DOB10/20/2023COMM'S ORDER APPROX 70' MONOPOLE SIGN STRUCTURE ON LOT. REMEDY: OWNER TO IMMEDIATELY ENGAGE A NYS PE EXPERIENCED W/MONOPOLE SIGN STRUCTURES TO INSPECT STRUCTURE INCLUDING VISUAL INSP. ENGINEERING & MATERIALS TESTING EVALUATION OF ALL COMPONENTS OF STRUCTURE & FOUNDATION ETC IMMEDIATELY NOTIFY DOB OF ANY UNSAFE CONDITION WITHIN 60 DAYS OF THIS
ECB07/11/2023NOTED: AT 51 AVENUE & 27 STREET FACADE HAS MULTIPLE CRACKS IN VARIOUS LOCATIONS, AREAS WHERE STUCCO IS MISSING, ALSO ON 51 AVENUE EXPOSED BRICKS WITH ERODED MORTAR JOINTS.$1K due
DOB12/17/2015FAILURE TO CORRECT UNLAWFUL ARTERIAL DOUBLE FACED MONOPOLE SIGN STRUCT URE THAT EXCEEDS HEIGHT & SURFACE AREA LIMITS IN AN M3-2 ZONE USE UNDE R ACCESSORY SIGN & STRUCTURE PERMITS SG400790907 & SG400791322 WAS DIS CONTINUED PER ZR 52-61 AS THE SIGN STRUCTURE WAS VACANT OR USED TO DIS PLAY ADVERTISING FOR MORE THAN 2 YEARS ANY POTENTIAL NON-CONFORMING ST
DOB12/04/2013(28-502.4) UNREG
DOB01/02/2013FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB09/05/2012FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB07/11/2012FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB05/18/2012FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB05/18/2012FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB05/18/2012FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB02/26/2001V-DOB VIOLATION - ACTIVE
ECB08/11/2015WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS. PREMISES UNDER P.C. ALT #420793056.PERMIT EXPIRED 6/2/15 L.O.C. FOLDER.APPLICATION FILED FOR SPRINKLER SYSTEM.NOTE,AT TIME OFNothing owed — awaiting certificate of correction
ECB08/11/2015WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS.PREMISES UNDER ALT #421163984 ACTIVE PERMIT. NOTE,APPROVED PLANS ON SITE INDICATE DEMOLITION OF MEZZANINE.AT TIME OF INSPECTIONothing owed — awaiting certificate of correction
ECB08/03/2012NOTED AT EAST AND NORTH EXTERIOR WALL CRACKED AND SEPERATING BRICK MASONRY PARGING THROUGHOUT W/ AREAS IN DANGER OF FALLING TO PUBLIC SIDEWALK SEVERAL VERTICAL CRACKS EXTENDING 1ST TO 2ND FLOOR ALONG 27 STREETNothing owed — awaiting certificate of correction
ECB06/07/2012FAILURE TO MAINTAIN BLDG WALL.NOTE:CRACKED & LOOSE DELAMINATING CONCRETE COVERING OF FACADE ON EAST & NORTH SIDES & DIRECTLY OVER ENTRANCE DOORS(STUCCO OVER BRICK).REM:MAINTAIN & REPAIR DEFECT.Nothing owed — awaiting certificate of correction
ECB04/13/2012FAILURE TO MAINTAIN BLDG WALLS: CRACKING & DELAMINATING CONCRETE COVERING OF BRICK WORK ON EAST & NORTH FACADES,NEAR PARAPET & FLS 1-ROOF. REMEDY: MAINTAIN & REPAIR DEFECT.Nothing owed — awaiting certificate of correction
ECB02/17/2012WORK WITHOUT PERMIT. ILLEGAL WORK NOTED:AT BLDG MEZZANINE BUILT IN FRONT WHERE WOOD CUTTING OPERATIONS TAKING PLACE. SEPARATE FROM EXISTING MEZZ. LARGE AREA BUILT USED AS DRYING PLATFORM FOR NEWLY PAINTED FURNINothing owed — awaiting certificate of correction
ECB02/17/2012FAILURE TO MAINTAIN BLDG. NOTED:A NON-FIRE PROOF STRUCTURE WITHOUT SUFFICIENT FIRE PROTECTION FOR THE TYPE OF OCCUPANCY. NOTED:EXCESSIVE SPRAYING OF FURNITURE ALSO SANDING IN PLACE. LITTLE VENTILATION IN PLACE.Nothing owed — awaiting certificate of correction
ECB02/17/2012FAILURE TO MAINTAIN BLDG. NOTED EXTERIOR WALLS LEANING,STRUCTURAL CRACKS THROUGHOUT. REM:MAKE SAFE FORTHWITH PROVIDE ENGINEERS REPORT ON REMEDIAL RECOMMENDATIONS TO DOB SPOPS UNIT.Nothing owed — awaiting certificate of correction
ECB02/17/2012FAILURE TO MAINTAIN BLDG NOTED AT TIME INSPECTION EXCESSIVE AMOUNTS OFCOMBUSTIBLE LIQUID MATERIAL THINNER PAINTS,LACKER APPROX OVER 200 GALLONS. ALSO SCATTERED IN MULTIPLE LOCATINS NOT PROPERLY STORED. REM:REMONothing owed — awaiting certificate of correction
ECB02/02/2006FAILURE TO MAINTAIN BUILDING WALL NOTED CRACK LOOSE STUCCO AND MORTAR MISSING FROM BRICK FACADE THROUGHOUT FACADE. REMEDY: MAINTAIN BUILDINGEXTERIOR.Nothing owed — awaiting certificate of correction
ECB09/28/2005FAILURE TO MAINTAIN BUILDING WALL. NOTE: CRACK, LOOSE STUCCO & MORTAR MISSING FROM BRICKS FACADE THROUGHOUT FACADE. REMEDY: MAINTAIN BUILDING.Nothing owed — awaiting certificate of correction
ECB05/25/2005FAILURE TO MAINTAIN EXTERIOR BUILDING WALL.DEFECTS NOTED:51 AVENUE FACADE HAS CRACKED,LOOSE,DELAMINATING STUCCO & OPEN MORTAR JOINTS NEAR ROOF LEVEL.REMEDY:MAINTAIN EXTERIOR BUILDING WALL.MAKE SAFE.MAKE ALL NECNothing owed — awaiting certificate of correction
ECB01/15/200520050809YLAMINATING STUCCO & OPEN MORTAR JOINTS IN BRICK WORK. REMEDY: MAINTAIN BUILDING.Nothing owed — awaiting certificate of correction
ECB08/13/2004FAILURE TO MAINTAIN EXTERIOR BUILDING WALL. DEFECTS NOTED: 51 AVENUE FACADE; STREET LEVEL AT SIDEWALK HAS LOOSE BRICKS, OPEN MORTAR JOINTS AND MISSING STUCCO. SAME LOCATION AT ROOF LEVEL PARAPET HAS CRACKED,Nothing owed — awaiting certificate of correction
ECB02/04/2004FAILURE TO MAINTAIN EXTERIOR BUILDING WALL:NOTE ON 51 AVE FACADE LOOSEBRICKS AND MORTAR MISSING AT FIRST FLOOR AND 2ND FLOOR LOOSE STUCCO A ND CRACKS IN STUCCO DELAMINATING FROM BUILDING AT VARIOUS LOCATIONNothing owed — awaiting certificate of correction