← Back
BuildNYC
Elevator apt, semi-fireproof without stores
51-15 VAN KLEECK STREET
QUEENS · Elmhurst · BIN 4057229
💬 Discuss this project
1960Year Built
6Stories
D1Building Class
R6BZoning
74,600 sfGross Floor Area
88Units
LL97 CoveredRent Stabilized57 Active Violations ▸FISP: SWARMPFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: 51-15 Van Kleeck Street Associates · 27,125 sf lot · 2.75 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofSamson Management LLC4p · 1 filing · 5 docs
Floor 6Samson Management LLC4p · 1 filing · 5 docs
Floor 5Samson Management LLC4p · 1 filing · 5 docs
Floor 4Samson Management LLC4p · 1 filing · 5 docs
Floor 3Samson Management LLC4p · 1 filing · 5 docs
Floor 2Samson Management LLC4p · 1 filing · 5 docs
Floor 1Samson Management LLC4p · 1 filing · 5 docs
CellarSamson Management LLC4p · 2 filings · 12 docs
Filed — no permit issuedSamson Management LLC9p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
51-15 Van Kleeck Street Associates303/22/2026
51-25 Van Kleeck203/21/2026
51-15 Van Kleeck Associates203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Pace Engineering104/03/2026
New York & Company209/30/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
New York & Company203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Vlashava Electric ContractingElectrical103/22/2026
Futura Builders GroupGeneral Contractor103/21/2026
Laundro CombustionGeneral Contractor103/21/2026
Outdoor InstallationsGeneral Contractor103/21/2026
S A Supply ConstructionGeneral Contractor103/21/2026
Abilenespecialty_contractor103/21/2026
Abilenespecialty_contractor103/21/2026
Communication Component SGeneral Contractor112/13/2022
KNS Building RestGeneral Contractor106/02/2011
Squan Construction ServicesGeneral Contractor210/21/2016
Telcom Engineering GroupGeneral Contractor209/18/2006
Triera ContractingGeneral Contractor111/14/2016
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Pace Engineering1679104/03/2026
New York Engineering Associates851209/30/2021
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 9, sub-cycle A)
The filing window opened 02/21/2025. No Cycle 9 filing on record yet
08/17/2026
Elevator Category 1 inspection report filed
06/21/2026
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM…
HPD violation · open
06/21/2026
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM NORTH…
HPD violation · open
05/26/2026
Boiler inspection report filed
Initial · no defects · Accepted
246 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offAbilene12/01/2021
DOB NOWBoiler EquipmentSigned-offAbilene11/16/2021
BISOTISSUEDCommunication Component S12/13/2022
BISOTISSUEDFutura Builders Group07/31/2017
BISOTISSUEDLaundro Combustion03/03/2017
BISOTISSUEDFutura Builders Group02/02/2017
BISOTISSUEDFutura Builders Group11/30/2016
BISEQISSUEDTriera Contracting11/14/2016
BISOTISSUEDSquan Construction Services10/21/2016
BISOTISSUEDSquan Construction Services07/27/2016
BISOTISSUEDKNS Building Restoration06/02/2011
BISEQISSUEDOutdoor Installations02/22/2011
BISOTISSUEDTelcom Engineering GP09/18/2006
BISOTISSUEDTelcom Engineering GP08/15/2006
BISOTISSUEDS&A Supply & Construction01/28/1999
9 projects · most recent 04/23/2026
Boiler Controls
FiledStatusContractorScope
04/23/2026CompleteVlashava Electric Contracting—
01/31/2022CompleteAbilene ElectricBoiler Controls
11/15/2021CompleteAbilene Electric—
04/30/2021CompleteLeone Electric—
03/17/2020CompleteVlashava Electric Contracting—
02/27/2020CompleteVlashava Electric Contracting—
01/23/2019CompleteVlashava Electric Contracting—
12/28/2018CompleteVlashava Electric Contracting—
05/23/2018CompleteVlashava Electric Contracting—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
04/13/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
04/29/2025Energy Code Compliance InspectionsBaris Acarprogress
04/25/2025MasonryBaris Acarspecial
04/25/2025FinalBaris Acarprogress
04/25/2025Tenant Protection Plan Compliance—special
04/25/2025Structural Stability – Alterations of existing buildingsBaris Acarspecial
08/20/2021Chimneys and ventsLOUIS ARENAspecial
08/19/2021Fuel-Oil Storage and Fuel-Oil Piping SystemsLOUIS ARENAspecial
08/19/2021FinalLOUIS ARENAprogress
08/19/2021Mechanical SystemsLOUIS ARENAspecial
08/19/2021Maintenance informationLOUIS ARENAenergy_progress
08/19/2021HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
08/19/2021HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
08/19/2021Heating SystemsLOUIS ARENAspecial
137 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account