← Back
One story - permanent living quarter
51-04 DOUGLASTON PARKWAY
QUEENS · Douglaston-Little Neck · BIN 4169936
💬 Discuss this project
1920Year Built
1.75Stories
A2Building Class
R1-2Zoning
2,240 sfGross Floor Area
1Units
One story - permanent living quarter · 6,783 sf lot · 0.33 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction23p · 1 filing · 20 docs
Floor 1Under Construction23p · 1 filing · 20 docs
CellarUnder Construction25p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/17/2023$1.1M—— → —$492/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NASIR J, KHANZADA LLC606/05/2026
TOM PETERSEN ARCHITECT, LLC212/04/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NASIR J. KHANZADA LLC1003/21/2026
KAMTECH RESTORATION CORP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CHANDRABALI RAMANANDGeneral Contractor403/21/2026
NEFCO ENTERPRISES INCGeneral Contractor204/09/2026
SAMUEL & SONS P & H INCPlumbing207/08/2026
JOSEPH WEINSTEIN ELECTRICElectrical103/22/2026
KAMTECH RESTORATION CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NASIR J. KHANZADA LLC1527506/05/2026
THOMAS PETERSEN ARCHITECT7854212/04/2025
Building Lifecycle
All (57)Filed (8)Permit Issued (7)Signed Off (2)Inspection (8)Objection (2)Special Inspection (30)
08/20/2026
Special inspection requirement — HVAC-R and service water heating system controls
Nasir Khanzada
08/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nasir Khanzada
08/20/2026
Special inspection requirement — HVAC-R and service water heating equipment
Nasir Khanzada
08/20/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Nasir Khanzada
08/20/2026
Special inspection requirement — Energy Code Compliance Inspections
Nasir Khanzada
08/20/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Nasir Khanzada
08/20/2026
Special inspection requirement — Maintenance information
Nasir Khanzada
08/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Nasir Khanzada
07/10/2026
Objection resolved — Resolved
07/09/2026
Objection raised — Other
06/18/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/08/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
06/05/2026
Filed — Alteration CO
PLUMBING APPLICATION FILLING IN-CONJUNCTION WITH ALT-1 APPLICATION INTERIOR RENOVATION AND SECOND FLOOR EXTENSION OF EXISTING ONE FAMILYDWELLING HOUSE
Q01056320-P4
06/05/2026
Special inspection requirement — Energy Code Compliance Inspections
Nasir Khanzada
06/05/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Nasir Khanzada
06/05/2026
Special inspection requirement — HVAC-R and service water heating equipment
Nasir Khanzada
06/05/2026
Special inspection requirement — Maintenance information
Nasir Khanzada
06/05/2026
Special inspection requirement — HVAC-R and service water heating system controls
Nasir Khanzada
06/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nasir Khanzada
06/05/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Nasir Khanzada
06/05/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Nasir Khanzada
06/04/2026
Special inspection requirement — Interior lighting power
Nasir Khanzada
06/04/2026
Special inspection requirement — Fenestration areas
Nasir Khanzada
06/04/2026
Special inspection requirement — Electric vehicle service equipment requirements
Nasir Khanzada
06/04/2026
Special inspection requirement — Maintenance information
Nasir Khanzada
06/04/2026
Special inspection requirement — Insulation placement and R values
Nasir Khanzada
06/04/2026
Special inspection requirement — Permanent certificate
Nasir Khanzada
06/04/2026
Special inspection requirement — Fenestration air leakage
Nasir Khanzada
06/04/2026
Special inspection requirement — Structural Wood Frame
Nasir Khanzada
06/04/2026
Special inspection requirement — Fire-Resistance Rated Construction
Nasir Khanzada
06/04/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Nasir Khanzada
06/04/2026
Special inspection requirement — Energy Code Compliance Inspections
Nasir Khanzada
06/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nasir Khanzada
06/04/2026
Special inspection requirement — Final
Nasir Khanzada
06/04/2026
Special inspection requirement — Air barrier - visual inspection
Nasir Khanzada
05/15/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/20/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/06/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/16/2026
Permit issued — Plumbing
Q01056320-S2-PL
02/19/2026
Signed off — Alteration CO
PLUMBING APPLICATION FILLING IN-CONJUNCTION WITH ALT-1 APPLICATION INTERIOR RENOVATION AND SECOND FLOOR EXTENSION OF EXISTING ONE FAMILYDWELLING HOUSE
Q01056320-S1
12/16/2025
Signed off — Alteration
ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Q01243784-I1
12/11/2025
Filed — Alteration CO
PLUMBING APPLICATION FILLING IN-CONJUNCTION WITH ALT-1 APPLICATION INTERIOR RENOVATION AND SECOND FLOOR EXTENSION OF EXISTING ONE FAMILYDWELLING HOUSE
Q01056320-P3
12/04/2025
Filed — Alteration
ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Q01243784-P1
12/01/2025
Permit issued — General Construction
Q01056320-I1-GC-CX
10/30/2025
Filed — Alteration CO
PLUMBING APPLICATION FILLING IN-CONJUNCTION WITH ALT-1 APPLICATION INTERIOR RENOVATION AND SECOND FLOOR EXTENSION OF EXISTING ONE FAMILYDWELLING HOUSE
Q01056320-P2
10/27/2025
Permit issued — Construction Fence
Q01056320-S1-FN
09/16/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/16/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/25/2025
Permit issued — Solar
Q01243784-I1-SL
06/20/2025
Filed — Alteration
ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Q01243784-I1
04/23/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/23/2025
Permit issued — Plumbing
Q01056320-S2-PL
11/29/2024
Permit issued — Structural
Q01056320-I1-GC-CX
11/20/2024
Permit issued — Construction Fence
Q01056320-S1-FN
05/30/2024
Filed — Alteration CO
PLUMBING APPLICATION FILLING IN-CONJUNCTION WITH ALT-1 APPLICATION INTERIOR RENOVATION AND SECOND FLOOR EXTENSION OF EXISTING ONE FAMILYDWELLING HOUSE
Q01056320-S2
05/24/2024
Filed — Alteration CO
PLUMBING APPLICATION FILLING IN-CONJUNCTION WITH ALT-1 APPLICATION INTERIOR RENOVATION AND SECOND FLOOR EXTENSION OF EXISTING ONE FAMILYDWELLING HOUSE
Q01056320-S1
05/24/2024
Filed — Alteration CO
PLUMBING APPLICATION FILLING IN-CONJUNCTION WITH ALT-1 APPLICATION INTERIOR RENOVATION AND SECOND FLOOR EXTENSION OF EXISTING ONE FAMILYDWELLING HOUSE
Q01056320-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedSAMUEL & SONS P & H INC03/16/2026
DOB NOWGeneral ConstructionPermit IssuedNEFCO ENTERPRISES INC12/01/2025
DOB NOWConstruction FenceSigned-offCHANDRABALI RAMANAND10/27/2025
DOB NOWSolarSigned-offKAMTECH RESTORATION CORP06/25/2025
DOB NOWPlumbingPermit IssuedSAMUEL & SONS P & H INC01/23/2025
DOB NOWStructuralPermit IssuedNEFCO ENTERPRISES INC11/29/2024
DOB NOWConstruction FenceSigned-offCHANDRABALI RAMANAND11/20/2024
1 project · most recent 06/05/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/05/2026Permit IssuedSAMUEL & SONS P & H INCGas, Storm, Water/Sanitary
3 projects · most recent 08/05/2025
General Wiring
FiledStatusContractorScope
08/05/2025CompleteJOSEPH WEINSTEIN ELECTRIC1 meters
05/30/2025CompleteBERGER QUALITY ELEC'L CON—
11/26/2024Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
06/18/2026Pass-Final General Construction Non-Directive 14PassView ↗
06/08/2026Fail-Final General Construction Non-Directive 14FailView ↗
05/15/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/20/2026Fail-Final General Construction Non-Directive 14FailView ↗
04/06/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/16/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/16/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/23/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 70
DateRequirementInspectorRole
08/20/2026Fire-Resistant Penetrations and JointsNasir Khanzadaspecial
08/20/2026Maintenance informationNasir Khanzadaenergy_progress
08/20/2026HVAC-R and service water heating system controlsNasir Khanzadaenergy_progress
08/20/2026HVAC-R and service water piping design and insulationNasir Khanzadaenergy_progress
08/20/2026HVAC-R and service water heating equipmentNasir Khanzadaenergy_progress
08/20/2026Energy Code Compliance InspectionsNasir Khanzadaprogress
08/20/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationNasir Khanzadaspecial
08/20/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesNasir Khanzadaspecial
06/05/2026Fire-Resistant Penetrations and JointsNasir Khanzadaspecial
06/05/2026HVAC-R and service water heating equipmentNasir Khanzadaenergy_progress
06/05/2026Maintenance informationNasir Khanzadaenergy_progress
06/05/2026HVAC-R and service water piping design and insulationNasir Khanzadaenergy_progress
06/05/2026HVAC-R and service water heating system controlsNasir Khanzadaenergy_progress
06/05/2026Energy Code Compliance InspectionsNasir Khanzadaprogress
06/05/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesNasir Khanzadaspecial
06/05/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationNasir Khanzadaspecial
06/04/2026Fenestration air leakageNasir Khanzadaenergy_progress
06/04/2026Structural Steel - WeldingNasir Khanzadaspecial
06/04/2026Concrete - Cast-In-PlaceNasir Khanzadaspecial
06/04/2026Construction Utilizing CLT or SCL, Type IV—special
06/04/2026Structural Stability – Alterations of existing buildingsNasir Khanzadaspecial
06/04/2026MasonryNasir Khanzadaspecial
06/04/2026Structural Steel - High Strength BoltingNasir Khanzadaspecial
06/04/2026Fire-Resistant Penetrations and JointsNasir Khanzadaspecial
06/04/2026Energy Code Compliance InspectionsNasir Khanzadaprogress
Latest 25 of 70.
▾Documents — 65 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/22/2026Q01056320-S2Request digital key ↗
08/22/2026Q01056320-P4Request digital key ↗
08/19/2026Q01243784-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram4
08/16/2026Q01056320-P3Open ↗
08/16/2026Q01056320-I1Open ↗
08/13/2026Q01056320-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026Q01056320-P3Open ↗
08/13/2026Q01056320-I1Open ↗
▸Seals & Professional Certifications31
▸DOB NOWProgress Inspector Seal & Signature13
09/25/2026Q01056320-P2Open ↗
09/25/2026Q01056320-P2Open ↗
08/28/2026Q01243784-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/22/2026Q01056320-S2Open ↗
08/22/2026Q01056320-P4Open ↗
08/16/2026Q01056320-P4Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/25/2026Q01056320-P2Open ↗
08/28/2026Q01243784-I1Open ↗
08/27/2026Q01056320-P4Open ↗
Showing 3 of 8 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/16/2026Q01056320-P3Open ↗
08/16/2026Q01056320-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/16/2026Q01056320-P3Open ↗
08/16/2026Q01056320-P2Open ↗
08/16/2026Q01056320-S2Open ↗
Showing 3 of 7 on file for this type
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01243784-I1Open ↗
▸Other Documents8
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q01056320-P3Open ↗
08/13/2026Q01056320-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/16/2026Q01056320-P3Open ↗
08/16/2026Q01056320-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026Q01056320-P3Open ↗
08/13/2026Q01056320-I1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026Q01056320-I1Open ↗
08/13/2026Q01056320-P3Open ↗