← Back
BuildNYC
Two stories - detached, small or mid-size
51-07 90TH STREET
QUEENS · Elmhurst · BIN 4045745
💬 Discuss this project
1920Year Built
2.5Stories
A1Building Class
R5Zoning
1,620 sfGross Floor Area
1Units
0 Active Violations
Two stories - detached, small or mid-size · 3,183 sf lot · 0.51 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
AtticInterior renovationUnder Construction6p · 2 filings · 20 docs
Floor 2Interior renovationUnder Construction10p · 2 filings · 20 docs
Floor 1Interior renovationUnder Construction6p · 2 filings · 20 docs
CellarInterior renovationUnder Construction12p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Formactiv409/10/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Pantocraft203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Phoenikx NYGeneral Contractor109/16/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Formactiv Architecture3024309/10/2026
Building Lifecycle
All (43)Filed (4)Permit Issued (1)Violation (2)Objection (6)Special Inspection (30)
09/15/2026
Permit issued — General Construction
Q01439774-I1-GC
09/10/2026
Filed — Alteration
Interior single-family renovation as per plans filed herewith. No change to use, egress, or occupancy under this application.
Q01439774-P1
09/09/2026
Special inspection requirement — Interior lighting power
Ron Eng
09/09/2026
Special inspection requirement — Fire-Resistance Rated Construction
Ron Eng
09/09/2026
Special inspection requirement — Final
Ron Eng
09/09/2026
Special inspection requirement — Energy Code Compliance Inspections
Ron Eng
09/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ron Eng
09/09/2026
Special inspection requirement — Permanent certificate
Ron Eng
09/09/2026
Special inspection requirement — Electric vehicle service equipment requirements
Ron Eng
09/09/2026
Special inspection requirement — Maintenance information
Ron Eng
08/05/2026
Filed — Alteration
Interior single-family renovation as per plans filed herewith. No change to use, egress, or occupancy under this application.
Q01439774-S1
08/05/2026
Filed — Alteration
Interior single-family renovation as per plans filed herewith. No change to use, egress, or occupancy under this application.
Q01439774-I1
08/05/2026
Special inspection requirement — Maintenance information
Ron Eng
08/05/2026
Special inspection requirement — Interior lighting power
Ron Eng
08/05/2026
Special inspection requirement — Energy Code Compliance Inspections
Ron Eng
08/05/2026
Special inspection requirement — Permanent certificate
Ron Eng
08/05/2026
Special inspection requirement — Electric vehicle service equipment requirements
Ron Eng
08/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ron Eng
08/04/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Ron Eng
08/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ron Eng
08/04/2026
Special inspection requirement — Energy Code Compliance Inspections
Ron Eng
08/04/2026
Special inspection requirement — Fire-Resistance Rated Construction
Ron Eng
08/02/2026
Special inspection requirement — Final
Ron Eng
07/01/2026
Objection raised — Scope
06/08/2026
Objection resolved — Addressed
06/08/2026
Objection resolved — Addressed
03/12/2026
Objection raised — Zoning
03/12/2026
Objection raised — Scope
03/12/2026
Objection raised — Zoning
02/04/2026
Filed — Alteration
Renovate 1-family residential home with 2nd floor front extension as per plans filed herewith. No change to use, egress, or occupancy under this application.
Q01346807-I1
01/30/2026
Special inspection requirement — Insulation placement and R values
01/30/2026
Special inspection requirement — Air barrier - visual inspection
01/30/2026
Special inspection requirement — Fenestration air leakage
01/30/2026
Special inspection requirement — Interior lighting power
01/30/2026
Special inspection requirement — Lighting controls
01/30/2026
Special inspection requirement — Fenestration areas
01/30/2026
Special inspection requirement — Permanent certificate
01/30/2026
Special inspection requirement — Electric vehicle service equipment requirements
01/30/2026
Special inspection requirement — Air barrier — testing
01/30/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
01/30/2026
Special inspection requirement — Fire-Resistance Rated Construction
10/26/2008
Violation issued (ECB, closed)
Construction
10/26/2008
Violation issued (ECB, closed)
Unknown
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedPhoenikx NY09/15/2026
1 project · most recent 09/10/2026
Gas Water/Sanitary
FiledStatusContractorScope
09/10/2026——Gas, Water/Sanitary
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
09/09/2026Interior lighting powerRon Engenergy_progress
09/09/2026Fire-Resistance Rated ConstructionRon Engprogress
09/09/2026FinalRon Engprogress
09/09/2026Energy Code Compliance InspectionsRon Engprogress
09/09/2026Fire-Resistant Penetrations and JointsRon Engspecial
09/09/2026Permanent certificateRon Engenergy_progress
09/09/2026Electric vehicle service equipment requirementsRon Engenergy_progress
09/09/2026Maintenance informationRon Engenergy_progress
08/05/2026Maintenance informationRon Engenergy_progress
08/05/2026Interior lighting powerRon Engenergy_progress
08/05/2026Energy Code Compliance InspectionsRon Engprogress
08/05/2026Permanent certificateRon Engenergy_progress
08/05/2026Electric vehicle service equipment requirementsRon Engenergy_progress
08/04/2026Fire-Resistant Penetrations and JointsRon Engspecial
08/04/2026HVAC-R and service water piping design and insulationRon Engenergy_progress
08/04/2026Fire-Resistant Penetrations and JointsRon Engspecial
08/04/2026Energy Code Compliance InspectionsRon Engprogress
08/04/2026Fire-Resistance Rated ConstructionRon Engprogress
08/02/2026FinalRon Engprogress
01/30/2026Insulation placement and R values—energy_progress
01/30/2026Air barrier - visual inspection—energy_progress
01/30/2026Fenestration air leakage—energy_progress
01/30/2026Interior lighting power—energy_progress
01/30/2026Lighting controls—energy_progress
01/30/2026Fenestration areas—energy_progress
Latest 25 of 35.
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/17/2026Q01346807-I1Request digital key ↗
08/16/2026Q01439774-S1Request digital key ↗
08/16/2026Q01439774-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01346807-I1Open ↗
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature7
09/23/2026Q01439774-P1Open ↗
09/23/2026Q01439774-P1Open ↗
09/23/2026Q01439774-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/15/2026Q01439774-P1Open ↗
08/16/2026Q01439774-I1Open ↗
08/16/2026Q01439774-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
09/23/2026Q01439774-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/28/2026Q01439774-I1Open ↗
09/15/2026Q01439774-P1Open ↗
▸Other Documents3
▸DOB NOWSite Survey: Initial1
08/13/2026Q01346807-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/17/2026Q01346807-I1Open ↗
▸DOB NOWPlot Diagram1
08/17/2026Q01346807-I1Open ↗