← Back
Walk-up apt, over six families with stores
51 WEST 8 STREET
MANHATTAN · BIN 1009448
💬 Discuss this project
1877Year Built
5Stories
C7Building Class
C4-5Zoning
9,490 sfGross Floor Area
17Units
Rent Stabilized21 Open Violations ▸
Walk-up apt, over six families with stores · 2,348 sf lot · 4.04 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction9p · 1 filing · 20 docs
Floor 5Under Construction2p · 1 filing · 4 docs
Floor 4Under Construction2p · 1 filing · 4 docs
Floor 3Under Construction2p · 1 filing · 4 docs
Floor 2Under Construction2p · 1 filing · 4 docs
Floor 1Under Construction18p · 2 filings · 20 docs
CellarUnder Construction7p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SANDY REALTY C/O STEELY203/22/2026
BUILD ALL CONSTRUCTION103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/07/2025$3.7M—51 WEST 8TH LLC → Private party$394/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHK PLUS INC207/29/2026
HALO ARCHITECTURE PLLC306/14/2026
DMYTRO CHORNOBRYVETS ARCHITECT,PLLC404/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
OPC MANAGEMENT INCGeneral Contractor507/08/2026
UNIVERSAL CONSTRUCTIONGeneral Contractor509/13/2026
AMM GEN'L CONTRACTING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CHK PLUS INC.9667107/29/2026
GREAT WALL CONSULTANT P.E5633207/29/2026
HALO ARCHITECTURE PLLC8021306/14/2026
A&B WORLD CONSULTING, INC5704304/21/2026
Building Lifecycle
All (122)Filed (9)Permit Issued (9)Signed Off (1)Violation (60)Inspection (4)Objection (10)Special Inspection (29)
09/11/2026
Permit issued — Structural
M01396133-S4-ST
09/04/2026
Violation issued (HPD, open)
C
09/04/2026
Violation issued (HPD, open)
B
09/03/2026
Permit issued — Mechanical Systems
M01396133-S3-MS
09/01/2026
Objection resolved — Addressed
09/01/2026
Objection resolved — Addressed
09/01/2026
Objection resolved — Addressed
08/24/2026
Violation issued (HPD, open)
A
08/24/2026
Violation issued (HPD, open)
B
08/24/2026
Violation issued (HPD, open)
B
08/24/2026
Violation issued (HPD, open)
C
08/24/2026
Violation issued (HPD, open)
B
08/24/2026
Violation issued (HPD, open)
B
08/24/2026
Violation issued (HPD, open)
B
08/24/2026
Violation issued (HPD, open)
B
08/20/2026
Objection resolved — Resolved
08/20/2026
Objection resolved — Resolved
08/17/2026
Objection raised — Other
08/17/2026
Objection raised — Other
08/17/2026
Objection raised — Other
08/17/2026
Objection raised — Other
08/17/2026
Objection raised — Other
07/31/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/29/2026
Filed — Alteration
Propose plumbing work for existing eating and drinking establishment on cellar and 1st floor of mixed use building as per plan. No change in use, egress, or occupancy.
M01396133-S3
07/29/2026
Filed — Alteration
Propose plumbing work for existing eating and drinking establishment on cellar and 1st floor of mixed use building as per plan. No change in use, egress, or occupancy.
M01396133-S4
07/28/2026
Special inspection requirement — Masonry
07/28/2026
Special inspection requirement — Post-installed anchors in masonry
07/28/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/28/2026
Special inspection requirement — Concrete - Cast-In-Place
07/28/2026
Special inspection requirement — Structural Steel - Details
07/28/2026
Special inspection requirement — Structural Steel - High Strength Bolting
07/28/2026
Special inspection requirement — Structural Steel - Welding
07/16/2026
Special inspection requirement — Final
07/14/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/06/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/29/2026
Violation issued (ECB, closed)
Signs
06/24/2026
Violation issued (HPD, closed)
C
06/22/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/15/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/15/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Hanli Liu
06/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hanli Liu
06/14/2026
Filed — Alteration
Propose plumbing work for existing eating and drinking establishment on cellar and 1st floor of mixed use building as per plan. No change in use, egress, or occupancy.
M01396133-P1
06/11/2026
Permit issued — General Construction
M01235093-I1-GC
06/11/2026
Permit issued — Construction Fence
M01235093-S1-FN
06/05/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Hanli Liu
06/05/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hanli Liu
05/28/2026
Signed off — Alteration
Interior work to clean up the space and remove finishes to prepare white box for potential new tenant. Restore fire rated construction, level floors and repair existing construction as required. No change in Use, Occupancy and Egress.
M01218787-I1
05/14/2026
Permit issued — General Construction
M01396133-I1-GC
05/14/2026
Permit issued — Plumbing
M01396133-S1-PL
05/07/2026
Filed — Alteration
Propose plumbing work for existing eating and drinking establishment on cellar and 1st floor of mixed use building as per plan. No change in use, egress, or occupancy.
M01396133-I1
05/07/2026
Filed — Alteration
Propose plumbing work for existing eating and drinking establishment on cellar and 1st floor of mixed use building as per plan. No change in use, egress, or occupancy.
M01396133-S1
05/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hanli Liu
05/03/2026
Special inspection requirement — Lighting controls
Hanli Liu
05/03/2026
Special inspection requirement — Interior lighting power
Hanli Liu
05/03/2026
Special inspection requirement — Energy Code Compliance Inspections
Hanli Liu
05/01/2026
Special inspection requirement — Tenant Protection Plan Compliance
Xiong Wei Wu
04/27/2026
Special inspection requirement — Final
DMYTRO CHORNOBRYVETS
04/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Bomstein
04/27/2026
Special inspection requirement — Tenant Protection Plan Compliance
Alexander Bomstein
Latest 60 of 122 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedUNIVERSAL CONSTRUCTION09/11/2026
DOB NOWMechanical SystemsPermit IssuedUNIVERSAL CONSTRUCTION09/03/2026
DOB NOWGeneral ConstructionPermit IssuedUNIVERSAL CONSTRUCTION06/11/2026
DOB NOWConstruction FencePermit IssuedUNIVERSAL CONSTRUCTION06/11/2026
DOB NOWGeneral ConstructionPermit IssuedUNIVERSAL CONSTRUCTION05/14/2026
DOB NOWPlumbingPermit IssuedAMM GEN'L CONTRACTING INC05/14/2026
DOB NOWGeneral ConstructionPermit IssuedOPC MANAGEMENT INC01/28/2026
DOB NOWConstruction FencePermit IssuedOPC MANAGEMENT INC01/15/2026
DOB NOWGeneral ConstructionSigned-offOPC MANAGEMENT INC12/01/2025
1 project · most recent 07/29/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/29/2026Permit IssuedUNIVERSAL CONSTRUCTIONHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Gree GMV-ND24TN-HDT(U) 24,000 BTU · Vrf Outdoor ×2
GMV-ND18G/NHA1-C/T(U) 18,000 BTU · Vrf Outdoor ×1
GMV-V60WL/NHC-T(U) 124,500 BTU · Vrf Outdoor ×1
— GMV-V60WL/NHC-T(U) 102,000 BTU ×1
__Junk__ GMV-ND24TN-HDT(U) 24,000 BTU · Vrf Outdoor ×1
Ventilation
Greenheck BSQ-180-5X-QD-DR1 2,100 CFM · Makeup Air ×1
CUBE-140-LMD122GQD 3,000 CFM · Exhaust Fan ×1
SQ-90-VG1X-QD 400 CFM · Exhaust Fan ×1
1 project · most recent 07/29/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/29/2026Permit IssuedAMM GEN'L CONTRACTING INCGas, Water/Sanitary
2 projects · most recent 06/05/2026
General Wiring
FiledStatusContractorScope
06/05/2026Permit IssuedR & T ELECTRICAL CORPGeneral Wiring
10/25/2024CompleteAMERICAN ENG ELECL SVCS I—
1 project · most recent 07/29/2026
Steel Masonry
FiledStatusContractorScope
07/29/2026Permit IssuedUNIVERSAL CONSTRUCTIONSteel, Masonry
1 project · most recent 01/12/2026
Fence
FiledStatusContractorScope
01/12/2026Permit IssuedUNIVERSAL CONSTRUCTIONFence
1 project · most recent 04/21/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
04/21/2026Signed-offOPC MANAGEMENT INCTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
07/31/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/14/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/06/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/22/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
07/28/2026Masonry—special
07/28/2026Post-installed anchors in masonry—special
07/28/2026Tenant Protection Plan Compliance—special
07/28/2026Concrete - Cast-In-Place—special
07/28/2026Structural Steel - Details—special
07/28/2026Structural Steel - High Strength Bolting—special
07/28/2026Structural Steel - Welding—special
07/16/2026Final—progress
06/15/2026Tenant Protection Plan Compliance—special
06/15/2026HVAC-R and service water piping design and insulationHanli Liuenergy_progress
06/15/2026Fire-Resistant Penetrations and JointsHanli Liuspecial
06/05/2026HVAC-R and service water piping design and insulationHanli Liuenergy_progress
06/05/2026Tenant Protection Plan Compliance—special
06/05/2026Fire-Resistant Penetrations and JointsHanli Liuspecial
05/03/2026Fire-Resistant Penetrations and JointsHanli Liuspecial
05/03/2026Lighting controlsHanli Liuenergy_progress
05/03/2026Interior lighting powerHanli Liuenergy_progress
05/03/2026Energy Code Compliance InspectionsHanli Liuprogress
05/01/2026Tenant Protection Plan ComplianceXiong Wei Wuspecial
04/27/2026FinalDMYTRO CHORNOBRYVETSprogress
04/27/2026Fire-Resistant Penetrations and JointsAlexander Bomsteinspecial
04/27/2026Tenant Protection Plan ComplianceAlexander Bomsteinspecial
04/27/2026Fire-Resistance Rated ConstructionAlexander Bomsteinprogress
06/02/2025FinalDMYTRO CHORNOBRYVETSprogress
06/02/2025Fenestration areasDMYTRO CHORNOBRYVETSenergy_progress
Latest 25 of 29.
▾Documents — 50 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/20/2026M01235093-S1Request digital key ↗
08/20/2026M01235093-I1Request digital key ↗
08/17/2026M01218787-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits8
▸DOB NOWLPC Approval/Permit8
08/17/2026M01218787-P1Open ↗
08/17/2026M01396133-S1Open ↗
08/17/2026M01396133-I1Open ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications25
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/20/2026M01235093-I1Open ↗
08/20/2026M01235093-S1Open ↗
08/17/2026M01218787-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
08/29/2026M01396133-I1Open ↗
08/29/2026M01396133-I1Open ↗
08/29/2026M01396133-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
08/29/2026M01396133-I1Open ↗
08/29/2026M01396133-I1Open ↗
08/28/2026M01235093-I1Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/20/2026M01235093-I1Open ↗
08/17/2026M01218787-P1Open ↗
08/17/2026M01396133-S1Open ↗
Showing 3 of 8 on file for this type