← Back
Elevator apt, fireproof with stores
51 IRVING PLACE
MANHATTAN · Gramercy · BIN 1078732
💬 Discuss this project
1969Year Built
6Stories
D6Building Class
R8AZoning
42,476 sfGross Floor Area
58Units
Rent Stabilized2 Open Violations ▸FISP: SAFE
Elevator apt, fireproof with stores · Owner of record: GH 51 IRVING LLC · 7,900 sf lot · 5.38 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneralOther
Roof15p · 2 filings · 20 docs
Floor 36p · 1 filing · 14 docs
Floor 26p · 1 filing · 14 docs
Floor 17p · 2 filings · 17 docs
Sub-Cellar4p · 1 filing · 14 docs
Site & exterior14p · 3 filings · 20 docs
Filed — no permit issued8p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GH 51 IRVING1407/08/2026
RIMKUS NEW YORK PLLC1207/08/2026
SP IRVING OWNER LLC IRVING FIFT703/21/2026
SP IRVING OWNER LLC503/21/2026
METRO CONTRACTING NY203/21/2026
53 IRVING PLACE203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/17/2024$3.2M—IRVING FIFTY ONE LLC → GH 51 IRVING LLC$74/sf building
06/15/2023$30.7M—SP IRVING OWNER LLC → GH 51 IRVING LLC$723/sf building
05/12/2016$55.5M—DELORENZO HOUSE, L.L.C. → SP IRVING OWNER LLC$1,307/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
UNIVERSAL SIGNS SERVICE203/21/2026
TRADITIONAL WATERPROOFING & RESTORA603/21/2026
GEIGER E A GROUP403/21/2026
RIMKUS NEW YORK PLLC403/21/2026
CLARKE CONSTRUCTION CONSULTANTS303/21/2026
MYLES ARCHITECTURE P C603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MC SUPERSTRUCTURE INCGeneral Contractor803/21/2026
TRADITIONAL WATERPROOFINGGeneral Contractor204/09/2026
PAUL OLSENElectrical203/21/2026
AP HVAC INCGeneral Contractor204/09/2026
ALAFOGIANNIS PLBG & HTGPlumbing107/08/2026
APRILAKIS, EVANGELINAElectrical103/21/2026
UNIVERSAL SIGNS SVCScaffold107/08/2026
BROWN, JERMAINEElectrical103/21/2026
HECTOR MEJIAElectrical103/21/2026
MEJIA HECTORElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RIMKUS NEW YORK, PLLC8123210/16/2025
CROSSCHECK INSPECTION SER544301/24/2025
MYLES ARCHITECTURE, P.C.2938302/03/2020
Building Lifecycle
All (145)Filed (14)Permit Issued (13)Signed Off (6)Facade (FISP) (18)Violation (60)Inspection (1)Objection (8)Special Inspection (25)
04/02/2026
Signed off — Alteration
MH WORK FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01068564-S1
04/02/2026
Signed off — Alteration
MH WORK FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01068564-S2
02/18/2026
Permit issued — Mechanical Systems
M01068564-S2-MS
02/18/2026
Permit issued — Mechanical Systems
M01068564-S1-MS
02/10/2026
Cycle 9 facade report submitted
02/09/2026
Cycle 9 facade report signed — SAFE
02/02/2026
Cycle 9 facade inspection completed
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/28/2025
Signed off — Alteration
M01040334-I1
10/28/2025
Special inspection requirement — Post-installed Anchors
WILLIAM DAVIS
10/28/2025
Special inspection requirement — Insulation placement and R values
WILLIAM DAVIS
10/28/2025
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM DAVIS
10/28/2025
Special inspection requirement — Final
WILLIAM DAVIS
10/28/2025
Special inspection requirement — Tenant Protection Plan Compliance
WILLIAM DAVIS
10/28/2025
Special inspection requirement — Masonry
WILLIAM DAVIS
10/16/2025
Filed — Alteration
M01040334-P1
10/16/2025
Signed off — Alteration
Suspended Scaffold for work and observation.
M01087807-I1
10/03/2025
Special inspection requirement — Insulation placement and R values
WILLIAM DAVIS
10/03/2025
Special inspection requirement — Masonry
WILLIAM DAVIS
10/03/2025
Special inspection requirement — Post-installed Anchors
WILLIAM DAVIS
10/03/2025
Special inspection requirement — Tenant Protection Plan Compliance
10/03/2025
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM DAVIS
10/03/2025
Special inspection requirement — Final
WILLIAM DAVIS
09/18/2025
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01093255-I1
08/21/2025
Permit issued — General Construction
M01040334-I1-GC
08/20/2025
Permit issued — Suspended Scaffold
M01087807-I1-SC
07/17/2025
Signed off — Alteration
ERECT ACCESSORY BUSINESS WALL SIGN FOR 51 IRVING PLACE, NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01225960-I1
07/16/2025
Permit issued — Sidewalk Shed
M01093255-I1-SH
07/16/2025
Permit issued — Sidewalk Shed
M01093255-I1-SF
07/07/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/11/2025
Permit issued — Sign
M01225960-I1-SG
06/06/2025
Filed — Alteration
ERECT ACCESSORY BUSINESS WALL SIGN FOR 51 IRVING PLACE, NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01225960-I1
05/14/2025
Special inspection requirement — Final
JERE MURDOCH
05/12/2025
Violation issued (ECB, closed)
Construction
05/12/2025
Violation issued (ECB, closed)
Construction
05/12/2025
Violation issued (ECB, closed)
Construction
05/12/2025
Violation issued (ECB, closed)
Construction
05/12/2025
Violation issued (ECB, closed)
Quality of Life
01/24/2025
Filed — Alteration
MH WORK FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01068564-S2
12/09/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Michael Lombardo
12/04/2024
Objection raised — Other
12/04/2024
Objection resolved — Addressed
11/27/2024
Special inspection requirement — Tenant Protection Plan Compliance
EUGENE BIFULCO
11/21/2024
Special inspection requirement — Mechanical Systems
EUGENE BIFULCO
11/21/2024
Special inspection requirement — Final
EUGENE BIFULCO
11/20/2024
Filed — Alteration
Suspended Scaffold for work and observation.
M01087807-P2
11/07/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Michael Lombardo
10/30/2024
Filed — Alteration
MH WORK FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01068564-S1
10/21/2024
Permit issued — Plumbing
M01068564-I1-PL
10/11/2024
Special inspection requirement — Tenant Protection Plan Compliance
EUGENE BIFULCO
10/10/2024
Special inspection requirement — Final
EUGENE BIFULCO
10/10/2024
Special inspection requirement — Mechanical Systems
EUGENE BIFULCO
10/07/2024
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01093255-P1
09/25/2024
Permit issued — Suspended Scaffold
M01087807-P1-SC
09/24/2024
Objection raised — Other
09/24/2024
Objection resolved — Addressed
09/18/2024
Filed — Alteration
Suspended Scaffold for work and observation.
M01087807-P1
08/29/2024
Permit issued — Suspended Scaffold
M01087807-I1-SC
08/26/2024
Permit issued — General Construction
M01040334-I1-GC
08/13/2024
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01093255-I1
Latest 60 of 145 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offAP HVAC02/18/2026
DOB NOWMechanical SystemsSigned-offAP HVAC02/18/2026
DOB NOWGeneral ConstructionSigned-offTRADITIONAL WATERPROOFING08/21/2025
DOB NOWSuspended ScaffoldSigned-offTRADITIONAL WATER AND RES08/20/2025
DOB NOWSidewalk ShedSigned-offMC SUPERSTRUCTURE INC07/16/2025
DOB NOWSidewalk ShedSigned-offMC SUPERSTRUCTURE INC07/16/2025
DOB NOWSignSigned-offUNIVERSAL SIGNS & SVC INC06/11/2025
DOB NOWPlumbingPermit IssuedALAFOGIANNIS PLBG & HTG10/21/2024
DOB NOWSuspended ScaffoldPermit IssuedTRADITIONAL WATER AND RES09/25/2024
DOB NOWSuspended ScaffoldSigned-offTRADITIONAL WATER AND RES08/29/2024
DOB NOWGeneral ConstructionSigned-offTRADITIONAL WATERPROOFING08/26/2024
DOB NOWSidewalk ShedSigned-offMC SUPERSTRUCTURE INC08/13/2024
DOB NOWSupported ScaffoldSigned-offMC SUPERSTRUCTURE INC08/13/2024
BISOTISSUEDBEAUTIFUL CONSULTING09/25/2019
BISOTISSUEDEURO T.I. INC06/08/2017
BISPLISSUEDTOP PLUMBING GROUP,INC01/25/2017
BISOTISSUEDBLUESTONE CONSTRUCTION AN11/23/2016
BISOTISSUEDBLUESTONE CONSTRUCTION AN10/21/2016
BISEQRE-ISSUEDROCKLEDGE SCAFFOLD CORP10/05/2016
BISEQISSUEDBLUESTONE CONSTRUCTION AN08/25/2016
BISOTISSUEDZ MIAH & SON CONTRACTING07/08/2016
BISEQISSUEDMETRO CONTRACTING NY, INC.07/06/2016
BISPLISSUEDTOP PLUMBING GROUP,INC06/16/2016
BISOTISSUEDBLUESTONE CONSTRUCTION AN06/09/2016
BISEQISSUEDROCKLEDGE SCAFFOLD CORP10/26/2015
BISFPISSUEDNY FIRE LLC06/30/2014
BISPLISSUEDHJA PLBG & HTG CORP04/02/2014
BISPLISSUEDFLINT MECHANICAL CORP10/21/2013
BISOTISSUEDEAST SIDE RENOVATIONS INC10/09/2013
BISOTISSUEDRAM BUILDERS11/07/2007
BISOTISSUEDRAM BUILDERS09/13/2007
BISMHISSUEDNACCO12/05/2003
BISFPISSUEDSAFETY CONSULTANTS INC05/10/2001
BISFPISSUEDSAFETY CONSULTANTS INC11/23/1999
BISPLISSUEDCALRAY GAS HEAT CORP.10/03/1996
BISBLISSUEDNEAL M. RUDIKOFF10/03/1996
1 project · most recent 01/24/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
01/24/2025Signed-offAP HVAC INCHeating and Air Conditioning Systems
Heat / Cool
Fujitsu AOU24RLXFWH 22 BTU · Heat Pump Outdoor ×1
AOU36RLAVS4 36,000 BTU · Heat Pump Outdoor ×1
AOU36RLXFZ1 35,200 BTU · Heat Pump Outdoor ×1
AOU45RLXFZ 45,000 BTU · Heat Pump Outdoor ×1
AOU48RLAVS4 48,000 BTU · Heat Pump Outdoor ×1
AOUH18LMAS1 18,000 BTU · Heat Pump Outdoor ×1
AOU36RLX 3 tons · Condensing Unit ×1
Goodman GSH130601AB 55,500 BTU · Heat Pump Outdoor ×2
GSC130361DE 35,000 BTU · Condensing Unit ×1
Coleman ZS-10N24ATAAA5A 24,000 BTU · Rooftop Unit ×1
Larkin LCH0015MCACHA0000 15,000 BTU ×1
Turbo Air TH008MR404A2-T 40,000 BTU · Condensing Unit ×1
Russel RFH150E44EA 15,000 BTU · Condensing Unit ×2
Samsung AM072FXVAFH 72,000 BTU · Vrf Indoor ×1
AM096FXVAFH 96,000 BTU · Vrf Outdoor ×1
Daikin RXB12AXVJU 11,000 BTU · Condensing Unit ×1
Mrcool DIYMULTI436HP230 36,000 BTU · Vrf Outdoor ×1
Tosot TW12HQ1C2D 12,000 BTU · Condensing Unit ×1
2 projects · most recent 01/24/2025
Gas Water/Sanitary Plumbing-Sprinkler
FiledStatusContractorScope
01/24/2025Permit IssuedALAFOGIANNIS PLBG & HTGGas, Water/Sanitary
02/03/2020——Gas, Plumbing-Sprinkler, Water/Sanitary
4 projects · most recent 09/14/2024
General Wiring Lighting
FiledStatusContractorScope
09/14/2024CompleteNASH ELECTRIC SERVICES IN—
08/14/2024CompleteNASH ELECTRIC SERVICES IN—
08/11/2022CompleteROBERT CHIMENTI61 meters, 1 new_meters
10/29/2019CompleteY.S ELECTRICGeneral Wiring, Lighting
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
07/07/2025Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
10/28/2025Post-installed AnchorsWILLIAM DAVISspecial
10/28/2025Insulation placement and R valuesWILLIAM DAVISenergy_progress
10/28/2025Energy Code Compliance InspectionsWILLIAM DAVISprogress
10/28/2025FinalWILLIAM DAVISprogress
10/28/2025Tenant Protection Plan ComplianceWILLIAM DAVISspecial
10/28/2025MasonryWILLIAM DAVISspecial
10/03/2025Insulation placement and R valuesWILLIAM DAVISenergy_progress
10/03/2025MasonryWILLIAM DAVISspecial
10/03/2025Post-installed AnchorsWILLIAM DAVISspecial
10/03/2025Tenant Protection Plan Compliance—special
10/03/2025Energy Code Compliance InspectionsWILLIAM DAVISprogress
10/03/2025FinalWILLIAM DAVISprogress
05/14/2025FinalJERE MURDOCHprogress
12/09/2024Alternative Materials - OTCR Buildings Bulletin NumberMichael Lombardospecial
11/27/2024Tenant Protection Plan ComplianceEUGENE BIFULCOspecial
11/21/2024Mechanical SystemsEUGENE BIFULCOspecial
11/21/2024FinalEUGENE BIFULCOprogress
11/07/2024Alternative Materials - OTCR Buildings Bulletin NumberMichael Lombardospecial
10/11/2024Tenant Protection Plan ComplianceEUGENE BIFULCOspecial
10/10/2024FinalEUGENE BIFULCOprogress
10/10/2024Mechanical SystemsEUGENE BIFULCOspecial
06/18/2024Tenant Protection Plan ComplianceEUGENE BIFULCOspecial
01/27/2020Fire-Resistant Penetrations and JointsKyu Ho Leespecial
12/17/2019Fire-Resistant Penetrations and JointsKyu Ho Leespecial
12/05/2019Fire-Resistant Penetrations and JointsKyu Ho Leespecial
▾Documents — 238 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch11
08/26/2026M01093255-I1Request digital key ↗
08/26/2026M01093255-P1Request digital key ↗
08/25/2026M01068564-S2Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/05/2026M00259278-I1Request digital key ↗
08/15/2026M00259278-P2Request digital key ↗
08/15/2026M00259278-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits40
▸BISPLAN / WORK APPROVAL APPLICATION19
12/13/2019123888944Open ↗
09/26/2019123818020Open ↗
06/13/2017140632554Open ↗
Showing 3 of 19 on file for this type
▸BISWORK PERMIT APPLICATION19
12/16/2019123818020Open ↗
12/13/2019123888944Open ↗
09/26/2019123818020Open ↗
Showing 3 of 19 on file for this type
▸BISPLACE OF ASSEMBLY2
02/08/2018123115627Open ↗
08/21/2017123115627Open ↗
▸Seals & Professional Certifications78
▸BISPROFESSIONAL CERTIFICATION STATEMENT12
12/13/2019123888944Open ↗
09/26/2019123818020Open ↗
08/21/2017123115627Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
12/13/2019123888944Open ↗
09/26/2019123818020Open ↗
02/27/2018140517046Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/02/2026M00259278-P1Open ↗
09/01/2026M00259278-P4Open ↗
09/01/2026M01040334-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
09/05/2026M00259278-P1Open ↗
09/05/2026M00259278-P2Open ↗
09/05/2026M00259278-P4Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026M01040334-I1Open ↗
09/01/2026M01040334-I1Open ↗
09/01/2026M01040334-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY7
04/24/2017140632554Open ↗
11/22/2016140578186Open ↗
08/23/2016140539264Open ↗
Showing 3 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION7
04/24/2017140632554Open ↗
11/22/2016140578186Open ↗
08/23/2016140539264Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
12/13/2019123888944Open ↗
09/26/2019123818020Open ↗
08/21/2017123115627Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
07/21/2014121950219Open ↗
▸Trade Schedules & Equipment10
▸BISSELF-CERT PLUMBING NOTICE4
09/29/2014121950228Open ↗
06/05/2014121773704Open ↗
04/07/2014121773704Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING3
11/22/2016140578186Open ↗
06/07/2016140505380Open ↗
10/12/2013121773704Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
03/31/2014121950228Open ↗
03/27/2014121773704Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
10/20/2015121773704Open ↗
▸Safety & Tenant Protection12
▸BISTENANT PROTECTION PLAN AND NOTES8
04/24/2017140632554Open ↗
11/22/2016140578186Open ↗
08/23/2016140539264Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWTenant Protection Plan4
08/13/2026M00259278-P4Open ↗
08/13/2026M00259278-P2Open ↗
08/13/2026M00259278-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos17
▸BISASBESTOS: CERTIFICATION (DEP ACP5)9
12/13/2019123888944Open ↗
09/26/2019123818020Open ↗
06/02/2017140632554Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/05/2026M00259278-I1Open ↗
09/05/2026M00259278-P1Open ↗
09/05/2026M00259278-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/21/2026M01040334-I1Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
12/13/2019123888944Open ↗
09/26/2019123818020Open ↗
06/02/2017140632554Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
04/24/2017140632554Open ↗
11/22/2016140578186Open ↗
07/07/2016140518580Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
11/22/2016140578186Open ↗
07/07/2016140518580Open ↗
06/07/2016140505380Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/17/2017140518580Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
10/22/2015140419820Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY7
04/24/2017140632554Open ↗
11/22/2016140578186Open ↗
08/23/2016140539264Open ↗
Showing 3 of 7 on file for this type
▸Approvals, Objections & Sign-offs6
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
02/27/2018140517046Open ↗
05/23/2017140419820Open ↗
03/17/2017140518580Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION3
02/27/2018140517046Open ↗
02/08/2018123115627Open ↗
02/08/2018123115627Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT11
12/13/2019123888944Open ↗
09/26/2019123818020Open ↗
04/24/2017140632554Open ↗
Showing 3 of 11 on file for this type
▸Filing & Intake Forms21
▸BISADDITIONAL INFORMATION8
11/16/2017123115627Open ↗
06/13/2017140632554Open ↗
06/02/2017140632554Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
04/24/2017140632554Open ↗
11/22/2016140578186Open ↗
08/23/2016140539264Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET5
12/13/2019123888944Open ↗
09/26/2019123818020Open ↗
07/21/2014121950219Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM1
02/27/2018140517046Open ↗
▸Other Documents7
▸DOB NOWCalculations3
08/14/2026M01087807-I1Open ↗
08/13/2026M01087807-P1Open ↗
08/13/2026M01087807-P2Open ↗
▸DOB NOWManufacturer's Specifications3
08/14/2026M01087807-P1Open ↗
08/14/2026M01087807-I1Open ↗
08/13/2026M01087807-P2Open ↗
▸BISTENANT/OCCUPANT PROTECTION PLAN 2008 CODE1
10/22/2015140419820Open ↗