← Back
Walk-up apt, over six families with stores
51 CARMINE STREET
MANHATTAN · BIN 1084945
💬 Discuss this project
1900Year Built
3Stories
C7Building Class
R6Zoning
9,450 sfGross Floor Area
14Units
Rent Stabilized3 Open Violations 2 unresolved · 1 paperwork only ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: CARMINE LIMITED · 5,250 sf lot · 1.8 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalPlumbingCivil
Roof3p · 1 filing · 20 docs
Floor 14p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HARBOR GARDENS ASSOCIATES804/09/2026
CARMINE203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LAM & LAM DESIGNS DPC307/22/2025
FLUSHING ENGINEERING SERVICE PC101/21/2022
ASHRAF CORP203/16/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MARCUS LZ1003/21/2026
K A INTERIOR DESIGN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUPER POWER CONSTRUCTIONGeneral Contractor303/21/2026
QMB PLUMBING & HEATING INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ASHRAF CORPORATION1973407/22/2025
LAM&LAM DESIGNS DPC3563109/26/2019
Building Lifecycle
All (72)Filed (6)Permit Issued (3)Signed Off (1)Violation (5)Objection (30)Special Inspection (27)
02/25/2026
Signed off — Alteration
REMOVE AND REPLACE PLUMBING FIXTURE FOR EAT AND DRINK ESTABLISHMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00227295-I1
08/14/2025
Violation issued (ECB, open)
Construction
07/22/2025
Filed — Alteration
REMOVE AND REPLACE PLUMBING FIXTURE FOR EAT AND DRINK ESTABLISHMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00227295-P2
07/22/2025
Special inspection requirement — Energy Code Compliance Inspections
Jay Kavi
07/22/2025
Special inspection requirement — Fire-Resistance Rated Construction
Jay Kavi
07/22/2025
Special inspection requirement — Maintenance information
AKM HOQUE
07/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Benjamin Lam
07/22/2025
Special inspection requirement — Fire-Resistance Rated Construction
Benjamin Lam
07/22/2025
Special inspection requirement — Energy Code Compliance Inspections
Benjamin Lam
07/22/2025
Special inspection requirement — Maintenance information
Benjamin Lam
07/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
AKM HOQUE
06/20/2025
Permit issued — Plumbing
M00227295-I1-PL
01/28/2022
Objection raised — Fire_Protection
01/28/2022
Objection resolved — Addressed
01/28/2022
Objection raised — Mechanical
01/28/2022
Objection resolved — Addressed
01/28/2022
Objection raised — Structural
01/28/2022
Objection resolved — Addressed
01/28/2022
Objection raised — Inspections
01/28/2022
Objection resolved — Addressed
01/28/2022
Objection raised — Mechanical
01/28/2022
Objection resolved — Addressed
01/28/2022
Objection raised — Fire_Protection
01/28/2022
Objection resolved — Addressed
01/28/2022
Objection raised — Fire_Protection
01/28/2022
Objection resolved — Addressed
01/28/2022
Objection raised — Structural
01/28/2022
Objection resolved — Addressed
01/28/2022
Objection raised — Structural
01/28/2022
Objection resolved — Addressed
01/28/2022
Objection raised — Mechanical
01/28/2022
Objection resolved — Addressed
01/28/2022
Objection raised — Other
01/28/2022
Objection resolved — Addressed
01/28/2022
Objection raised — Scope
01/28/2022
Objection resolved — Addressed
01/28/2022
Objection raised — Mechanical
01/28/2022
Objection resolved — Addressed
01/28/2022
Objection raised — Mechanical
01/28/2022
Objection resolved — Addressed
01/28/2022
Objection raised — Mechanical
01/28/2022
Objection resolved — Addressed
01/21/2022
Filed — No Work
M00664126-I1
01/17/2022
Special inspection requirement — Public Assembly Emergency Lighting
KY FU
04/16/2021
Violation issued (HPD, closed)
I
04/16/2021
Violation issued (HPD, closed)
A
03/17/2020
Special inspection requirement — HVAC and service water heating system controls
AKM HOQUE
03/17/2020
Special inspection requirement — HVAC and service water heating equipment
AKM HOQUE
03/17/2020
Special inspection requirement — Mechanical Systems
AKM HOQUE
03/17/2020
Special inspection requirement — Final
Jay Kavi
03/17/2020
Special inspection requirement — HVAC insulation and sealing
AKM HOQUE
03/17/2020
Special inspection requirement — Maintenance information
AKM HOQUE
03/17/2020
Special inspection requirement — Duct leakage testing
AKM HOQUE
03/16/2020
Filed — Alteration
REPLACE RANGE HOOD, RELOCATE EXHAUST SYSTEM AND INSTALL NEW HVAC SYSTEM. NO CHANGE IN USE,EGRESS OR OCCUPANCY
M00232969-P1
03/16/2020
Filed — Alteration
REMOVE AND REPLACE PLUMBING FIXTURE FOR EAT AND DRINK ESTABLISHMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00227295-P1
03/02/2020
Special inspection requirement — Fire-Resistance Rated Construction
Jay Kavi
03/02/2020
Special inspection requirement — Final
Jay Kavi
03/02/2020
Special inspection requirement — Duct leakage testing
AKM HOQUE
03/02/2020
Special inspection requirement — HVAC and service water heating equipment
AKM HOQUE
03/02/2020
Special inspection requirement — HVAC and service water heating system controls
AKM HOQUE
Latest 60 of 72 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offQMB PLUMBING & HEATING INC06/20/2025
DOB NOWPlumbingSigned-offQMB PLUMBING & HEATING INC11/01/2019
DOB NOWMechanical SystemsPermit IssuedSUPER POWER CONSTRUCTION10/11/2019
BISOTISSUEDSUPER POWER CONSTRUCTION08/01/2019
BISFPISSUEDACTIVE FIRE CONTROL CO.12/17/2001
BIS—ISSUEDPETER CAMILLERI06/07/2000
BISMHISSUEDIDEAL KITCHEN VENTILATION INC10/07/1999
BISOTISSUEDIDEAL KITCHEN VENTILATION INC10/01/1999
BISFPISSUEDIDEAL FIRE CONTROL INC09/14/1999
BISPLISSUEDJOHN TRANI PLBG AND HTG07/01/1999
BISOTISSUEDTAOCON INC05/27/1999
BISEQISSUEDTAOCON INC05/27/1999
1 project · most recent 03/16/2020
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
03/16/2020Permit IssuedSUPER POWER CONSTRUCTIONAir Conditioning Systems, Heating Systems
Cooling
Carrier CNPHP6024ALA 2 BTU · Fan Coil Indoor ×12
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
07/22/2025Energy Code Compliance InspectionsJay Kaviprogress
07/22/2025Fire-Resistance Rated ConstructionJay Kaviprogress
07/22/2025Maintenance informationAKM HOQUEenergy_progress
07/22/2025Fire-Resistant Penetrations and JointsBenjamin Lamspecial
07/22/2025Fire-Resistance Rated ConstructionBenjamin Lamprogress
07/22/2025Energy Code Compliance InspectionsBenjamin Lamprogress
07/22/2025Maintenance informationBenjamin Lamenergy_progress
07/22/2025Fire-Resistant Penetrations and JointsAKM HOQUEspecial
01/17/2022Public Assembly Emergency LightingKY FUprogress
03/17/2020HVAC and service water heating system controls AKM HOQUEenergy_progress
03/17/2020HVAC and service water heating equipment AKM HOQUEenergy_progress
03/17/2020Mechanical SystemsAKM HOQUEspecial
03/17/2020FinalJay Kaviprogress
03/17/2020HVAC insulation and sealing AKM HOQUEenergy_progress
03/17/2020Maintenance informationAKM HOQUEenergy_progress
03/17/2020Duct leakage testing AKM HOQUEenergy_progress
03/02/2020Fire-Resistance Rated ConstructionJay Kaviprogress
03/02/2020FinalJay Kaviprogress
03/02/2020Duct leakage testing AKM HOQUEenergy_progress
03/02/2020HVAC and service water heating equipment AKM HOQUEenergy_progress
03/02/2020HVAC and service water heating system controls AKM HOQUEenergy_progress
03/02/2020HVAC insulation and sealing AKM HOQUEenergy_progress
03/02/2020Maintenance informationAKM HOQUEenergy_progress
03/02/2020Fire-Resistant Penetrations and JointsAKM HOQUEspecial
03/02/2020Energy Code Compliance InspectionsJay Kaviprogress
Latest 25 of 27.
▾Documents — 90 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch - Plumbing3
09/05/2026M00227295-P2Request digital key ↗
09/05/2026M00227295-I1Request digital key ↗
08/15/2026M00227295-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/05/2026M00232969-I1Request digital key ↗
09/05/2026M00232969-P1Request digital key ↗
08/15/2026M00232969-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
08/15/2026M00664126-I1Request digital key ↗
▸Applications & Permits9
▸BISPLAN / WORK APPROVAL APPLICATION6
08/30/2021123801298Open ↗
03/02/2020123801298Open ↗
02/14/2020123801298Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION2
08/21/2019123801298Open ↗
08/01/2019123776627Open ↗
▸BISPLACE OF ASSEMBLY1
08/16/2017123108298Open ↗
▸Seals & Professional Certifications44
▸DOB NOWProgress Inspector Seal & Signature21
09/02/2026M00664126-I1Open ↗
09/02/2026M00232969-P1Open ↗
09/02/2026M00232969-P1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/05/2026M00232969-I1Open ↗
09/05/2026M00232969-P1Open ↗
09/05/2026M00232969-P2Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
03/05/2020123776627Open ↗
08/13/2019123801298Open ↗
08/13/2019123801298Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/02/2026M00232969-P1Open ↗
08/29/2026M00227295-P2Open ↗
08/26/2026M00227295-P1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
08/13/2019123801298Open ↗
08/01/2019123776627Open ↗
01/07/2016122626131Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
08/01/2019123776627Open ↗
01/07/2016122626131Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes2
08/13/2019123801298Open ↗
08/01/2019123776627Open ↗
▸BISSTREET TREE CHECKLIST1
01/07/2016122626131Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/05/2026M00232969-I1Open ↗
09/05/2026M00232969-P1Open ↗
09/05/2026M00232969-P2Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
08/13/2019123801298Open ↗
08/01/2019123776627Open ↗
01/07/2016122626131Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
03/05/2020123776627Open ↗
08/13/2019123801298Open ↗
08/01/2019123776627Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
03/05/2020123776627Open ↗
▸Approvals, Objections & Sign-offs3
▸BISLETTERS - SUPPORTING DOCUMENTATION1
03/05/2020123776627Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/05/2020123776627Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
01/07/2016122626131Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
03/05/2020123776627Open ↗
08/13/2019123801298Open ↗
08/01/2019123776627Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET3
08/13/2019123801298Open ↗
08/01/2019123776627Open ↗
01/07/2016122626131Open ↗
▸BISBOROUGH INTAKE FORM2
03/05/2020123776627Open ↗
02/14/2020123801298Open ↗
▸Other Documents1
▸BISPLOT DIAGRAM1
01/07/2016122626131Open ↗