← Back
Three families
51-53 69 PLACE
QUEENS · Maspeth · BIN 4623289
💬 Discuss this project
2022Year Built
3Stories
C0Building Class
R4Zoning
3,034 sfGross Floor Area
3Units
Three families · 2,650 sf lot · 1.14 FAR built · Flood zone X
Locations of Work
StructuralMechanical
Roof2p · 2 filings · 17 docs
Cellar2p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GLOBAL GROUP NY4207/08/2026
POLAR CONTRACTING607/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/03/2019$1.1M—— → —— not available
11/20/2017$929K—Private party → PA PACKAGE ASSOCIATES LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAYSIDE ENGINEERING PC808/15/2025
ARC CONSULTING ENGINEERS106/30/2025
JUNG Y. SHIN LLC512/09/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
POLAR CONTRACTING1203/21/2026
BERNARDO GAMBA603/21/2026
CNY ENGINEERING PC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
POLAR CONTRACTING INCGeneral Contractor1007/08/2026
EXPERTDESIGNERS,DESIGNGeneral Contractor907/08/2026
XH&RC PLBG AND HTG INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARC CONSULTING ENGINEERS,4083708/15/2025
PROMISE CONSULTANTS1412210/27/2020
Building Lifecycle
All (90)Filed (14)Permit Issued (15)Signed Off (7)Inspection (5)Objection (19)Special Inspection (30)
10/16/2025
Signed off — Alteration
NEW METAL JOIST STRUCTURE AND 8" CONCRETE MASONRY UNITS. STRUCTURAL WORK IN-CONJUNCTION WITH JOB # 421767074
Q00386570-I1
10/16/2025
Signed off — Alteration
APPLICATION FILE TO PROPOSE PLUMBING WORK IN-CONJUNCTION WITH JOB # 421767074
Q00386557-I1
10/14/2025
Signed off — Alteration
INSTALL NEW BOILER AND HOT WATER HEATER SYSTEM FOR THE BUILDING NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q01240816-I1
09/22/2025
Signed off — Alteration
Q00388673-I1
08/15/2025
Filed — Alteration
APPLICATION FILE TO PROPOSE PLUMBING WORK IN-CONJUNCTION WITH JOB # 421767074
Q00386557-P3
08/14/2025
Special inspection requirement — HVAC and service water heating system controls
JAN PEREZ
08/14/2025
Special inspection requirement — HVAC and service water heating equipment
JAN PEREZ
08/14/2025
Special inspection requirement — Energy Code Compliance Inspections
JAN PEREZ
08/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAN PEREZ
08/06/2025
Signed off — Alteration
CURB CUT
Q00386574-I1
08/05/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
08/04/2025
Permit issued — Mechanical Systems
Q01240816-I1-MS
07/29/2025
Objection resolved — Addressed
07/29/2025
Objection resolved — Addressed
07/29/2025
Objection resolved — Addressed
07/24/2025
Objection raised — Scope
07/24/2025
Objection raised — Cost
07/24/2025
Objection raised — Inspections
07/13/2025
Signed off — Alteration
EIGHT FEET HEIGHT CONSTRUCTION FENCE ALIGNED WITH PROPERTY LINE
Q00388654-I1
06/30/2025
Filed — Alteration
INSTALL NEW BOILER AND HOT WATER HEATER SYSTEM FOR THE BUILDING NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q01240816-I1
06/30/2025
Special inspection requirement — HVAC-R and service water heating system controls
JAN PEREZ
06/30/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JAN PEREZ
06/30/2025
Special inspection requirement — Maintenance information
JAN PEREZ
06/30/2025
Special inspection requirement — HVAC-R and service water heating equipment
JAN PEREZ
06/12/2025
Special inspection requirement — Final
JAN PEREZ
06/12/2025
Special inspection requirement — Fire-Resistance Rated Construction
JAN PEREZ
06/12/2025
Special inspection requirement — Energy Code Compliance Inspections
JAN PEREZ
06/12/2025
Special inspection requirement — Mechanical Systems
JAN PEREZ
06/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAN PEREZ
05/21/2025
Permit issued — Curb Cut
Q00386574-I1-CC
12/03/2024
Permit issued — Plumbing
Q00386557-I1-PL
11/18/2024
Permit issued — Construction Fence
Q00388654-I1-FN
11/10/2023
Filed — Alteration
APPLICATION FILE TO PROPOSE PLUMBING WORK IN-CONJUNCTION WITH JOB # 421767074
Q00386557-P2
11/08/2023
Permit issued — Structural
Q00386570-I1-ST
08/23/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/23/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/23/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/04/2023
Filed — Alteration
APPLICATION FILE TO PROPOSE PLUMBING WORK IN-CONJUNCTION WITH JOB # 421767074
Q00386557-P1
07/26/2023
Special inspection requirement — Structural Steel - Details
JAN PEREZ
07/26/2023
Special inspection requirement — Masonry
JAN PEREZ
07/26/2023
Special inspection requirement — Structural Cold-Formed Steel
JAN PEREZ
07/26/2023
Special inspection requirement — Final
JAN PEREZ
07/20/2023
Filed — Alteration
NEW METAL JOIST STRUCTURE AND 8" CONCRETE MASONRY UNITS. STRUCTURAL WORK IN-CONJUNCTION WITH JOB # 421767074
Q00386570-P1
07/18/2023
Special inspection requirement — Final
JAN PEREZ
07/18/2023
Special inspection requirement — Structural Steel - Details
JAN PEREZ
07/18/2023
Special inspection requirement — Structural Cold-Formed Steel
JAN PEREZ
07/18/2023
Special inspection requirement — Masonry
JAN PEREZ
06/23/2023
Permit issued — Construction Fence
Q00388654-I1-FN
11/29/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/22/2022
Permit issued — Plumbing
Q00386557-I1-PL
10/06/2022
Permit issued — Structural
Q00386570-I1-ST
10/05/2022
Permit issued — Structural
Q00282201-I1-ST
06/23/2022
Objection raised — Energy
06/23/2022
Objection raised — Inspections
06/23/2022
Objection raised — Zoning
06/23/2022
Objection raised — Scope
06/23/2022
Objection raised — Structural
06/15/2022
Filed — New Building
NEW CAR GARAGE
Q00603202-I1
05/10/2022
Permit issued — Construction Fence
Q00388654-I1-FN
12/29/2021
Permit issued — Construction Fence
Q00388673-I1-FN
Latest 60 of 90 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offPOLAR CONTRACTING INC08/04/2025
DOB NOWCurb CutSigned-offPOLAR CONTRACTING INC05/21/2025
DOB NOWPlumbingSigned-offXH&RC PLBG AND HTG INC12/03/2024
DOB NOWConstruction FenceSigned-offPOLAR CONTRACTING INC11/18/2024
DOB NOWStructuralSigned-offPOLAR CONTRACTING INC11/08/2023
DOB NOWConstruction FenceSigned-offPOLAR CONTRACTING INC06/23/2023
DOB NOWPlumbingSigned-offXH&RC PLBG AND HTG INC10/22/2022
DOB NOWStructuralSigned-offPOLAR CONTRACTING INC10/06/2022
DOB NOWStructuralSigned-offPOLAR CONTRACTING INC10/05/2022
DOB NOWConstruction FenceSigned-offPOLAR CONTRACTING INC05/10/2022
DOB NOWConstruction FenceSigned-offEXPERTDESIGNERS,DESIGN12/29/2021
DOB NOWConstruction FenceSigned-offEXPERTDESIGNERS,DESIGN12/09/2021
DOB NOWConstruction FenceSigned-offEXPERTDESIGNERS,DESIGN09/17/2021
DOB NOWConstruction FenceSigned-offEXPERTDESIGNERS,DESIGN07/19/2021
DOB NOWConstruction FenceSigned-offEXPERTDESIGNERS,DESIGN11/23/2020
BIS—ISSUEDPOLAR CONTRACTING INC11/18/2024
BIS—ISSUEDPOLAR CONTRACTING INC12/26/2023
BIS—ISSUEDPOLAR CONTRACTING INC11/03/2023
BIS—ISSUEDPOLAR CONTRACTING INC12/19/2022
BIS—ISSUEDPOLAR CONTRACTING INC05/18/2022
BIS—ISSUEDPOLAR CONTRACTING INC05/18/2022
BIS—ISSUEDEXPERTDESIGNERS,DESIGN04/14/2022
BIS—ISSUEDEXPERTDESIGNERS,DESIGN04/14/2022
BIS—ISSUEDEXPERTDESIGNERS,DESIGN07/29/2021
BIS—ISSUEDEXPERTDESIGNERS,DESIGN07/28/2021
1 project · most recent 10/27/2020
Heating Systems
FiledStatusContractorScope
10/27/2020——Heating Systems
1 project · most recent 10/17/2022
General Wiring
FiledStatusContractorScope
10/17/2022CompleteKJK ELECTRIC INCGeneral Wiring
1 project · most recent 06/15/2022
FiledStatusContractorScope
06/15/2022——1 scope_items
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
08/05/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
08/23/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/23/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/23/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/29/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
08/14/2025HVAC and service water heating system controls JAN PEREZenergy_progress
08/14/2025HVAC and service water heating equipment JAN PEREZenergy_progress
08/14/2025Energy Code Compliance InspectionsJAN PEREZprogress
08/14/2025Fire-Resistant Penetrations and JointsJAN PEREZspecial
06/30/2025HVAC-R and service water heating system controlsJAN PEREZenergy_progress
06/30/2025HVAC-R and service water piping design and insulationJAN PEREZenergy_progress
06/30/2025Maintenance informationJAN PEREZenergy_progress
06/30/2025HVAC-R and service water heating equipmentJAN PEREZenergy_progress
06/12/2025FinalJAN PEREZprogress
06/12/2025Fire-Resistance Rated ConstructionJAN PEREZprogress
06/12/2025Energy Code Compliance InspectionsJAN PEREZprogress
06/12/2025Mechanical SystemsJAN PEREZspecial
06/12/2025Fire-Resistant Penetrations and JointsJAN PEREZspecial
07/26/2023Structural Steel - DetailsJAN PEREZspecial
07/26/2023MasonryJAN PEREZspecial
07/26/2023Structural Cold-Formed SteelJAN PEREZspecial
07/26/2023FinalJAN PEREZprogress
07/18/2023FinalJAN PEREZprogress
07/18/2023Structural Steel - DetailsJAN PEREZspecial
07/18/2023Structural Cold-Formed SteelJAN PEREZspecial
07/18/2023MasonryJAN PEREZspecial
09/29/2021Concrete - Cast-In-Place—special
09/29/2021Footing and Foundation—progress
09/29/2021Final—progress
09/29/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
Latest 25 of 31.
▾Documents — 199 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch - Plumbing4
08/24/2026Q00386557-P1Request digital key ↗
08/24/2026Q00386557-P3Request digital key ↗
08/24/2026Q00386557-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Structural2
08/24/2026Q00386570-I1Request digital key ↗
08/24/2026Q00386570-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/27/2026Q00282195-I1Request digital key ↗
08/14/2026Q00386564-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence2
08/28/2026Q00388673-I1Request digital key ↗
08/28/2026Q00388654-I1Request digital key ↗
▸DOB NOWPlans/Sketch2
08/19/2026Q01240816-I1Request digital key ↗
08/15/2026Q00603202-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/14/2026Q00386574-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/27/2026Q00438182-I1Request digital key ↗
▸Applications & Permits27
▸BISPLAN / WORK APPROVAL APPLICATION17
02/27/2026421767074Open ↗
11/07/2025421767074Open ↗
07/17/2025440820499Open ↗
Showing 3 of 17 on file for this type
▸BISWORK PERMIT APPLICATION6
07/20/2022421767074Open ↗
07/20/2022421767074Open ↗
07/20/2022421767074Open ↗
Showing 3 of 6 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
05/27/2025440820499Open ↗
01/17/2025440820499Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
09/15/2025421767074Open ↗
09/12/2025421767074Open ↗
▸Zoning, Tax Lot & Property Records6
▸BISZONING DIAGRAM2
05/24/2023421767074Open ↗
05/11/2021421767074Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
07/08/2020421767074Open ↗
▸BISVERIFY TAX LOT1
10/15/2025421767074Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
05/23/2025421767074Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q00603202-I1Open ↗
▸Seals & Professional Certifications34
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/28/2026Q00388673-I1Open ↗
08/28/2026Q00388654-I1Open ↗
08/27/2026Q00282195-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/23/2026Q01240816-I1Open ↗
09/23/2026Q01240816-I1Open ↗
09/23/2026Q01240816-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026Q01240816-I1Open ↗
09/23/2026Q01240816-I1Open ↗
09/01/2026Q00386557-P3Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
08/12/2021421767074Open ↗
07/13/2021421767074Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
01/17/2025440820499Open ↗
▸Trade Schedules & Equipment7
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)2
05/23/2025421767074Open ↗
07/08/2020421767074Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
10/14/2025421767074Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
10/14/2025421767074Open ↗
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
05/07/2021421767074Open ↗
▸BISSPRINKLER SYSTEMS1
10/14/2025421767074Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026Q00603202-I1Open ↗
▸Safety & Tenant Protection13
▸BISSTREET TREE CHECKLIST4
05/27/2025440820499Open ↗
01/17/2025440820499Open ↗
05/07/2021421767074Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREES SITE PLAN2
06/02/2025421767074Open ↗
01/17/2025440820499Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN2
05/27/2025440820499Open ↗
07/13/2021421767074Open ↗
▸BISSTREET TREE SIGNOFF2
10/15/2025421767074Open ↗
08/26/2025440820499Open ↗
▸BISSTREET TREE SUPPORTING DOCUMENT1
01/17/2025440820499Open ↗
▸BISBPP: STREET TREES SITE PLAN1
05/27/2025440820499Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026Q00603202-I1Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
11/23/2021421767074Open ↗
07/08/2020421767074Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
10/14/2025421767074Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
06/02/2025421767074Open ↗
▸BISINTERIOR LIGHTING POWER1
10/14/2025421767074Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
10/14/2025421767074Open ↗
▸BISFENESTRATION AREAS1
10/14/2025421767074Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
10/14/2025421767074Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
10/14/2025421767074Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
10/14/2025421767074Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
10/15/2025421767074Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
07/13/2021421767074Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00386557-I1Open ↗
▸Inspections & Test Reports17
▸BISTECHNICAL REPORT: RESPONSIBILITY7
06/02/2025421767074Open ↗
06/02/2025421767074Open ↗
06/02/2025421767074Open ↗
Showing 3 of 7 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
10/14/2025421767074Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
10/14/2025421767074Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
10/14/2025421767074Open ↗
▸BISMASONRY1
10/14/2025421767074Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
10/14/2025421767074Open ↗
▸BISSOIL REPORT1
07/08/2020421767074Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
09/13/2021421767074Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
07/08/2020421767074Open ↗
▸BISMECHANICAL SYSTEMS1
10/14/2025421767074Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
09/13/2021421767074Open ↗
▸Approvals, Objections & Sign-offs16
▸BISLETTERS - SUPPORTING DOCUMENTATION9
01/17/2025440820499Open ↗
05/24/2023421767074Open ↗
04/24/2023421767074Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE6
02/27/2026421767074Open ↗
04/18/2023421767074Open ↗
03/31/2023421767074Open ↗
Showing 3 of 6 on file for this type
▸BISCONSTRUCTION (OT) SIGNOFF1
08/26/2025440820499Open ↗
▸Cost, Insurance & Ownership3
▸BISPROJECT-SPECIFIC GL INSURANCE3
07/20/2022421767074Open ↗
09/13/2021421767074Open ↗
09/10/2021421767074Open ↗
▸Filing & Intake Forms22
▸BISADDITIONAL INFORMATION16
11/05/2025421767074Open ↗
07/29/2025440820499Open ↗
06/02/2025421767074Open ↗
Showing 3 of 16 on file for this type
▸BISBOROUGH INTAKE FORM4
09/13/2021421767074Open ↗
09/10/2021421767074Open ↗
09/10/2021421767074Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET1
06/11/2020421767074Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
01/17/2025440820499Open ↗
▸Other Documents17
▸DOB NOWWaiver Document6
08/13/2026Q00386557-I1Open ↗
08/13/2026Q00386557-P2Open ↗
08/13/2026Q00386557-P1Open ↗
Showing 3 of 6 on file for this type
▸BISPLOT DIAGRAM2
05/04/2021421767074Open ↗
07/08/2020421767074Open ↗
▸BISBPP-PARKS: PLANT NEW TREE1
05/27/2025440820499Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
04/02/2021421767074Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
05/27/2025440820499Open ↗
▸BISSTRUCTURAL COLD-FORMED STEEL1
10/14/2025421767074Open ↗
▸BISMAINTENANCE INFORMATION1
10/14/2025421767074Open ↗
▸BISPERMANENT CERTIFICATE1
10/14/2025421767074Open ↗
▸BISBPP: GRADE STUDY1
05/27/2025440820499Open ↗
▸BISFEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34)1
10/27/2025421767074Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q00603202-I1Open ↗