← Back
BuildNYC
Condo, residential unit in elevator building
Malibu Condominium
51-33 GOLDSMITH STREET · Elmhurst · BIN 4057301
💬 Discuss this project
1962Year Built
6Stories
R4Building Class
R6BZoning
35,567 sfGross Floor Area
62Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: SAFE
Condo, residential unit in elevator building · 13,000 sf lot · 2.74 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofMalibu Condominium Corp.Under Construction7p · 3 filings · 13 docs
Floor 1Malibu Condominium Corp.Under Construction5p · 2 filings · 7 docs
Site & exteriorMalibu Condominium Corp.Under Construction18p · 4 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Malibu Condominium1203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Always Fast Services208/05/2026
Cataldo Properties106/25/2026
SRL Associates104/28/2023
Syed Engineering109/28/2021
WRG Engineering107/26/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC Department of Design and Construction203/21/2026
Expediting103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Park Contracting GroupScaffold310/30/2026
Bellet Construction CoGeneral Contractor207/08/2026
BRW ContractingGeneral Contractor109/07/2026
JascoScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Cataldo Engineering2174106/25/2026
AA Building & Inspection1519104/28/2023
Frame Design and Construction7971104/28/2023
WRG Engineering4403107/26/2021
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 9, sub-cycle A)
The filing window opened 02/21/2025. No Cycle 9 filing on record yet
10/29/2026
Permit renewed — Sidewalk Shed
Renewed without changes
Q01440458-I1-SH
09/03/2026
Permit issued — General Construction
Q01421494-I1-GC
08/05/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Q01440458-I1
08/05/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q01440459-I1
132 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedPark Contracting Group10/29/2026
DOB NOWGeneral ConstructionPermit IssuedBRW Contracting09/03/2026
DOB NOWSidewalk ShedPermit IssuedPark Contracting Group08/05/2026
DOB NOWSupported ScaffoldPermit IssuedPark Contracting Group08/05/2026
DOB NOWGeneral ConstructionSigned-offBellet Construction Co07/06/2023
DOB NOWSidewalk ShedSigned-offJasco09/29/2021
DOB NOWGeneral ConstructionSigned-offBellet Construction Co08/24/2021
BISFSISSUEDStar Industrial Service10/11/2017
BISOTISSUEDLaundro Combustion03/02/2017
BISOTISSUEDJack Piccinni01/21/2016
BISFSISSUEDApproved Oil Co of Brooklyn11/12/2014
BISPLISSUEDJoseph Ferrigno P&H Co11/12/2014
BISOTISSUEDBellet Construction Co06/15/2011
BISEQISSUEDP.J.B. Contracting05/06/2011
BISBLISSUEDAbilene03/15/2005
2 projects · most recent 08/05/2026
FiledStatusContractorScope
08/05/2026Permit IssuedRichard Neu—
09/29/2021Permit IssuedRichard Neu—
2 projects · most recent 08/05/2026
Sidewalk Shed Scaffold
FiledStatusContractorScope
08/05/2026Permit IssuedPark Contracting GroupSidewalk Shed
08/05/2026Permit IssuedPark Contracting GroupScaffold
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
06/24/2026FinalThomas Cataldoprogress
06/24/2026Tenant Protection Plan ComplianceThomas Cataldospecial
05/26/2023Structural Stability – Alterations of existing buildingsSURESH WARRENspecial
04/12/2023Tenant Protection Plan ComplianceYounes Abouyaalaspecial
04/11/2023FinalSean Lenahanprogress
09/23/2021FinalRAFI HAMIDprogress
07/21/2021Insulation placement and R valuesWinston Garciaenergy_progress
07/21/2021FinalWinston Garciaprogress
07/19/2021Fire-Resistant Penetrations and JointsWinston Garciaspecial
07/19/2021MasonryWinston Garciaspecial
103 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account