical Cont. IElectrical103/22/2026
Labco Eletrt ContngElectrical103/22/2026
New York Business Fire SystemsFire Protection103/21/2026
Kings AssociatesGeneral Contractor103/21/2026
A-1 Watermain SewerPlumbing103/21/2026
Mainland PLG HeatingPlumbing103/21/2026
SKY Heights ConstructionScaffold104/09/2026
Aljer Plumbing and HeatingPlumbing107/08/1994
King's AssociatesGeneral Contractor101/28/2003
Building Lifecycle
07/21/2026
§ 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES ELECTRICAL OUTLET AT EAST WALL IN THE 4th ROOM FROM…
HPD violation · open
07/21/2026
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL TILES AT FLOOR IN THE 3rd ROOM FROM EAST LOCATED AT APT 4F,…
HPD violation · open
07/21/2026
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE TRIP LEVER CONTROL VALVE AT BATHTUB IN THE BATHROOM LOCATED AT APT 4F, 4th STORY,…
HPD violation · open
07/21/2026
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRIC SWITCH COVER AT EAST WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 4F,…
HPD violation · open
07/21/2026
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND NORTH WALL IN THE 1st ROOM FROM…
HPD violation · open
205 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—SKY Heights Construction—
BIS—A-1 Watermain & Sewer—
BIS—Mainland PLG & Heating—
BIS—New York Business Fire Systems—
BIS—King's Associates—
BIS—Aljer Plumbing & Heating—
BIS—NA—
Nothing on file for this building.
Nothing on file for this building.
3 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account