← Back
Contractors warehouse
51-22 58 PLACE
QUEENS · BIN 4054159
💬 Discuss this project
2020Year Built
1.5Stories
E2Building Class
M1-1Zoning
8,668 sfGross Floor Area
1Units
0 Open Violations
Contractors warehouse · Owner of record: 47 BRIDGEWATER CORP. · 9,366 sf lot · 0.93 FAR built · Flood zone X
Locations of Work
StructuralPlumbing
Roof1p · 1 filing · 5 docs
Mezzanine2p · 1 filing · 5 docs
Cellar1p · 1 filing · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CLASSIC CONSULTING GROUP307/08/2026
5122 HBH1007/08/2026
ATLANTIC AVE 86 LLC1303/22/2026
SAFA CORP1103/22/2026
ALL STATE 12 GENERAL CONT603/22/2026
426 HBH903/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/20/2022$4.6M—— → —$531/sf building
10/21/2019$1.6M—5122 HBH LLC → 58TH PLACE LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NYX ENGINEERING, PLLC410/11/2023
TABRIZ DESIGN GROUP305/03/2021
GREEN DESIGN110/28/2019
A & T ENGINEERING, P.C.112/12/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
TABRIZ DESIGN GROUP303/21/2026
S Y CONSULTING VIOLATIONS203/21/2026
ATLANTIC BUILDING SUPPLY INC.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALL STATE 12 GENERAL CONTRACTINGGeneral Contractor1307/08/2026
YU HUA CONSTRUCTION CORPGeneral Contractor203/21/2026
AL-LECTRIC ELECT'L CONTRGElectrical103/22/2026
CLASSIC CONSULTING GROUPGeneral Contractor107/08/2026
BEST PLUMBING & HVAC INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NYX ENGINEERING, PLLC6118210/11/2023
Building Lifecycle
All (63)Filed (9)Permit Issued (8)Signed Off (6)Violation (11)Inspection (5)Objection (8)Special Inspection (16)
10/24/2023
Signed off — Alteration
Filing for plumbing work type for the installation of gas fired heaters at the existing warehouse. No change in use, egress or occupancy.
Q08012001-I1
10/17/2023
Special inspection requirement — HVAC-R and service water heating system controls
Xiao Huang
10/17/2023
Special inspection requirement — Mechanical Systems
Xiao Huang
10/17/2023
Special inspection requirement — Fire-Resistance Rated Construction
Xiao Huang
10/17/2023
Special inspection requirement — Final
YUNHO LEE
10/17/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Xiao Huang
10/17/2023
Special inspection requirement — HVAC-R and service water heating equipment
Xiao Huang
10/13/2023
Signed off — Alteration
Filing for plumbing work type for the installation of gas fired heaters at the existing warehouse. No change in use, egress or occupancy.
Q08012001-S1
10/11/2023
Filed — Alteration
Filing for plumbing work type for the installation of gas fired heaters at the existing warehouse. No change in use, egress or occupancy.
Q08012001-P2
10/03/2023
Special inspection requirement — Mechanical Systems
Xiao Huang
10/03/2023
Special inspection requirement — HVAC-R and service water heating system controls
Xiao Huang
10/03/2023
Special inspection requirement — HVAC-R and service water heating equipment
Xiao Huang
10/03/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Xiao Huang
10/03/2023
Special inspection requirement — Final
YUNHO LEE
10/03/2023
Special inspection requirement — Fire-Resistance Rated Construction
Xiao Huang
06/23/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/12/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/12/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/18/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/18/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/29/2023
Permit issued — Plumbing
Q08012001-S1-PL
02/15/2023
Objection resolved — Addressed
01/06/2023
Objection raised — Mechanical
01/05/2023
Filed — Alteration
Filing for plumbing work type for the installation of gas fired heaters at the existing warehouse. No change in use, egress or occupancy.
Q08012001-P1
11/01/2022
Objection raised — Scope
11/01/2022
Objection resolved — Addressed
10/31/2022
Permit issued — General Construction
Q08012001-I1-GC-CX
10/27/2022
Filed — Alteration
Filing for plumbing work type for the installation of gas fired heaters at the existing warehouse. No change in use, egress or occupancy.
Q08012001-S1
10/13/2022
Objection raised — Scope
10/13/2022
Objection resolved — Addressed
10/13/2022
Objection raised — Mechanical
10/13/2022
Objection resolved — Addressed
10/05/2022
Filed — Alteration
Filing for plumbing work type for the installation of gas fired heaters at the existing warehouse. No change in use, egress or occupancy.
Q08012001-I1
05/11/2021
Signed off — Alteration
25' WIDE CURB CUT IN CONJUNCTION WITH APPLICATION NUMBER NB.421676421 & BPP 421895113
Q00164209-I1
05/04/2021
Permit issued — Curb Cut
Q00164209-I1-CC
05/03/2021
Filed — Alteration
25' WIDE CURB CUT IN CONJUNCTION WITH APPLICATION NUMBER NB.421676421 & BPP 421895113
Q00164209-I1
12/08/2020
Signed off — Alteration
structural work in conjunction with new building application # 421676421. CHANGE BEAM SIZE AND REMOVE ONE COLUMN
Q00256390-I1
12/03/2020
Signed off — Alteration
THIS JOB IS FILED FOR CONSTRUCTION FENCE FOR DEMOLITION WORK AT 51-22 58 PL.
Q00109159-I1
09/30/2020
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE.
Q00254368-I1
11/15/2019
Filed — Alteration
structural work in conjunction with new building application # 421676421. CHANGE BEAM SIZE AND REMOVE ONE COLUMN
Q00256390-P1
11/15/2019
Special inspection requirement — Final
HARI SONI
11/14/2019
Permit issued — Structural
Q00256390-I1-ST
10/31/2019
Filed — Alteration
structural work in conjunction with new building application # 421676421. CHANGE BEAM SIZE AND REMOVE ONE COLUMN
Q00256390-I1
10/29/2019
Permit issued — Sidewalk Shed
Q00254368-I1-SH
10/28/2019
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE.
Q00254368-I1
10/28/2019
Special inspection requirement — Final
BRIAN T. O'CONNOR
10/25/2019
Violation issued (ECB, closed)
Construction
10/25/2019
Violation issued (ECB, closed)
Construction
10/25/2019
Violation issued (ECB, closed)
Construction
10/25/2019
Violation issued (ECB, closed)
Construction
10/24/2019
Violation issued (ECB, closed)
Site Safety
10/24/2019
Violation issued (ECB, closed)
Construction
09/20/2019
Permit issued — Construction Fence
Q00109159-I1-FN
09/04/2019
Permit issued — Construction Fence
Q00109159-I1-FN
12/12/2018
Filed — Alteration
THIS JOB IS FILED FOR CONSTRUCTION FENCE FOR DEMOLITION WORK AT 51-22 58 PL.
Q00109159-I1
12/12/2018
Permit issued — Construction Fence
Q00109159-I1-FN
12/11/2018
Special inspection requirement — Final
ROBERT LIN
12/11/2018
Special inspection requirement — Preliminary
ROBERT LIN
06/23/2009
Violation issued (ECB, closed)
Unknown
12/05/2000
Violation issued (ECB, closed)
Quality of Life
Latest 60 of 63 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offBEST PLUMBING & HVAC INC03/29/2023
DOB NOWGeneral ConstructionSigned-offYU HUA CONSTRUCTION CORP10/31/2022
DOB NOWCurb CutSigned-offALL STATE 12 GENERAL CONT05/04/2021
DOB NOWStructuralSigned-offALL STATE 12 GENERAL CONT11/14/2019
DOB NOWSidewalk ShedSigned-offCLASSIC CONSULTING GROUP10/29/2019
DOB NOWConstruction FenceSigned-offALL STATE 12 GENERAL CONT09/20/2019
DOB NOWConstruction FenceSigned-offALL STATE 12 GENERAL CONT09/04/2019
DOB NOWConstruction FenceSigned-offALL STATE 12 GENERAL CONT12/12/2018
BIS—ISSUEDALL STATE 12 GENERAL CONTRACTING08/24/2020
BISSPISSUEDCHINATOWN P&H INC08/21/2020
BISPLISSUEDCHINATOWN PLBG & HTG INC07/14/2020
BIS—ISSUEDALL STATE 12 GENERAL CONTRACTING09/23/2019
BIS—ISSUEDALL STATE 12 GENERAL CONTRACTING09/23/2019
BIS—ISSUEDALL STATE 12 GENERAL CONTRACTING12/13/2018
3 projects · most recent 10/27/2020
General Wiring
FiledStatusContractorScope
10/27/2020CompleteELPO ELECTRICAL CONTG INCGeneral Wiring
07/03/2020CompleteAL-LECTRIC ELECT'L CONTRGGeneral Wiring
10/28/2019CompleteRICHARD NEU—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
06/23/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/12/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/12/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/18/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/18/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
10/17/2023HVAC-R and service water heating system controlsXiao Huangenergy_progress
10/17/2023Mechanical SystemsXiao Huangspecial
10/17/2023Fire-Resistance Rated ConstructionXiao Huangprogress
10/17/2023FinalYUNHO LEEprogress
10/17/2023HVAC-R and service water piping design and insulationXiao Huangenergy_progress
10/17/2023HVAC-R and service water heating equipmentXiao Huangenergy_progress
10/03/2023Mechanical SystemsXiao Huangspecial
10/03/2023HVAC-R and service water heating system controlsXiao Huangenergy_progress
10/03/2023HVAC-R and service water heating equipmentXiao Huangenergy_progress
10/03/2023HVAC-R and service water piping design and insulationXiao Huangenergy_progress
10/03/2023FinalYUNHO LEEprogress
10/03/2023Fire-Resistance Rated ConstructionXiao Huangprogress
11/15/2019FinalHARI SONIprogress
10/28/2019FinalBRIAN T. O'CONNORprogress
12/11/2018FinalROBERT LINprogress
12/11/2018PreliminaryROBERT LINprogress
▾Documents — 147 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch4
08/24/2026Q08012001-P2Request digital key ↗
08/15/2026Q08012001-I1Request digital key ↗
08/15/2026Q08012001-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Structural2
08/28/2026Q00256390-I1Request digital key ↗
08/15/2026Q00256390-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/28/2026Q00109159-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/28/2026Q00254368-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/27/2026Q00164209-I1Request digital key ↗
▸Applications & Permits23
▸BISPLAN / WORK APPROVAL APPLICATION13
09/30/2021421676421Open ↗
03/30/2021421895113Open ↗
02/01/2021421676421Open ↗
Showing 3 of 13 on file for this type
▸BISWORK PERMIT APPLICATION6
08/21/2020421896844Open ↗
07/14/2020421676421Open ↗
09/24/2019421676421Open ↗
Showing 3 of 6 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
12/17/2020421895113Open ↗
09/23/2020421895113Open ↗
▸BISBPP - Street Opening DOT Permit - BPP - Street Opening1
12/17/2020421895113Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
08/21/2020421676421Open ↗
▸Zoning, Tax Lot & Property Records5
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
09/10/2019421676421Open ↗
▸BISVERIFY TAX LOT1
07/22/2021421676421Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
03/20/2019421676421Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
07/23/2021421676421Open ↗
▸BISZONING DIAGRAM1
06/10/2019421676421Open ↗
▸Seals & Professional Certifications26
▸DOB NOWProgress Inspector Seal & Signature10
09/01/2026Q08012001-I1Open ↗
09/01/2026Q08012001-I1Open ↗
09/01/2026Q08012001-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/28/2026Q00109159-I1Open ↗
08/28/2026Q00254368-I1Open ↗
08/28/2026Q00256390-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
09/17/2019421676421Open ↗
03/20/2019421676421Open ↗
03/20/2019421676421Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026Q08012001-I1Open ↗
08/25/2026Q08012001-P2Open ↗
▸Trade Schedules & Equipment10
▸BISSCHEDULE B - PLUMBING4
12/09/2020421676421Open ↗
09/17/2020421676421Open ↗
09/09/2020421896844Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
03/20/2019421676421Open ↗
03/01/2019421896844Open ↗
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0211
12/22/2018421624086Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
09/10/2019421896844Open ↗
▸BISGAS CUT-OFF1
12/22/2018421624086Open ↗
▸BISELECTRIC CUT-OFF1
12/22/2018421624086Open ↗
▸Safety & Tenant Protection11
▸BISSTREET TREE CHECKLIST3
03/25/2021421895113Open ↗
05/20/2019421895113Open ↗
03/20/2019421676421Open ↗
▸BISSTREET TREE SUPPORTING DOCUMENT2
03/25/2021421895113Open ↗
03/25/2021421895113Open ↗
▸BISANTI-HARASSMENT CHECKLIST1
12/22/2018421624086Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
12/22/2018421624086Open ↗
▸BISSTREET TREES SITE PLAN1
03/25/2021421895113Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
12/22/2018421624086Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
12/22/2018421624086Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026Q00164209-I1Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/22/2018421624086Open ↗
▸BISRODENT CONTROL1
12/22/2018421624086Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
09/17/2019421676421Open ↗
06/10/2019421676421Open ↗
11/07/2018421676421Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
12/04/2020421676421Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/22/2021421676421Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY5
12/23/2020421896844Open ↗
12/04/2020421676421Open ↗
12/04/2020421676421Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
01/22/2021421676421Open ↗
09/17/2019421676421Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
12/04/2020421676421Open ↗
▸BISHYDRO FLOW TEST LETTER1
03/01/2019421896844Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
03/20/2019421676421Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
09/17/2019421676421Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
09/10/2019421896844Open ↗
▸Approvals, Objections & Sign-offs11
▸BISLETTERS - SUPPORTING DOCUMENTATION5
09/19/2019421676421Open ↗
09/10/2019421896844Open ↗
09/10/2019421896844Open ↗
Showing 3 of 5 on file for this type
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
03/25/2021421895113Open ↗
12/17/2020421895113Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
12/22/2018421624086Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
06/07/2019421676421Open ↗
▸BISLANDMARKS APPROVAL1
12/22/2018421624086Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
02/04/2021421896844Open ↗
▸Cost, Insurance & Ownership7
▸BISPROJECT-SPECIFIC GL INSURANCE3
03/16/2021421676421Open ↗
09/19/2019421676421Open ↗
12/22/2018421624086Open ↗
▸BISCOST AFFIDAVIT1
03/01/2019421896844Open ↗
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
12/17/2020421895113Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
02/04/2021421896844Open ↗
▸BISDEPT OF FINANCE VERIFICATION1
03/20/2019421676421Open ↗
▸Filing & Intake Forms15
▸BISADDITIONAL INFORMATION10
10/21/2021421676421Open ↗
07/22/2021421676421Open ↗
04/01/2021421895113Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING COVER SHEET5
03/20/2019421676421Open ↗
03/19/2019421895113Open ↗
03/01/2019421896844Open ↗
Showing 3 of 5 on file for this type
▸Other Documents11
▸BISBPP - SUPPORTING DOCUMENTATION6
12/17/2020421895113Open ↗
12/17/2020421895113Open ↗
12/17/2020421895113Open ↗
Showing 3 of 6 on file for this type
▸BISPLOT DIAGRAM2
07/23/2021421676421Open ↗
03/20/2019421676421Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
12/17/2020421895113Open ↗
▸BISUnknown1
06/14/2019421676421Open ↗
▸BISSP/SD DEVICE CERT : LTR-LIC ELECT1
02/04/2021421896844Open ↗