3 Open Violations 1 unresolved · 2 paperwork only▸
HPD01/16/2001SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR WALLS AND CEILING THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY
ECB09/16/2025AT TIME OF INSPECTION OBSERVED REAR CMU WALL IN STATE OF DISREPAIR WITH CRACKS AND BULGES AT MULTIPLE LOCATIONS AND IN DANGER OF POTENTIAL FURTHER COLLAPSE AT EXP.3 (REAR OF BUILDING)., REPAIR AND/REPLACENothing owed — awaiting certificate of correction
ECB05/02/2019AT TIME OF INSPECTION IN BOILER ROOM I OBSERVED ILLEGAL GAS FLEX FROM HOT WATER HEATER TO BOILER. GAS METER VALVE WAS LOCKED BY UTILITY BEFORE INSPECTION , REPAIR AND/OR REPLACENothing owed — awaiting certificate of correction
Two family brick · 2,480 sf lot · 0.66 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.