51-09 VAN LOON STREET
QUEENS · Elmhurst · BIN 4038762
💬 Discuss this project
2022Year Built
4Stories
C0Building Class
R5Zoning
2,811 sfGross Floor Area
3Units
3 Active Violations 0 unresolved · 3 paperwork only ▸
Three families · 2,250 sf lot · 1.25 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofNew 3-family BuildingUnder Construction31p · 3 filings · 20 docs
Floor 4New 3-family BuildingUnder Construction30p · 3 filings · 20 docs
Floor 3New 3-family BuildingUnder Construction31p · 3 filings · 20 docs
Floor 2New 3-family BuildingUnder Construction29p · 3 filings · 20 docs
Floor 1New drop curb installationUnder Construction30p · 4 filings · 20 docs
CellarNew 3-family BuildingUnder Construction32p · 3 filings · 20 docs
Site & exteriorNew 3-family BuildingUnder Construction36p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
W & H Development403/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/17/2020$433K—U.S. BANK NA, SUCCESSOR TRUSTEE TO BANK OF AMERICA → Private party— not available
01/30/2020$552K—Private party → U.S. BANK NA— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ameriland Brook502/28/2026
Brian Ill Development112/15/2025
LMW Engineering Group105/08/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Ameriland Brook403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Watson's Plumbing, Heating, & BuildingPlumbing907/08/2026
THC ConstructionGeneral Contractor903/21/2026
THC ConstructionScaffold303/21/2026
TT&T ConstructionGeneral Contractor203/21/2026
Stream Rock ContsructionGeneral Contractor211/14/2026
Stream Rock ContsructionScaffold107/08/2026
AL-Lectric Elect'l ContractingElectrical103/21/2026
Fortun Design & ConstructionGeneral Contractor109/30/2008
Fortun Design & ConstructionGeneral Contractor110/14/2008
Vera ConstructionGeneral Contractor310/23/2007
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Ameriland Brook1506205/01/2023
HRF Services5616106/25/2021
Building Lifecycle
11/13/2026
Permit issued — Curb Cut
Q00655128-I1-CC
11/11/2026
Signed off — New Building
INSTALL 8' TEMPORARY CONSTRUNCTION FENCE AT THE ABOVE ADDRESS
Q00547218-S2
07/06/2026
Permit renewed — Earth Work
Renewed with changes
Q00547218-I1-GC-CX
06/11/2026
Closed: Proposd 4-story steel bldg undr ceu audit,complaints #4917222,#4917220 &#4917185.pswo in effect since march 2023.the engineer/TR1 for project…
DOB violation · closed on the city's record
05/21/2026
Permit expired, never signed off — Sprinklers
The city's record still shows this permit as issued, with no sign-off on its filing
Q00646195-I1-PL
66 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutPermit IssuedStream Rock Contsruction11/13/2026
DOB NOWEarth WorkPermit IssuedStream Rock Contsruction07/06/2026
DOB NOWConstruction FenceSigned-offStream Rock Contsruction05/18/2026
DOB NOWConstruction FenceSigned-offTHC Construction12/16/2025
DOB NOWPlumbingPermit IssuedWatson's Plumbing, Heating, & Building05/21/2025
DOB NOWGeneral ConstructionPermit IssuedTHC Construction05/13/2025
DOB NOWFoundationPermit IssuedTHC Construction04/16/2025
DOB NOWPlumbingPermit IssuedWatson's Plumbing, Heating, & Building03/07/2024
DOB NOWEarth WorkPermit IssuedTHC Construction03/06/2024
DOB NOWPlumbingPermit IssuedWatson's Plumbing, Heating, & Building10/28/2022
DOB NOWFoundationPermit IssuedTT&T Construction07/15/2022
BISEQISSUEDFortun Design & Construction10/14/2008
BISOTISSUEDFortun Design & Construction09/30/2008
BIS—ISSUEDVera Construction10/23/2007
BIS—ISSUEDVera Construction10/23/2007
BISEQISSUEDVera Construction10/23/2007
1 project · most recent 12/11/2021
FiledStatusContractorScope
12/11/2021———
1 project · most recent 12/11/2021
Gas Storm Water/Sanitary
FiledStatusContractorScope
12/11/2021Permit IssuedWatson's Plumbing, Heating, & BuildingGas, Storm, Water/Sanitary
1 project · most recent 06/07/2023
General Wiring
FiledStatusContractorScope
06/07/2023Permit IssuedAL-Lectric Elect'l ContractingGeneral Wiring
1 project · most recent 02/28/2026
Concrete
FiledStatusContractorScope
02/28/2026Permit IssuedStream Rock ContsructionConcrete
1 project · most recent 02/28/2026
Fence
FiledStatusContractorScope
02/28/2026Permit IssuedStream Rock ContsructionFence
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
06/30/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/30/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/30/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/30/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/30/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
05/07/2025Masonry—special
05/07/2025Fire-Resistance Rated Construction—progress
05/06/2025Final—progress
05/06/2025Concrete - Cast-In-Place—special
05/06/2025Fire-Resistant Penetrations and Joints—special
05/06/2025Structural Steel - High Strength Bolting—special
05/06/2025Structural Steel - Details—special
05/06/2025Structural Steel - Welding—special
12/11/2021HVAC-R and service water piping design and insulationXIAOHONG ZHAOenergy_progress
12/11/2021HVAC-R and service water heating system controlsXIAOHONG ZHAOenergy_progress
12/11/2021Permanent certificateXIAOHONG ZHAOenergy_progress
12/11/2021Mechanical Systems—special
12/11/2021Final—progress
12/11/2021Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
12/11/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationXIAOHONG ZHAOspecial
12/11/2021Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesXIAOHONG ZHAOspecial
12/11/2021Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
12/11/2021MeteringXIAOHONG ZHAOenergy_progress
12/11/2021Maintenance informationXIAOHONG ZHAOenergy_progress
12/11/2021HVAC-R and service water heating equipmentXIAOHONG ZHAOenergy_progress
12/10/2021Sprinkler SystemsXIAOHONG ZHAOspecial
61 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account