| Owner | Filings | Most Recent |
|---|---|---|
| DOUGLASTON DEVELOPMENT | 67 | 09/29/2026 |
| REPUBLIC EXTERIOR SERVICES | 10 | 07/11/2026 |
| DD 11TH AVE | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| I.M. ROBBINS, P.C. | 12 | 07/22/2026 |
| S9 ARCHITECTURE AND ENGINEERING PC | 7 | 06/30/2026 |
| BITOPI CONSULTANTS LLC | 1 | 01/28/2026 |
| MICHAEL WALSH | 1 | 10/23/2025 |
| GEORGE J. XERAKIAS, PE | 1 | 10/15/2025 |
| DERIVE ENGINEERS | 3 | 09/23/2025 |
| JEFFREY SMILOW | 5 | 09/17/2025 |
| PATUXENT ENGINEERING LLC | 6 | 09/05/2025 |
| LOMBARDO PROFESSIONAL ENGINEERING | 1 | 06/11/2025 |
| R.C. STRUCTURES, INC. | 2 | 03/19/2025 |
| G. BLINN CONSULTING, LLC | 3 | 04/17/2024 |
| SAUL SHAPIRO | 1 | 09/27/2021 |
| Representative | Filings | Most Recent |
|---|---|---|
| JAM CONSULTANTS, INC. | 48 | 03/21/2026 |
| PATUXENT ENGINEERING | 12 | 03/21/2026 |
| KD DESIGNS | 1 | 03/21/2026 |
| A1 EXPEDITING SERVICE | 6 | 03/21/2026 |
| HS DESIGN STUDIO | 2 | 03/21/2026 |
| LOMBARDO BUILDING CONSULTANTS | 1 | 03/21/2026 |
| RIGGING CONSULTANTS | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| J.E. LEVINE BUILDER INC | General Contractor | 20 | 07/15/2026 |
| RAEL AUTOMATIC SPR.CO INC | Fire Protection | 9 | 09/29/2026 |
| REPUBLIC SCAFFOLD&HOIST C | General Contractor | 6 | 07/11/2026 |
| FORWARD MECHANICAL CORP | Plumbing | 4 | 09/19/2026 |
| S&E BRIDGE & SCAFFOLD LLC. | General Contractor | 4 | 09/09/2026 |
| AIR TECH COOLING INC | General Contractor | 3 | 07/08/2026 |
| R.C. STRUCTURES INC | General Contractor | 3 | 07/08/2026 |
| PACE PLUMBING CORP | Fire Protection | 3 | 07/08/2026 |
| BIG SKY CONSTRUCTION CO | General Contractor | 3 | 04/09/2026 |
| CENTRIFUGAL ELECTRIC LLC | Electrical | 1 | 03/22/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| ATLAS ATC ENGINEERING INC | 8011 | 26 | 07/22/2026 |
| PCS ENGINEERING | 3745 | 1 | 10/23/2025 |
| GEORGE J. XERAKIAS, PE | 1658 | 1 | 10/15/2025 |
| LANGAN ENG, ENV, SURVEYIN | 1265 | 2 | 10/08/2021 |
| WSP USA CORP | 1848 | 1 | 10/08/2021 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sprinklers | Permit Issued | RAEL AUTOMATIC SPR.CO INC | 09/28/2026 |
| DOB NOW | Plumbing | Permit Issued | FORWARD MECHANICAL CORP | 09/18/2026 |
| DOB NOW | Construction Fence | Permit Issued | S&E BRIDGE & SCAFFOLD LLC. | 09/08/2026 |
| DOB NOW | Boiler Equipment | Signed-off | EAST COAST PETROLEUM INC | 08/24/2026 |
| DOB NOW | Plumbing | Permit Issued | FORWARD MECHANICAL CORP | 08/17/2026 |
| DOB NOW | Structural | Permit Issued | J.E. LEVINE BUILDER INC | 07/14/2026 |
| DOB NOW | Sidewalk Shed | Signed-off | REPUBLIC SCAFFOLD&HOIST C | 07/10/2026 |
| DOB NOW | General Construction | Permit Issued | J.E. LEVINE BUILDER INC | 06/10/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | AIR TECH COOLING INC | 06/08/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | J.E. LEVINE BUILDER INC | 05/29/2026 |
| DOB NOW | General Construction | Permit Issued | J.E. LEVINE BUILDER INC | 05/29/2026 |
| DOB NOW | Standpipe | Signed-off | RAEL AUTOMATIC SPR.CO INC | 05/28/2026 |
| DOB NOW | Standpipe | Signed-off | RAEL AUTOMATIC SPR.CO INC | 05/28/2026 |
| DOB NOW | Sidewalk Shed | Signed-off | REPUBLIC SCAFFOLD&HOIST C | 04/13/2026 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | REPUBLIC SCAFFOLD&HOIST C | 04/08/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | BIG SKY CONSTRUCTION | 01/28/2026 |
| DOB NOW | General Construction | Permit Issued | J.E. LEVINE BUILDER INC | 01/05/2026 |
| DOB NOW | Foundation | Signed-off | J.E. LEVINE BUILDER INC | 11/19/2025 |
| DOB NOW | Structural | Signed-off | J.E. LEVINE BUILDER INC | 11/14/2025 |
| DOB NOW | General Construction | Permit Issued | J.E. LEVINE BUILDER INC | 11/14/2025 |
| DOB NOW | Support of Excavation | Signed-off | J.E. LEVINE BUILDER INC | 11/13/2025 |
| DOB NOW | Mechanical Systems | Signed-off | AIR TECH COOLING | 11/03/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | ELM SUSPENSION SYSTEMS | 10/23/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | VENEER RESTORATION AND MA | 10/23/2025 |
| DOB NOW | Construction Fence | Permit Issued | S&E BRIDGE & SCAFFOLD LLC | 09/12/2025 |
| DOB NOW | Plumbing | Permit Issued | FORWARD HEATING CORP | 08/12/2025 |
| DOB NOW | Boiler Equipment | Signed-off | EAST COAST PETROLEUM INC | 08/06/2025 |
| DOB NOW | Structural | Signed-off | J.E. LEVINE BUILDER INC | 07/15/2025 |
| DOB NOW | General Construction | Permit Issued | J.E. LEVINE BUILDER INC | 07/15/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | BIG SKY CONSTRUCTION | 07/11/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | BIG SKY CONSTRUCTION | 07/10/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | R.C. STRUCTURES INC | 06/11/2025 |
| DOB NOW | Standpipe | Signed-off | RAEL AUTOMATIC SPR.CO INC | 06/09/2025 |
| DOB NOW | Standpipe | Signed-off | RAEL AUTOMATIC SPR.CO INC | 06/09/2025 |
| DOB NOW | Standpipe | Signed-off | RAEL AUTOMATIC SPR.CO INC | 06/06/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | REPUBLIC SCAFFOLD&HOIST C | 05/06/2025 |
| DOB NOW | Structural | Signed-off | J.E. LEVINE BUILDER INC | 04/16/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | REPUBLIC SCAFFOLD&HOIST C | 04/09/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | REPUBLIC SCAFFOLD&HOIST C | 04/08/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | R.C. STRUCTURES INC | 04/03/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 06/30/2026 | Permit Issued | J.E. LEVINE BUILDER INC | Heating and Air Conditioning Systems, Heating Systems | Heat / Cool Lg ARUM336BTE5:
(1) ARUM121BTE5
(1) ARUM216BTE5 335,700 BTU · Vrf Outdoor ×4 ARUM432BTE5: (2) ARUM121BTE5 (1) ARUM192BTE5 431,400 BTU · Vrf Outdoor ×4 ZRUM036GSS0 36,000 BTU · Vrf Outdoor ×2 ZRUN024GSS0 24,000 BTU · Vrf Outdoor ×2 |
| 09/23/2025 | Permit Issued | J.E. LEVINE BUILDER INC | Ventilation Systems | Ventilation Renewaire HE-2XJINH 1,510 CFM · Erv ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/22/2026 | Signed-off | RAEL AUTOMATIC SPR.CO INC | — |
| 06/30/2026 | Signed-off | RAEL AUTOMATIC SPR.CO INC | Sprinkler System |
| 09/23/2025 | Permit Issued | RAEL AUTOMATIC SPR.CO INC | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/30/2026 | Permit Issued | FORWARD MECHANICAL CORP | Gas, Storm, Water/Sanitary |
| 09/23/2025 | Permit Issued | FORWARD MECHANICAL CORP | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/15/2026 | Permit Issued | CENTRIFUGAL ELECTRIC LLC | General Wiring |
| 04/10/2026 | Complete | NASH ELECTRIC SERVICES IN | — |
| 12/16/2025 | Permit Issued | CENTRIFUGAL ELECTRIC LLC | General Wiring |
| 06/30/2025 | Permit Issued | TF ELECTRICAL CORP | General Wiring |
| 05/08/2025 | Complete | NASH ELECTRIC SERVICES IN | — |
| 04/15/2024 | Permit Issued | CENTRIFUGAL ELECTRIC LLC | 1 meters, 1 new_meters |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/23/2025 | Permit Issued | RAEL AUTOMATIC SPR.CO INC | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/28/2026 | Permit Issued | BIG SKY CONSTRUCTION CO | Scaffold |
| 04/08/2025 | Signed-off | REPUBLIC SCAFFOLD&HOIST C | Sidewalk Shed |
| 04/17/2024 | Permit Issued | S&E BRIDGE & SCAFFOLD LLC | Fence |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/10/2025 | Permit Issued | BIG SKY CONSTRUCTION CO | Suspended Scaffold |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/10/2025 | Permit Issued | BIG SKY CONSTRUCTION CO | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 06/22/2026 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 03/18/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/04/2026 | Pass-Final PL - Underground | Pass | View ↗ |
| 10/03/2025 | Fail-Final PL - Underground | Fail | View ↗ |
| 07/24/2025 | Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet) | Certified | View ↗ |
| 04/04/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 03/21/2025 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 03/21/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/14/2025 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 03/14/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 11/15/2024 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 11/15/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 09/04/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/27/2026 | Fenestration areas | Justin Moses | energy_progress |
| 08/27/2026 | Exterior Insulation and Finish Systems (EIFS) | RONALD GRAPIN | special |
| 08/27/2026 | Fire-Resistant Penetrations and Joints | RONALD GRAPIN | special |
| 08/27/2026 | Fenestration air leakage | Justin Moses | energy_progress |
| 08/27/2026 | Air barrier — testing | Justin Moses | energy_progress |
| 08/27/2026 | Vestibules | Justin Moses | energy_progress |
| 08/27/2026 | Fenestration and door U-factor and product ratings | Justin Moses | energy_progress |
| 08/27/2026 | Fire-Resistance Rated Construction | RONALD GRAPIN | progress |
| 08/27/2026 | Preliminary | RONALD GRAPIN | progress |
| 08/27/2026 | Insulation placement and R values | Justin Moses | energy_progress |
| 08/27/2026 | Air barrier - visual inspection | Justin Moses | energy_progress |
| 08/27/2026 | Protection of exposed foundation insulation | Justin Moses | energy_progress |
| 08/27/2026 | Energy Code Compliance Inspections | Justin Moses | progress |
| 08/27/2026 | Wall Panels, Curtain Walls, and Veneers | RONALD GRAPIN | special |
| 08/27/2026 | Sprayed fire-resistant materials | RONALD GRAPIN | special |
| 07/28/2026 | Sprinkler Systems | Jorge Santos | special |
| 07/28/2026 | Standpipe Systems | Jorge Santos | special |
| 07/15/2026 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | Jorge Santos | special |
| 06/26/2026 | Air barrier — testing | Justin Moses | energy_progress |
| 06/26/2026 | Air barrier - visual inspection | Justin Moses | energy_progress |
| 06/26/2026 | Vestibules | Justin Moses | energy_progress |
| 06/26/2026 | Fenestration air leakage | Justin Moses | energy_progress |
| 06/26/2026 | Insulation placement and R values | Justin Moses | energy_progress |
| 06/26/2026 | Fenestration areas | Justin Moses | energy_progress |
| 06/26/2026 | Fenestration and door U-factor and product ratings | Justin Moses | energy_progress |