← Back
Walk-up apt, over six families with stores
64 EAST BROADWAY
MANHATTAN · BIN 1077595
💬 Discuss this project
1900Year Built
5Stories
C7Building Class
C6-1GZoning
15,082 sfGross Floor Area
28Units
Rent Stabilized13 Open Violations ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: 64 EAST BROADWAY REALTY · 3,438 sf lot · 4.39 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingGeneral
Floor 32p · 1 filing · 20 docs
Floor 2
Floor 12p · 2 filings · 13 docs
Cellar2p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
98 RIVINGTON REALTY2607/08/2026
64 EAST BROADWAY REALTY203/22/2026
64 EAST BROAWAY103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHUN FENG, ARCHITECT303/19/2025
REVANS DESIGN PE PC811/28/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HIGH QUALITY 338603/21/2026
SUSKA1003/21/2026
DEMAR PLUMBING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AMERICAN STANDARD P&H CORORP.Plumbing607/08/2026
DEMAR MECHANICAL INCPlumbing307/08/2026
HIGH QUALITY CONSTRUCTIONGeneral Contractor203/21/2026
DEMAR PLUMBING CORPPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244303/19/2025
REVANS DESIGN PE PC4617711/28/2023
Building Lifecycle
All (109)Filed (11)Permit Issued (7)Signed Off (3)Violation (60)Inspection (10)Special Inspection (18)
05/06/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/28/2025
Violation issued (FDNY_ORDER, closed)
04/28/2025
Violation issued (FDNY_ORDER, closed)
04/28/2025
Violation issued (FDNY_ORDER, closed)
03/28/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/28/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/20/2025
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
03/20/2025
Special inspection requirement — Tenant Protection Plan Compliance
03/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
03/19/2025
Filed — Alteration
FILE PLUMBING WORK IN CONJUNCTION WITH GC JOB #M01172088. MODIFICATION TO EXISTING COMMERCIAL KITCHEN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01172423-P1
03/19/2025
Special inspection requirement — Tenant Protection Plan Compliance
03/17/2025
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
03/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
01/31/2025
Permit issued — Plumbing
M01172423-I1-PL
01/31/2025
Permit issued — General Construction
M01172088-I1-GC
01/28/2025
Filed — Alteration
FILE PLUMBING WORK IN CONJUNCTION WITH GC JOB #M01172088. MODIFICATION TO EXISTING COMMERCIAL KITCHEN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01172423-I1
01/28/2025
Filed — Alteration
M01172088-I1
04/16/2024
Violation issued (HPD, closed)
A
01/25/2024
Signed off — Alteration
REPLACE NEW GAS METER BARS, GAS METERS, & GAS PIPING AS PER PLANS. RECONNECT TO EXISTING APPLIANCES. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
M00487580-I1
11/29/2023
Signed off — Alteration
REPLACE (1) NEW LOW PRESSURE BOILER & INTEGRAL BURNER IN SAME PLACES AS EXISTING. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
M00487541-I1
11/29/2023
Signed off — Alteration
INSTALL NEW HOT WATER BOILER (DOMESTIC HOT WATER) AND HOT WATER STORAGE TANK. NO CHANGE IN MEANS OF EGRESS, USE GROUP, OR OCCUPANCY.
M00784606-I1
11/28/2023
Filed — Alteration
REPLACE NEW GAS METER BARS, GAS METERS, & GAS PIPING AS PER PLANS. RECONNECT TO EXISTING APPLIANCES. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
M00487580-P4
10/18/2023
Violation issued (HPD, closed)
C
10/18/2023
Violation issued (HPD, closed)
B
10/18/2023
Violation issued (HPD, closed)
C
10/18/2023
Violation issued (HPD, closed)
B
10/18/2023
Violation issued (HPD, closed)
B
10/18/2023
Violation issued (HPD, closed)
B
10/18/2023
Violation issued (HPD, closed)
B
10/18/2023
Violation issued (HPD, closed)
B
10/18/2023
Violation issued (HPD, closed)
B
10/18/2023
Violation issued (HPD, closed)
B
10/18/2023
Violation issued (HPD, closed)
B
10/18/2023
Violation issued (HPD, closed)
B
10/18/2023
Violation issued (HPD, closed)
A
10/18/2023
Violation issued (HPD, closed)
C
10/18/2023
Violation issued (HPD, closed)
B
09/18/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/29/2023
Violation issued (HPD, closed)
A
09/27/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL REVANS
09/27/2022
Special inspection requirement — Maintenance information
PAUL REVANS
08/24/2022
Permit issued — Boiler Equipment
M00784606-I1-BE
08/22/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
08/11/2022
Filed — Alteration
INSTALL NEW HOT WATER BOILER (DOMESTIC HOT WATER) AND HOT WATER STORAGE TANK. NO CHANGE IN MEANS OF EGRESS, USE GROUP, OR OCCUPANCY.
M00784606-I1
08/08/2022
Special inspection requirement — HVAC-R and service water heating system controls
PAUL REVANS
08/08/2022
Special inspection requirement — Maintenance information
PAUL REVANS
08/08/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL REVANS
08/08/2022
Special inspection requirement — HVAC-R and service water heating equipment
PAUL REVANS
08/06/2022
Filed — Alteration
REPLACE (1) NEW LOW PRESSURE BOILER & INTEGRAL BURNER IN SAME PLACES AS EXISTING. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
M00487541-P1
04/27/2022
Permit issued — Boiler Equipment
M00487541-I1-BE
04/27/2022
Permit issued — Plumbing
M00487580-I1-PL
12/20/2021
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
12/14/2021
Filed — Alteration
REPLACE NEW GAS METER BARS, GAS METERS, & GAS PIPING AS PER PLANS. RECONNECT TO EXISTING APPLIANCES. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
M00487580-P3
12/14/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL REVANS
12/14/2021
Special inspection requirement — Maintenance information
PAUL REVANS
12/08/2021
Filed — Alteration
REPLACE NEW GAS METER BARS, GAS METERS, & GAS PIPING AS PER PLANS. RECONNECT TO EXISTING APPLIANCES. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
M00487580-P2
12/02/2021
Special inspection requirement — Maintenance information
PAUL REVANS
12/02/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL REVANS
08/13/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/03/2021
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
Latest 60 of 109 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.01/31/2025
DOB NOWGeneral ConstructionPermit IssuedHIGH QUALITY CONSTRUCTION01/31/2025
DOB NOWBoiler EquipmentSigned-offDEMAR MECHANICAL INC08/24/2022
DOB NOWBoiler EquipmentSigned-offDEMAR MECHANICAL INC04/27/2022
DOB NOWPlumbingSigned-offDEMAR MECHANICAL INC04/27/2022
DOB NOWBoiler EquipmentSigned-offDEMAR PLUMBING CORP05/19/2021
DOB NOWPlumbingSigned-offDEMAR PLUMBING CORP05/19/2021
BISFPISSUEDNY FIRE LLC04/02/2015
BISFPISSUEDROCKLEDGE SCAFFOLD11/21/2005
BISFPISSUEDFIRE FOE SYSTEM CORP07/30/2003
BISPLRE-ISSUEDLLOYD G DRUMMOND PLBG&GEN07/01/2003
BISOTISSUEDPEACORP06/09/2003
BISFPISSUEDMASTER FIRE PREVENTION SYSTEMS03/27/1998
BISFPISSUEDARROW MECH. SYSTEMS/IDEAL FIRE11/12/1991
1 project · most recent 03/19/2025
Gas Water/Sanitary
FiledStatusContractorScope
03/19/2025Signed-offAMERICAN STANDARD P&H CORGas, Water/Sanitary
1 project · most recent 02/07/2025
General Wiring
FiledStatusContractorScope
02/07/2025CompleteE D ELECTRICAL INCGeneral Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
05/06/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/28/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/18/2023Pass-Final Boiler Equipment InspectionPassView ↗
08/22/2022Pass-Final Boiler Equipment InspectionPassView ↗
12/20/2021Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/13/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/03/2021Fail-Final PL - Up to 9 Requested FloorsFailView ↗
07/16/2021Fail-Final PL - Up to 9 Requested FloorsFailView ↗
07/12/2021Fail-Final PL - Up to 9 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
03/20/2025Energy Code Compliance InspectionsNARESH MAHANGUprogress
03/20/2025Tenant Protection Plan Compliance—special
03/20/2025Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
03/19/2025Tenant Protection Plan Compliance—special
03/17/2025Energy Code Compliance InspectionsNARESH MAHANGUprogress
03/17/2025Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
09/27/2022Fire-Resistant Penetrations and JointsPAUL REVANSspecial
09/27/2022Maintenance informationPAUL REVANSenergy_progress
08/08/2022HVAC-R and service water heating system controlsPAUL REVANSenergy_progress
08/08/2022Maintenance informationPAUL REVANSenergy_progress
08/08/2022Fire-Resistant Penetrations and JointsPAUL REVANSspecial
08/08/2022HVAC-R and service water heating equipmentPAUL REVANSenergy_progress
12/14/2021Fire-Resistant Penetrations and JointsPAUL REVANSspecial
12/14/2021Maintenance informationPAUL REVANSenergy_progress
12/02/2021Maintenance informationPAUL REVANSenergy_progress
12/02/2021Fire-Resistant Penetrations and JointsPAUL REVANSspecial
07/21/2021Fire-Resistant Penetrations and JointsPAUL REVANSspecial
07/21/2021Maintenance informationPAUL REVANSenergy_progress
▾Documents — 56 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
09/03/2026M00487541-P1Request digital key ↗
09/03/2026M00487541-I1Request digital key ↗
09/03/2026M00487580-P2Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits1
▸BISWORK PERMIT APPLICATION1
04/13/2015122214852Open ↗
▸Seals & Professional Certifications25
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/03/2026M00487580-I1Open ↗
09/03/2026M00487580-P2Open ↗
09/03/2026M00487580-P3Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/20/2026M00487541-I1Open ↗
08/29/2026M00487580-P2Open ↗
08/26/2026M01172423-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/20/2026M00487541-I1Open ↗
08/29/2026M00487580-P2Open ↗
08/26/2026M01172423-I1Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
09/03/2026M00487580-P4Open ↗
09/03/2026M00487580-I1Open ↗
09/03/2026M00487580-P1Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/16/2015122214852Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
09/03/2026M00487580-I1Open ↗
08/13/2026M00487541-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/11/2015122214852Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
09/11/2015122214852Open ↗
01/16/2015122214852Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
01/16/2015122214852Open ↗
▸Other Documents1
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
09/11/2015122214852Open ↗