← Back
BuildNYC
Walk-up apt, over six families with stores
51 CHRISTOPHER STREET
MANHATTAN · West Village · BIN 1079183
💬 Discuss this project
1915Year Built
3Stories
C7Building Class
C4-5Zoning
21,100 sfGross Floor Area
31Units
Rent Stabilized6 Active Violations 5 unresolved · 1 paperwork only ▸
Walk-up apt, over six families with stores · Owner of record: Christopher & Seventh Realty · 9,565 sf lot · 2.21 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofPride Live - SNMVC16p · 1 filing · 7 docs
Floor 2Pride Live - SNMVC25p · 2 filings · 13 docs
Floor 1Pride Live - SNMVC52p · 4 filings · 20 docs
CellarPride Live - SNMVC61p · 4 filings · 20 docs
Site & exterior304-310 W. 14 Realty LLC45p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
304-310 W 14 Realty3107/08/2026
Christopher Seventh Realty403/22/2026
Morgan Holding103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/01/2015$56.5M—— → —$2,678/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EDG805/21/2026
WB Engineers & Consultants208/02/2023
Murphy Burnham & Buttrick Architects205/03/2023
Ashraf207/01/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HH Building Consulting & Architectu403/21/2026
KM Associates of New York303/21/2026
EDG403/21/2026
LMS-Ace Services203/21/2026
K & M Associates303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Cypress Green Construction CoGeneral Contractor807/08/2026
Intersystem InstallationScaffold607/08/2026
Big Apple PlumbingPlumbing507/08/2026
DC ProjectsGeneral Contractor307/08/2026
Leader Electric CoElectrical303/21/2026
MY Trade Cabinet Cospecialty_contractor303/21/2026
Twins ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EDG2578705/21/2026
WB Engineering533208/02/2023
Building Lifecycle
All (91)Filed (14)Permit Issued (13)Signed Off (7)Violation (9)Inspection (5)Objection (13)Special Inspection (30)
07/10/2026
Signed off — Alteration
PROPOSED FACADE AND TERRACE STRUCTURAL REPAIRS AS INDICATED ON PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00900853-I1
05/22/2026
Special inspection requirement — Masonry
Anthony Stasio
05/22/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anthony Stasio
05/22/2026
Special inspection requirement — Final
Anthony Stasio
05/21/2026
Filed — Alteration
PROPOSED FACADE AND TERRACE STRUCTURAL REPAIRS AS INDICATED ON PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00900853-P3
07/03/2024
Signed off — Alteration
Modification of the plumbing system to remove and install new plumbing fixtures and associated piping as shown on the drawings filed herewith. No change in use, egress, or occupancy.
M00907548-I1
07/02/2024
Signed off — Alteration
Modification of the mechanical system to remove and install new units, associated ducts, and piping as shown on the drawings filed herewith. No change in use, egress, or occupancy.
M00912757-I1
06/12/2024
Signed off — Alteration
General interior renovations in the cellar and first floor and general exterior work as shown on the drawings filed herewith. No change in use, egress, or occupancy.
M00894446-I1
06/10/2024
Filed — Alteration
General interior renovations in the cellar and first floor and general exterior work as shown on the drawings filed herewith. No change in use, egress, or occupancy.
M00894446-P3
06/10/2024
Special inspection requirement — Fire-Resistance Rated Construction
Anthony Stasio
06/10/2024
Special inspection requirement — Post-installed Anchors
Anthony Stasio
06/10/2024
Special inspection requirement — Structural Steel - Details
Anthony Stasio
06/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Anthony Stasio
06/10/2024
Special inspection requirement — Masonry
Anthony Stasio
06/10/2024
Special inspection requirement — Structural Cold-Formed Steel
Anthony Stasio
06/10/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anthony Stasio
06/10/2024
Special inspection requirement — Final
Anthony Stasio
06/04/2024
Special inspection requirement — Post-installed Anchors
Anthony Stasio
06/04/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anthony Stasio
06/04/2024
Special inspection requirement — Structural Steel - Details
Anthony Stasio
06/04/2024
Special inspection requirement — Final
Anthony Stasio
06/04/2024
Special inspection requirement — Fire-Resistance Rated Construction
Anthony Stasio
06/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Anthony Stasio
06/04/2024
Special inspection requirement — Masonry
Anthony Stasio
06/04/2024
Special inspection requirement — Structural Cold-Formed Steel
Anthony Stasio
05/14/2024
Filed — Alteration
General interior renovations in the cellar and first floor and general exterior work as shown on the drawings filed herewith. No change in use, egress, or occupancy.
M00894446-P2
05/10/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/09/2024
Special inspection requirement — Fire-Resistance Rated Construction
Anthony Stasio
05/09/2024
Special inspection requirement — Structural Cold-Formed Steel
Anthony Stasio
05/09/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anthony Stasio
05/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Anthony Stasio
05/09/2024
Special inspection requirement — Masonry
Anthony Stasio
05/09/2024
Special inspection requirement — Post-installed Anchors
Anthony Stasio
05/09/2024
Special inspection requirement — Structural Steel - Details
Anthony Stasio
05/09/2024
Special inspection requirement — Final
Anthony Stasio
03/07/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/04/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/16/2024
Permit issued — Mechanical Systems
M00912757-I1-MS
02/16/2024
Permit issued — Structural
M00894446-I1-GC-CX
02/16/2024
Permit issued — Plumbing
M00907548-I1-PL
02/09/2024
Filed — Alteration
PROPOSED FACADE AND TERRACE STRUCTURAL REPAIRS AS INDICATED ON PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00900853-P2
02/08/2024
Special inspection requirement — Masonry
Anthony Stasio
02/08/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anthony Stasio
02/08/2024
Special inspection requirement — Final
Anthony Stasio
01/25/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/14/2023
Filed — Alteration
General interior renovations in the cellar and first floor and general exterior work as shown on the drawings filed herewith. No change in use, egress, or occupancy.
M00894446-P1
10/25/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/03/2023
Permit issued — Mechanical Systems
M00912757-I1-MS
09/12/2023
Permit issued — Plumbing
M00907548-I1-PL
09/06/2023
Permit issued — General Construction
M00894446-I1-GC-CX
08/09/2023
Filed — Alteration
General interior renovations in the cellar and first floor and general exterior work as shown on the drawings filed herewith. No change in use, egress, or occupancy.
M00894446-I1
08/02/2023
Filed — Alteration
Modification of the plumbing system to remove and install new plumbing fixtures and associated piping as shown on the drawings filed herewith. No change in use, egress, or occupancy.
M00907548-I1
08/02/2023
Filed — Alteration
Modification of the mechanical system to remove and install new units, associated ducts, and piping as shown on the drawings filed herewith. No change in use, egress, or occupancy.
M00912757-I1
07/17/2023
Permit issued — Structural
M00900853-I1-ST
07/17/2023
Permit issued — Structural
M00900853-I1-GC
07/12/2023
Filed — Alteration
PROPOSED FACADE AND TERRACE STRUCTURAL REPAIRS AS INDICATED ON PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00900853-I1
05/22/2023
Objection raised — Energy
05/22/2023
Objection raised — Scope
05/22/2023
Objection raised — Scope
05/22/2023
Objection raised — Structural
Latest 60 of 91 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offCypress Green Construction Co02/16/2024
DOB NOWStructuralSigned-offCypress Green Construction Co02/16/2024
DOB NOWPlumbingSigned-offBig Apple Plumbing02/16/2024
DOB NOWMechanical SystemsSigned-offCypress Green Construction Co10/03/2023
DOB NOWPlumbingSigned-offBig Apple Plumbing09/12/2023
DOB NOWGeneral ConstructionSigned-offCypress Green Construction Co09/06/2023
DOB NOWStructuralSigned-offDC Projects07/17/2023
DOB NOWStructuralSigned-offDC Projects07/17/2023
DOB NOWGeneral ConstructionSigned-offMY Trade Cabinet Co01/20/2023
DOB NOWSidewalk ShedSigned-offIntersystem Installation09/21/2020
DOB NOWSupported ScaffoldSigned-offIntersystem Installation09/16/2020
DOB NOWSidewalk ShedSigned-offIntersystem Installation07/02/2020
DOB NOWSupported ScaffoldSigned-offIntersystem Installation07/02/2020
BISOTISSUEDMC Contracting NY08/08/2022
BISOTISSUEDMC Contracting NY11/02/2020
BISOTISSUEDMC Contracting NY08/07/2020
BISMHISSUEDSin Kai Enterprises02/04/2009
BISPLISSUEDCity Testing & Plumbing I06/26/2006
BISOTISSUEDMei Biao06/26/2006
BISPLISSUEDMainline Plumbing04/14/1997
BISSPISSUEDCapitol Fire SPKL Co03/21/1997
3 projects · most recent 07/29/2026
General Wiring
FiledStatusContractorScope
07/29/2026Pending Payment VerificationLeader Electric CoGeneral Wiring
06/26/2024CompleteLeader Electric CoGeneral Wiring
07/21/2020CompleteSteven Farkas—
2 projects · most recent 05/21/2026
Steel Concrete Masonry
FiledStatusContractorScope
05/21/2026Signed-offDC Projects1 scope_items
05/04/2023——Steel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
05/10/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/07/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/04/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/25/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/25/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 56
DateRequirementInspectorRole
05/22/2026MasonryAnthony Stasiospecial
05/22/2026Structural Stability – Alterations of existing buildingsAnthony Stasiospecial
05/22/2026FinalAnthony Stasioprogress
06/10/2024Fire-Resistance Rated ConstructionAnthony Stasioprogress
06/10/2024Post-installed AnchorsAnthony Stasiospecial
06/10/2024Structural Steel - DetailsAnthony Stasiospecial
06/10/2024Fire-Resistant Penetrations and JointsAnthony Stasiospecial
06/10/2024MasonryAnthony Stasiospecial
06/10/2024Structural Cold-Formed SteelAnthony Stasiospecial
06/10/2024Structural Stability – Alterations of existing buildingsAnthony Stasiospecial
06/10/2024FinalAnthony Stasioprogress
06/04/2024Post-installed AnchorsAnthony Stasiospecial
06/04/2024Structural Stability – Alterations of existing buildingsAnthony Stasiospecial
06/04/2024Structural Steel - DetailsAnthony Stasiospecial
06/04/2024FinalAnthony Stasioprogress
06/04/2024Fire-Resistance Rated ConstructionAnthony Stasioprogress
06/04/2024Fire-Resistant Penetrations and JointsAnthony Stasiospecial
06/04/2024MasonryAnthony Stasiospecial
06/04/2024Structural Cold-Formed SteelAnthony Stasiospecial
05/09/2024Fire-Resistance Rated ConstructionAnthony Stasioprogress
05/09/2024Structural Cold-Formed SteelAnthony Stasiospecial
05/09/2024Structural Stability – Alterations of existing buildingsAnthony Stasiospecial
05/09/2024Fire-Resistant Penetrations and JointsAnthony Stasiospecial
05/09/2024MasonryAnthony Stasiospecial
05/09/2024Post-installed AnchorsAnthony Stasiospecial
Latest 25 of 56.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Pride Live - SNMVCArts / Culture / EntertainmentCellar, Floors 1, 2, Roof
Project M00907548 Alteration · LOC Issued · 08/02/2023
Project M00912757 Alteration · LOC Issued · 08/02/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 145 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch12
09/01/2026M08041894-P1Request digital key ↗
09/01/2026M08041894-I1Request digital key ↗
08/29/2026M00907548-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00365147-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/04/2026M00365165-I1Request digital key ↗
▸Applications & Permits27
▸DOB NOWLPC Approval/Permit11
08/28/2026M00900853-P3Open ↗
08/13/2026M08041894-I1Open ↗
08/13/2026M00907548-I1Open ↗
Showing 3 of 11 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION10
06/06/2024123685431Open ↗
06/08/2023123685431Open ↗
08/09/2022123685431Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION6
08/09/2022123685431Open ↗
08/07/2020123685431Open ↗
08/03/2009110287797Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications42
▸DOB NOWSpecial Inspector Seal & Signature15
09/01/2026M00907548-I1Open ↗
08/30/2026M00900853-I1Open ↗
08/30/2026M00900853-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/01/2026M08041894-I1Open ↗
09/01/2026M08041894-P1Open ↗
08/28/2026M00900853-P3Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/27/2026M00365165-I1Open ↗
08/30/2026M00900853-I1Open ↗
08/29/2026M08041894-P1Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
07/15/2019123685431Open ↗
03/19/2010110287797Open ↗
07/17/2008110287797Open ↗
▸Trade Schedules & Equipment7
▸BISEQUIPMENT USE APPLICATION/PERMIT3
03/19/2010110287797Open ↗
07/17/2008110287797Open ↗
03/16/2010110287797Open ↗
▸BISSCHEDULE B - PLUMBING2
01/22/2009110287797Open ↗
07/17/2008110287797Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
11/30/2009110287797Open ↗
▸BISEQUIPMENT USE PERMITS1
03/16/2010110287797Open ↗
▸Safety & Tenant Protection4
▸BISTENANT PROTECTION PLAN AND NOTES2
01/11/2021123685431Open ↗
12/23/2020123685431Open ↗
▸DOB NOWTenant Protection Plan2
08/13/2026M00365165-I1Open ↗
08/13/2026M00365147-I1Open ↗
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
09/01/2026M08041894-I1Open ↗
09/01/2026M08041894-P1Open ↗
08/28/2026M00900853-I1Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/15/2019123685431Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
07/17/2008110287797Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
07/15/2019123685431Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
04/25/2024123685431Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
04/25/2024123685431Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
04/25/2024123685431Open ↗
▸Approvals, Objections & Sign-offs8
▸BISLANDMARKS APPROVAL3
05/21/2020123685431Open ↗
03/19/2010110287797Open ↗
10/20/2008110287797Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
06/07/2024123685431Open ↗
04/29/2024123685431Open ↗
03/19/2010110287797Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
07/17/2008110287797Open ↗
▸BISLANDMARKS SIGNOFF1
04/29/2024123685431Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
04/25/2024123685431Open ↗
06/07/2023123685431Open ↗
05/18/2022123685431Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms12
▸BISADDITIONAL INFORMATION9
06/13/2023123685431Open ↗
06/03/2022123685431Open ↗
05/26/2022123685431Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING COVER SHEET2
07/15/2019123685431Open ↗
07/17/2008110287797Open ↗
▸BISBOROUGH INTAKE FORM1
08/09/2022123685431Open ↗
▸Other Documents8
▸DOB NOWProof of Historic Building8
08/13/2026M08041894-P1Open ↗
08/13/2026M00894446-P3Open ↗
08/13/2026M08041894-I1Open ↗
Showing 3 of 8 on file for this type