← Back
BuildNYC
One story - permanent living quarter
51-67 GORSLINE STREET
QUEENS · Elmhurst · BIN 4057087
💬 Discuss this project
1940Year Built
1Stories
A2Building Class
R4BZoning
918 sfGross Floor Area
1Units
One story - permanent living quarter · 2,142 sf lot · 0.43 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofProject and vertical extension to existingUnder Construction1p · 1 filing · 20 docs
Floor 2Project and vertical extension to existingUnder Construction7p · 1 filing · 20 docs
Floor 1Installation of Heavy Duty Sidewalk ShedUnder Construction13p · 2 filings · 20 docs
CellarProject and vertical extension to existingUnder Construction8p · 1 filing · 20 docs
Site & exteriorProject and vertical extension to existingUnder Construction15p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
McHenery Testing Lab107/22/2026
Agt Architecture107/10/2026
Fang Architect306/19/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
L&L Construction DevelopmentGeneral Contractor306/28/2026
JascoScaffold210/16/2026
L&L Construction DevelopmentScaffold106/28/2026
Tri State Plumbing & HeatingPlumbing107/15/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Fang Architect5513307/10/2026
Triangle Inspection & Tes7495107/10/2026
Building Lifecycle
10/15/2026
Permit renewed — Sidewalk Shed
Renewed without changes
Q01434218-I1-SH
07/22/2026
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q01434218-I1
07/22/2026
Permit issued — Sidewalk Shed
Q01434218-I1-SH
07/14/2026
Permit issued — Plumbing
Q01327991-S2-PL
07/10/2026
Filed — Alteration CO
CONVERT 1-FAMILY TO 2-FAMILY HOUSE, HORIZONTAL AND VERTICAL EXTENSION TO EXISTING BUILDING. TO OBTAIN NEW C OF O.
Q01327991-S2
50 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedJasco10/15/2026
DOB NOWSidewalk ShedPermit IssuedJasco07/22/2026
DOB NOWPlumbingPermit IssuedTri State Plumbing & Heating07/14/2026
DOB NOWFoundationPermit IssuedL&L Construction Development06/22/2026
DOB NOWEarth WorkPermit IssuedL&L Construction Development06/22/2026
DOB NOWConstruction FencePermit IssuedL&L Construction Development06/22/2026
DOB NOWFoundationPermit IssuedL&L Construction Development06/22/2026
1 project · most recent 07/10/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/10/2026Permit IssuedTri State Plumbing & HeatingGas, Storm, Water/Sanitary
2 projects · most recent 07/21/2026
General Wiring
FiledStatusContractorScope
07/21/2026Permit IssuedRichard Neu—
07/09/2026Permit IssuedKwong Ming ElectricGeneral Wiring
1 project · most recent 07/10/2026
Steel Masonry Wood
FiledStatusContractorScope
07/10/2026Permit IssuedTri State Plumbing & HeatingSteel, Masonry, Wood
2 projects · most recent 07/22/2026
Sidewalk Shed Fence
FiledStatusContractorScope
07/22/2026Permit IssuedJascoSidewalk Shed
07/10/2026Permit IssuedTri State Plumbing & HeatingFence
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
07/09/2026Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
07/09/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationDEZHANG FANGspecial
07/09/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
07/09/2026Energy Code Compliance InspectionsDEZHANG FANGprogress
07/09/2026HVAC-R and service water heating equipmentDEZHANG FANGenergy_progress
07/09/2026HVAC-R and service water piping design and insulationDEZHANG FANGenergy_progress
07/09/2026HVAC-R and service water heating system controlsDEZHANG FANGenergy_progress
07/09/2026Maintenance informationDEZHANG FANGenergy_progress
06/19/2026Fire-Resistance Rated ConstructionDEZHANG FANGprogress
06/19/2026Footing and FoundationDEZHANG FANGprogress
06/19/2026Structural Wood FrameDEZHANG FANGprogress
06/19/2026Insulation placement and R valuesDEZHANG FANGenergy_progress
06/19/2026Air barrier - visual inspectionDEZHANG FANGenergy_progress
06/19/2026Maintenance informationDEZHANG FANGenergy_progress
06/19/2026Electric vehicle service equipment requirementsDEZHANG FANGenergy_progress
06/19/2026Concrete - Cast-In-PlaceDEZHANG FANGspecial
06/19/2026Interior lighting powerDEZHANG FANGenergy_progress
06/19/2026MeteringDEZHANG FANGenergy_progress
06/19/2026Permanent certificateDEZHANG FANGenergy_progress
06/19/2026Fenestration areasDEZHANG FANGenergy_progress
06/19/2026Fenestration and door U-factor and product ratingsDEZHANG FANGenergy_progress
06/19/2026Protection of exposed foundation insulationDEZHANG FANGenergy_progress
06/19/2026Fenestration air leakageDEZHANG FANGenergy_progress
06/19/2026Excavations - Sheeting, Shoring, and BracingDEZHANG FANGspecial
06/19/2026Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
Latest 25 of 30.
36 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account