BuildNYC
Public elementary, junior or senior high
Hunter College High School
51 EAST 94TH STREET · BIN 1047404
💬 Discuss this project
1972Year Built
4Stories
W1Building Class
R8BZoning
192,301 sfGross Floor Area
1Units
LL97 Covered8 Active Violations 4 unresolved · 4 paperwork only 3 likely answered ▸FISP: SAFEFDNY Report ↗
Public elementary, junior or senior high · Owner of record: City University of New York · 80,566 sf lot · 2.39 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingCivil
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Hunter College Campus Schools4p · 1 filing · 13 docs
Sub-CellarHunter College Campus Schools1p · 1 filing · 18 docs
BasementHunter College Campus Schools1p · 1 filing · 18 docs
Site & exteriorHunter College Campus Schools14p · 1 filing · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Dormitory Authority of the State3703/21/2026
Hunter College2304/09/2026
City University of New York1503/22/2026
Dasny1007/08/2026
CUNY Design and Construction403/21/2026
CUNY303/21/2026
Fox Industries203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AKRF112/19/2024
Cosentini Associates112/16/2024
Shakespeare, Gordon, Vlado Architects112/12/2024
Genesys Engineering210/21/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RPO603/21/2026
Municipal Building Consultants203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Volmar ConstructionGeneral Contractor304/09/2026
Eastern Plumbing & Mechanical ContractingPlumbing207/08/2026
VMC Plumbing & HeatingPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Socotec Engineering4983112/12/2024
Building Lifecycle
All (81)Filed (5)Permit Issued (7)Signed Off (1)Facade (FISP) (4)Violation (60)Inspection (4)
12/03/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/19/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
08/15/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/08/2025
Permit issued — Plumbing
M01149946-S1-PL
07/02/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/11/2025
Permit issued — Plumbing
M01149946-S2-PL
04/30/2025
Permit issued — Earth Work
M01149946-I1-ST
04/29/2025
Permit issued — General Construction
M01149946-I1-EA
03/25/2025
Permit issued — General Construction
M01149946-I1-GC
03/20/2025
Violation issued (FDNY_ORDER, closed)
03/20/2025
Violation issued (FDNY_ORDER, closed)
03/20/2025
Violation issued (FDNY_ORDER, closed)
03/20/2025
Violation issued (FDNY_ORDER, closed)
12/19/2024
Filed — Alteration
Plumbing work associated with Playground renovation as shown on drawings filed herewith. No change in occupancy, use or egress.
M01149946-S2
12/16/2024
Filed — Alteration
Plumbing work associated with Playground renovation as shown on drawings filed herewith. No change in occupancy, use or egress.
M01149946-S1
12/12/2024
Filed — Alteration
Plumbing work associated with Playground renovation as shown on drawings filed herewith. No change in occupancy, use or egress.
M01149946-I1
10/18/2024
Violation issued (ECB, open)
Construction
10/03/2024
Violation issued (FDNY_NOV, closed)
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/25/2023
Violation issued (FDNY_NOV, closed)
11/21/2022
Violation issued (FDNY_NOV, closed)
06/13/2022
Violation issued (FDNY_ORDER, closed)
06/13/2022
Violation issued (FDNY_ORDER, closed)
12/07/2021
Violation issued (ECB, open)
Elevators
10/21/2021
Signed off — Alteration
boiler replacement
M00324028-I1
10/15/2021
Violation issued (ECB, open)
Elevators
05/22/2021
Violation issued (FDNY_ORDER, closed)
12/11/2020
Violation issued (FDNY_ORDER, closed)
10/21/2020
Filed — Alteration
boiler replacement
M00324028-P3
06/24/2020
Permit issued — Boiler Equipment
M00324028-I1-BE
04/22/2020
Permit issued — Boiler Equipment
M00324028-I1-BE
03/13/2020
Filed — Alteration
boiler replacement
M00324028-I1
01/27/2020
Violation issued (ECB, closed)
Boilers
01/14/2020
Violation issued (ECB, closed)
Boilers
09/06/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/19/2019
Violation issued (FDNY_ORDER, closed)
01/26/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/05/2017
Violation issued (FDNY_ORDER, closed)
06/20/2017
Violation issued (ECB, closed)
Unknown
10/08/2016
Violation issued (FDNY_ORDER, closed)
10/31/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/30/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/31/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/01/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/21/2012
Violation issued (ECB, closed)
Elevators
08/15/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/15/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/08/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/28/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/22/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/27/2010
Violation issued (ECB, open)
Construction
12/04/2009
Violation issued (ECB, closed)
Construction
11/30/2009
Cycle 6 facade report submitted
11/18/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/22/2009
Violation issued (ECB, closed)
Construction
02/20/2009
Violation issued (FDNY_NOV, closed)
11/27/2008
Violation issued (ECB, closed)
Construction
10/22/2008
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
10/22/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 81 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offM. Spinelli PLB & Heating07/08/2025
DOB NOWPlumbingSigned-offM. Spinelli PLB & Heating06/11/2025
DOB NOWEarth WorkSigned-offVolmar Construction04/30/2025
DOB NOWGeneral ConstructionSigned-offVolmar Construction04/29/2025
DOB NOWGeneral ConstructionSigned-offVolmar Construction03/25/2025
DOB NOWBoiler EquipmentSigned-offEastern Plumbing & Mechanical Contracting06/24/2020
DOB NOWBoiler EquipmentSigned-offEastern Plumbing & Mechanical Contracting04/22/2020
BISOTISSUEDC. D. E. Air-Conditioning04/08/2022
BISMHISSUEDC. D. E. Air-Conditioning04/08/2022
BISOTISSUEDC. D. E. Air-Conditioning04/08/2022
BISOTISSUEDC. D. E. Air-Conditioning04/08/2022
BISPLISSUEDEastern Plumbing & Mechanical Contracting04/27/2021
BISOTISSUEDC. D. E. Air-Conditioning04/14/2021
BISOTISSUEDC. D. E. Air-Conditioning04/14/2021
BISMHISSUEDC. D. E. Air-Conditioning04/14/2021
BISOTISSUEDC. D. E. Air-Conditioning04/14/2021
BISOTISSUEDC. D. E. Air-Conditioning09/15/2020
BISOTISSUEDC. D. E. Air-Conditioning09/15/2020
BISMHISSUEDC. D. E. Air-Conditioning09/15/2020
BISMHISSUEDC. D. E. Air-Conditioning09/15/2020
BISOTISSUEDC. D. E. Air-Conditioning09/15/2020
BISOTISSUEDC. D. E. Air-Conditioning09/15/2020
BISOTISSUEDWinick Productions09/11/2020
BISPLISSUEDEastern Plumbing & Mechanical Contracting04/17/2020
BISPLISSUEDEastern Plumbing & Mechanical Contracting04/17/2020
BISMHISSUEDC. D. E. Air-Conditioning04/16/2020
BISOTISSUEDC. D. E. Air-Conditioning04/16/2020
BISOTISSUEDC. D. E. Air-Conditioning04/16/2020
BISOTISSUEDC. D. E. Air-Conditioning04/16/2020
BISOTISSUEDOnsite Construction Enterprises11/14/2019
BISOTISSUEDC. D. E. Air-Conditioning08/12/2019
BISOTISSUEDC. D. E. Air-Conditioning07/18/2019
BISPLISSUEDEastern Plumbing & Mechanical Contracting05/08/2019
BISPLISSUEDEastern Plumbing & Mechanical Contracting05/08/2019
BISOTISSUEDC. D. E. Air-Conditioning02/15/2019
BISMHISSUEDC. D. E. Air-Conditioning02/15/2019
BISOTISSUEDC. D. E. Air-Conditioning02/15/2019
BISOTISSUEDC. D. E. Air-Conditioning02/15/2019
BISMHISSUEDTrane U.S08/17/2016
BISOTISSUEDTrane U.S08/12/2016
+ 17 more permits on file
1 project · most recent 12/19/2024
Storm Water/Sanitary
FiledStatusContractorScope
12/19/2024Signed-offM. Spinelli PLB & HeatingStorm, Water/Sanitary
3 projects · most recent 11/06/2024
General Wiring
FiledStatusContractorScope
11/06/2024CompleteWilldan Electrical of NYGeneral Wiring
03/29/2022CompleteArk Systems ElectricGeneral Wiring
02/25/2019Permit IssuedArk Systems Electric—
1 project · most recent 12/19/2024
Concrete
FiledStatusContractorScope
12/19/2024Signed-offM. Spinelli PLB & HeatingConcrete
1 project · most recent 12/19/2024
Earthwork
FiledStatusContractorScope
12/19/2024Signed-offM. Spinelli PLB & HeatingEarthwork
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
12/03/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/19/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
08/15/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/02/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
12/06/2024Post-installed AnchorsMARISA HARTEspecial
12/03/2024FinalMARISA HARTEprogress
10/26/2020Shutoff dampersStephen Marcheseenergy_progress
10/26/2020HVAC and service water heating system controls Stephen Marcheseenergy_progress
10/26/2020Maintenance informationStephen Marcheseenergy_progress
10/26/2020HVAC and service water heating equipment Stephen Marcheseenergy_progress
10/26/2020Electrical motorsStephen Marcheseenergy_progress
10/20/2020HVAC and service water heating system controls Stephen Marcheseenergy_progress
10/20/2020Maintenance informationStephen Marcheseenergy_progress
10/20/2020Shutoff dampersStephen Marcheseenergy_progress
10/20/2020HVAC and service water heating equipment Stephen Marcheseenergy_progress
10/20/2020Electrical motorsStephen Marcheseenergy_progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Hunter College Campus SchoolsEducationSub-cellar, Floor 1
Project M01149946 Alteration · Permit Entire · 12/12/2024
Project M00324028 Alteration · LOC Issued · 03/13/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 395 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch3
08/25/2026M01149946-I1Request digital key ↗
08/25/2026M01149946-S2Request digital key ↗
08/25/2026M01149946-S1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment2
09/04/2026M00324028-I1Request digital key ↗
09/04/2026M00324028-P3Request digital key ↗
▸Applications & Permits65
▸BISPLAN / WORK APPROVAL APPLICATION41
09/09/2021123228177Open ↗
08/27/2021123228177Open ↗
06/14/2021123228177Open ↗
Showing 3 of 41 on file for this type
▸BISWORK PERMIT APPLICATION23
09/11/2020140950638Open ↗
11/14/2019123789445Open ↗
06/12/2019140853976Open ↗
Showing 3 of 23 on file for this type
▸BISPLACE OF ASSEMBLY1
06/11/2018123584415Open ↗
▸Seals & Professional Certifications78
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION40
11/25/2019140853976Open ↗
11/14/2019123789445Open ↗
11/14/2019123789445Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/23/2026M00324028-I1Open ↗
09/23/2026M00324028-I1Open ↗
09/23/2026M00324028-I1Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT9
09/10/2020140950638Open ↗
11/14/2019123789445Open ↗
08/20/2019140857892Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/04/2026M00324028-I1Open ↗
09/04/2026M00324028-P3Open ↗
08/25/2026M01149946-S2Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
11/14/2019123789445Open ↗
Showing 1 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
09/10/2020140950638Open ↗
08/20/2019140857892Open ↗
06/12/2019140853976Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
09/10/2020140950638Open ↗
08/20/2019140857892Open ↗
06/12/2019140853976Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
09/20/2026M01149946-I1Open ↗
▸Trade Schedules & Equipment36
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE10
07/13/2018123425604Open ↗
03/30/2018123425604Open ↗
12/22/2017123228177Open ↗
Showing 3 of 10 on file for this type
▸BISEQUIPMENT USE PERMITS8
11/17/2022123228177Open ↗
11/17/2022123228177Open ↗
11/17/2022123228177Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING8
09/09/2021123228177Open ↗
08/27/2021123228177Open ↗
06/14/2021123228177Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT4
07/29/2019140853976Open ↗
06/12/2019140853976Open ↗
Showing 2 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
11/17/2022123228177Open ↗
10/20/2022123228177Open ↗
Showing 2 of 3 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
05/13/2022123224126Open ↗
Showing 1 of 2 on file for this type
▸BISSELF-CERT PLUMBING NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection4
▸BISTenant Protection Plan and Notes2
11/14/2019123789445Open ↗
12/22/2017123228177Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
08/20/2019140857892Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos13
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
09/04/2026M00324028-I1Open ↗
08/25/2026M01149946-S1Open ↗
08/25/2026M01149946-I1Open ↗
▸BISDEP FORM V5 - ASBESTOS VARIANCE2
11/14/2019123789445Open ↗
02/15/2019123228177Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
06/12/2019140853976Open ↗
Showing 1 of 2 on file for this type
▸BISAPPLICANT SHALL PROVIDE 1 ACP-21 FORMPRIOR TO SIGN OFF: TRU0319MN191
10/20/2022123228177Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
01/03/2022123228177Open ↗
▸Energy Compliance33
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS20
11/25/2019140853976Open ↗
11/14/2019123789445Open ↗
11/14/2019123789445Open ↗
Showing 3 of 20 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
11/14/2022123228177Open ↗
10/20/2022123228177Open ↗
12/20/2021123228177Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
10/20/2022123228177Open ↗
12/20/2021123228177Open ↗
11/25/2019140853976Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
06/12/2019140853976Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
09/04/2026M00324028-I1Open ↗
▸Inspections & Test Reports36
▸BISTECHNICAL REPORT: RESPONSIBILITY27
11/14/2022123228177Open ↗
11/14/2022123228177Open ↗
11/14/2022123228177Open ↗
Showing 3 of 27 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)3
09/10/2020140950638Open ↗
08/20/2019140857892Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
11/15/2022123228177Open ↗
02/15/2019123228177Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
02/15/2019123228177Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
11/15/2022123228177Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
08/20/2019140857892Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
08/20/2019140857892Open ↗
▸Approvals, Objections & Sign-offs37
▸BISLANDMARKS APPROVAL11
09/10/2020140950638Open ↗
11/14/2019123789445Open ↗
08/20/2019140857892Open ↗
Showing 3 of 11 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
11/15/2022123228177Open ↗
11/25/2019140853976Open ↗
02/12/2018122089211Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
09/04/2026M00324028-I1Open ↗
09/04/2026M00324028-P3Open ↗
08/25/2026M01149946-S2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)5
09/04/2026M00324028-I1Open ↗
09/04/2026M00324028-P3Open ↗
08/13/2026M01149946-I1Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
11/15/2022123228177Open ↗
11/25/2019140853976Open ↗
Showing 2 of 3 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISLANDMARKS SIGNOFF2
10/20/2022123228177Open ↗
Showing 1 of 2 on file for this type
▸BISFINAL1
09/10/2020140950638Open ↗
▸DOB NOWDEP Variance (V5) letter1
09/04/2026M00324028-I1Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
09/04/2026M00324028-I1Open ↗
▸Cost, Insurance & Ownership37
▸BISCOST AFFIDAVIT37
10/20/2022123228177Open ↗
10/20/2022123228177Open ↗
10/20/2022123228177Open ↗
Showing 3 of 37 on file for this type
▸Filing & Intake Forms42
▸BISEFILING COVER SHEET19
11/14/2019123789445Open ↗
04/04/2019123836661Open ↗
03/30/2018123425604Open ↗
Showing 3 of 19 on file for this type
▸BISADDITIONAL INFORMATION11
06/21/2021123228177Open ↗
06/21/2021123228177Open ↗
10/21/2020123228177Open ↗
Showing 3 of 11 on file for this type
▸BISBOROUGH INTAKE FORM7
11/25/2019140853976Open ↗
07/26/2019140853976Open ↗
05/09/2019123228177Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
09/10/2020140950638Open ↗
08/20/2019140857892Open ↗
06/12/2019140853976Open ↗
Showing 3 of 5 on file for this type
▸Other Documents9
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION7
04/04/2019123836661Open ↗
06/11/2018123584415Open ↗
03/28/2018123425604Open ↗
Showing 3 of 7 on file for this type
▸BISSupporting Document: Fee Deferment1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type