| Owner | Filings | Most Recent |
|---|---|---|
| Douglaston Development | 70 | 10/16/2026 |
| DD 11th Ave | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| Derive Engineers | 4 | 10/15/2026 |
| S9 Architecture and Engineering | 8 | 10/08/2026 |
| I.M. Robbins | 12 | 07/22/2026 |
| Bitopi Consultants | 1 | 01/28/2026 |
| Michael Walsh | 1 | 10/23/2025 |
| George J. Xerakias, PE | 1 | 10/15/2025 |
| Jeffrey Smilow | 5 | 09/17/2025 |
| Patuxent Engineering | 6 | 09/05/2025 |
| Lombardo Professional Engineering | 1 | 06/11/2025 |
| RC Structures | 2 | 03/19/2025 |
| G. Blinn Consulting | 3 | 04/17/2024 |
| Saul Shapiro | 1 | 09/27/2021 |
| Representative | Filings | Most Recent |
|---|---|---|
| J.A.M. Associates | 48 | 03/21/2026 |
| Patuxent Engineering | 12 | 03/21/2026 |
| KD Designs | 1 | 03/21/2026 |
| A1 Expediting Service | 6 | 03/21/2026 |
| HS Design Studio | 2 | 03/21/2026 |
| Lombardo Building Consultants | 1 | 03/21/2026 |
| Rigging Consultants | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| J.E. Levine Builders | General Contractor | 20 | 07/15/2026 |
| Rael Automatic Sprinkler Co | Fire Protection | 9 | 09/29/2026 |
| Republic Scaffold & Hoist | Scaffold | 6 | 07/11/2026 |
| S&E Bridge & Scaffold | Scaffold | 4 | 09/09/2026 |
| Forward Mechanical | Plumbing | 4 | 09/19/2026 |
| Big SKY Construction Co | Scaffold | 3 | 04/09/2026 |
| Air Tech Cooling | General Contractor | 3 | 07/08/2026 |
| Pace Plumbing | Fire Protection | 3 | 07/08/2026 |
| R.C. Structures | Scaffold | 3 | 07/08/2026 |
| Centrifugal Electric | Electrical | 1 | 03/22/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| Atlas ATC Engineering | 8011 | 28 | 10/15/2026 |
| PCS Engineering | 3745 | 1 | 10/23/2025 |
| George J. Xerakias, PE | 1658 | 1 | 10/15/2025 |
| Langan Engineering, Env, Surveyin | 1265 | 2 | 10/08/2021 |
| WSP USA | 1848 | 1 | 10/08/2021 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sprinklers | Permit Issued | Rael Automatic Sprinkler Co | 09/28/2026 |
| DOB NOW | Plumbing | Permit Issued | Forward Mechanical | 09/18/2026 |
| DOB NOW | Construction Fence | Permit Issued | S&E Bridge & Scaffold | 09/08/2026 |
| DOB NOW | Boiler Equipment | Signed-off | East Coast Petroleum | 08/24/2026 |
| DOB NOW | Plumbing | Permit Issued | Forward Mechanical | 08/17/2026 |
| DOB NOW | Structural | Permit Issued | J.E. Levine Builders | 07/14/2026 |
| DOB NOW | Sidewalk Shed | Signed-off | Republic Scaffold & Hoist | 07/10/2026 |
| DOB NOW | General Construction | Permit Issued | J.E. Levine Builders | 06/10/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Air Tech Cooling | 06/08/2026 |
| DOB NOW | General Construction | Permit Issued | J.E. Levine Builders | 05/29/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | J.E. Levine Builders | 05/29/2026 |
| DOB NOW | Sprinklers | Signed-off | Rael Automatic Sprinkler Co | 05/28/2026 |
| DOB NOW | Standpipe | Signed-off | Rael Automatic Sprinkler Co | 05/28/2026 |
| DOB NOW | Sidewalk Shed | Signed-off | Republic Scaffold & Hoist | 04/13/2026 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | Republic Scaffold & Hoist | 04/08/2026 |
| DOB NOW | Supported Scaffold | Signed-off | Big SKY Construction | 01/28/2026 |
| DOB NOW | General Construction | Permit Issued | J.E. Levine Builder | 01/05/2026 |
| DOB NOW | Foundation | Signed-off | J.E. Levine Builder | 11/19/2025 |
| DOB NOW | Structural | Signed-off | J.E. Levine Builder | 11/14/2025 |
| DOB NOW | General Construction | Permit Issued | J.E. Levine Builder | 11/14/2025 |
| DOB NOW | Support of Excavation | Signed-off | J.E. Levine Builder | 11/13/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Air Tech Cooling | 11/03/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | Veneer Restoration and Ma | 10/23/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | Elm Suspension Systems | 10/23/2025 |
| DOB NOW | Construction Fence | Permit Issued | S&E Bridge & Scaffold | 09/12/2025 |
| DOB NOW | Plumbing | Permit Issued | Forward Heating | 08/12/2025 |
| DOB NOW | Boiler Equipment | Signed-off | East Coast Petroleum | 08/06/2025 |
| DOB NOW | General Construction | Permit Issued | J.E. Levine Builder | 07/15/2025 |
| DOB NOW | Structural | Signed-off | J.E. Levine Builder | 07/15/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | Big SKY Construction | 07/11/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | Big SKY Construction | 07/10/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | R.C. Structures | 06/11/2025 |
| DOB NOW | Standpipe | Signed-off | Rael Automatic Sprinkler Co | 06/09/2025 |
| DOB NOW | Standpipe | Signed-off | Rael Automatic Sprinkler Co | 06/09/2025 |
| DOB NOW | Sprinklers | Signed-off | Rael Automatic Sprinkler Co | 06/06/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | Republic Scaffold & Hoist | 05/06/2025 |
| DOB NOW | Structural | Signed-off | J.E. Levine Builder | 04/16/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | Republic Scaffold & Hoist | 04/09/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | Republic Scaffold & Hoist | 04/08/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | R.C. Structures | 04/03/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 10/15/2026 | Permit Issued | J.E. Levine Builder | Ventilation Systems | Ventilation Renewaire HE-2XJINH 1,510 CFM · Erv ×1 |
| 10/08/2026 | Permit Issued | J.E. Levine Builder | Heating and Air Conditioning Systems, Heating Systems | Heat / Cool Lg ARUM336BTE5:
(1) ARUM121BTE5
(1) ARUM216BTE5 335,700 BTU · Vrf Outdoor ×4 ARUM432BTE5: (2) ARUM121BTE5 (1) ARUM192BTE5 431,400 BTU · Vrf Outdoor ×4 ZRUM036GSS0 36,000 BTU · Vrf Outdoor ×2 ZRUN024GSS0 24,000 BTU · Vrf Outdoor ×2 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/15/2026 | Permit Issued | Rael Automatic Sprinkler Co | Sprinkler System |
| 10/08/2026 | Signed-off | Rael Automatic Sprinkler Co | Sprinkler System |
| 07/22/2026 | Signed-off | Rael Automatic Sprinkler Co | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/15/2026 | Permit Issued | Forward Mechanical | Water/Sanitary |
| 10/08/2026 | Permit Issued | Forward Mechanical | Gas, Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/15/2026 | Permit Issued | Centrifugal Electric | General Wiring |
| 04/10/2026 | Complete | Nash Electric Services | — |
| 12/16/2025 | Permit Issued | Centrifugal Electric | General Wiring |
| 06/30/2025 | Permit Issued | TF Electrical | General Wiring |
| 05/08/2025 | Complete | Nash Electric Services | — |
| 04/15/2024 | Permit Issued | Centrifugal Electric | 1 meters, 1 new_meters |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/15/2026 | Permit Issued | Rael Automatic Sprinkler Co | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/28/2026 | Signed-off | Big SKY Construction Co | Scaffold |
| 04/08/2025 | Signed-off | Republic Scaffold & Hoist | Sidewalk Shed |
| 04/17/2024 | Permit Issued | S&E Bridge & Scaffold | Fence |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/10/2025 | Permit Issued | Big SKY Construction Co | Suspended Scaffold |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/10/2025 | Permit Issued | Big SKY Construction Co | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 10/08/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 06/22/2026 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 03/18/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/24/2025 | Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet) | Certified | View ↗ |
| 04/04/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 03/21/2025 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 03/21/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/14/2025 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 03/14/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 10/13/2026 | HVAC-R and service water piping design and insulation | Jorge Santos | energy_progress |
| 10/13/2026 | HVAC-R and service water heating system controls | Jorge Santos | energy_progress |
| 10/13/2026 | HVAC-R and service water heating equipment | Jorge Santos | energy_progress |
| 10/13/2026 | Energy Code Compliance Inspections | Jorge Santos | progress |
| 10/13/2026 | Post-installed Anchors | Jorge Santos | special |
| 10/13/2026 | Fire-Resistant Penetrations and Joints | Jorge Santos | special |
| 10/13/2026 | Maintenance information | Jorge Santos | energy_progress |
| 10/01/2026 | Fenestration areas | Justin Moses | energy_progress |
| 10/01/2026 | Fenestration air leakage | Justin Moses | energy_progress |
| 10/01/2026 | Insulation placement and R values | Justin Moses | energy_progress |
| 10/01/2026 | Air barrier — testing | Justin Moses | energy_progress |
| 10/01/2026 | Fenestration and door U-factor and product ratings | Justin Moses | energy_progress |
| 10/01/2026 | Vestibules | Justin Moses | energy_progress |
| 10/01/2026 | Protection of exposed foundation insulation | Justin Moses | energy_progress |
| 10/01/2026 | Exterior Insulation and Finish Systems (EIFS) | RONALD GRAPIN | special |
| 10/01/2026 | Preliminary | RONALD GRAPIN | progress |
| 10/01/2026 | Fire-Resistance Rated Construction | RONALD GRAPIN | progress |
| 10/01/2026 | Energy Code Compliance Inspections | Justin Moses | progress |
| 10/01/2026 | Fire-Resistant Penetrations and Joints | RONALD GRAPIN | special |
| 10/01/2026 | Sprayed fire-resistant materials | RONALD GRAPIN | special |
| 10/01/2026 | Wall Panels, Curtain Walls, and Veneers | RONALD GRAPIN | special |
| 10/01/2026 | Air barrier - visual inspection | Justin Moses | energy_progress |
| 08/27/2026 | Fenestration air leakage | Justin Moses | energy_progress |
| 08/27/2026 | Air barrier - visual inspection | Justin Moses | energy_progress |
| 08/27/2026 | Insulation placement and R values | Justin Moses | energy_progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| IndieSpace | Office | Floor 1 | Project M01270867 |