← Back
Elevator apt, semi-fireproof with stores
510 BROOK AVENUE
BRONX · Mott Haven-Port Morris · BIN 2130748
💬 Discuss this project
2022Year Built
6Stories
D7Building Class
R6Zoning
16,933 sfGross Floor Area
23Units
Rent Stabilized1 Open Violation ▸
Elevator apt, semi-fireproof with stores · Owner of record: HARRISON1 AVE LLC · 4,825 sf lot · 3.51 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Roof72p · 1 filing · 20 docs
Floor 675p · 1 filing · 20 docs
Floor 582p · 1 filing · 20 docs
Floor 482p · 1 filing · 20 docs
Floor 383p · 1 filing · 20 docs
Floor 274p · 1 filing · 20 docs
Floor 196p · 1 filing · 20 docs
Cellar56p · 1 filing · 20 docs
Site & exterior112p · 4 filings · 20 docs
Filed — no permit issued1p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LEVIATHAN CAPITAL2107/08/2026
LEVIATHAN DEVELOPMENT707/08/2026
LEVIATHAN603/22/2026
DANIEL GROUP407/08/2026
HARRISON1 AVE LLC303/22/2026
GLOBAL MANAGEMENT103/22/2026
SOBRO103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARC ARCHITECTURE + DESIGN STUDIO801/29/2024
SIDERIS KEFALAS ENGINEERS PC501/08/2024
JOEL PHAGOO P.E. PLLC312/21/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARC ARCHITECTURE + DESIGN STUDIO703/21/2026
A1 EXPEDITING SERVICE603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GLOBAL MANAGEMENT LLCGeneral Contractor1707/08/2026
PRIME PIPING & HEATING INPlumbing307/08/2026
AKM CONSTRUCTION NY CORPGeneral Contractor207/08/2026
AURA PLUMBING INCPlumbing207/08/2026
ARC ARCHITECTURE + DESIGN STUDIOGeneral Contractor103/22/2026
TRUE POWER ELECL CONT LLCElectrical103/22/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
HIGH QUALITY ELECTRIC OFElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CENTURY TESTING & CONSULT4081901/29/2024
JOEL PHAGOO ,PE, PLLC2416212/21/2022
Building Lifecycle
All (157)Filed (16)Permit Issued (16)Signed Off (8)Violation (20)Inspection (11)Objection (56)Special Inspection (30)
06/13/2025
Violation issued (HPD, closed)
A
11/22/2024
Violation issued (HPD, closed)
I
04/17/2024
Violation issued (HPD, closed)
A
02/29/2024
Signed off — New Building
PROPOSED NEW 6 STORY R-2, RESIDENTIAL BUILDING WITH 21 DWELLING UNITS AND GROUND FLOOR COMMUNITY FACILITY
X00679142-S3
02/27/2024
Signed off — New Building
PROPOSED NEW 6 STORY R-2, RESIDENTIAL BUILDING WITH 21 DWELLING UNITS AND GROUND FLOOR COMMUNITY FACILITY
X00679142-S6
02/22/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
02/15/2024
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
02/08/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/05/2024
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
01/30/2024
Special inspection requirement — Maintenance information
ALDO BRAVO
01/30/2024
Special inspection requirement — Fire-Resistance Rated Construction
ALDO BRAVO
01/30/2024
Special inspection requirement — Permanent certificate
ALDO BRAVO
01/30/2024
Special inspection requirement — Interior lighting power
ALDO BRAVO
01/30/2024
Special inspection requirement — Fenestration air leakage
ALDO BRAVO
01/30/2024
Special inspection requirement — Energy Code Compliance Inspections
ALDO BRAVO
01/30/2024
Special inspection requirement — Metering
ALDO BRAVO
01/30/2024
Special inspection requirement — Air barrier — testing
ALDO BRAVO
01/30/2024
Special inspection requirement — Lighting controls
ALDO BRAVO
01/30/2024
Special inspection requirement — Exterior lighting power
ALDO BRAVO
01/30/2024
Special inspection requirement — Protection of exposed foundation insulation
ALDO BRAVO
01/30/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
ALDO BRAVO
01/30/2024
Special inspection requirement — Lighting in dwelling units
ALDO BRAVO
01/30/2024
Special inspection requirement — Insulation placement and R values
ALDO BRAVO
01/30/2024
Special inspection requirement — Fenestration areas
ALDO BRAVO
01/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALDO BRAVO
01/30/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
ALDO BRAVO
01/29/2024
Filed — New Building
PROPOSED NEW 6 STORY R-2, RESIDENTIAL BUILDING WITH 21 DWELLING UNITS AND GROUND FLOOR COMMUNITY FACILITY
X00679142-P6
01/29/2024
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
01/29/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
ALDO BRAVO
01/29/2024
Special inspection requirement — Permanent certificate
ALDO BRAVO
01/29/2024
Special inspection requirement — Exterior lighting power
ALDO BRAVO
01/29/2024
Special inspection requirement — Interior lighting power
ALDO BRAVO
01/29/2024
Special inspection requirement — Insulation placement and R values
ALDO BRAVO
01/29/2024
Special inspection requirement — Lighting controls
ALDO BRAVO
01/29/2024
Special inspection requirement — Protection of exposed foundation insulation
ALDO BRAVO
01/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALDO BRAVO
01/29/2024
Special inspection requirement — Energy Code Compliance Inspections
ALDO BRAVO
01/29/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
ALDO BRAVO
01/29/2024
Special inspection requirement — Fire-Resistance Rated Construction
ALDO BRAVO
01/29/2024
Special inspection requirement — Maintenance information
ALDO BRAVO
01/29/2024
Special inspection requirement — Fenestration air leakage
ALDO BRAVO
01/22/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
01/08/2024
Filed — New Building
PROPOSED NEW 6 STORY R-2, RESIDENTIAL BUILDING WITH 21 DWELLING UNITS AND GROUND FLOOR COMMUNITY FACILITY
X00679142-P5
01/08/2024
Signed off — Alteration
APPLICATION TO PERMIT THE EARTHWORKS (EXCAVATION) AND ERECTION OF FOOTING AND FOUNDATION COMPONENTS OF AN NB-APPLICATION TO BE FILED UNDER THIS BIN NUMBER
X00661707-I1
12/26/2023
Signed off — New Building
PROPOSED NEW 6 STORY R-2, RESIDENTIAL BUILDING WITH 21 DWELLING UNITS AND GROUND FLOOR COMMUNITY FACILITY
X00679142-S1
12/21/2023
Permit issued — Sprinklers
X00679142-S3-PL
12/20/2023
Signed off — New Building
PROPOSED NEW 6 STORY R-2, RESIDENTIAL BUILDING WITH 21 DWELLING UNITS AND GROUND FLOOR COMMUNITY FACILITY
X00679142-S2
12/20/2023
Permit issued — Sprinklers
X00679142-S3-PL
12/12/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/08/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/04/2023
Permit issued — Sprinklers
X00679142-S3-EW-SP
09/18/2023
Signed off — New Building
PROPOSED NEW 6 STORY R-2, RESIDENTIAL BUILDING WITH 21 DWELLING UNITS AND GROUND FLOOR COMMUNITY FACILITY
X00679142-S5
09/13/2023
Permit issued — Curb Cut
X00679142-S6-CC
09/13/2023
Permit issued — Structural
X00679142-S1-ST
09/06/2023
Permit issued — Mechanical Systems
X00679142-S2-MS
08/02/2023
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X07994085-I1
07/26/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X08046637-I1
07/26/2023
Permit issued — Plumbing
X00679142-S3-PL
07/24/2023
Permit issued — Construction Fence
X00679142-S5-FN
07/17/2023
Violation issued (ECB, closed)
Construction
Latest 60 of 157 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offPRIME PIPING & HEATING IN12/21/2023
DOB NOWSprinklersSigned-offPRIME PIPING & HEATING IN12/20/2023
DOB NOWSprinklersSigned-offA M B MECHANICAL INC12/04/2023
DOB NOWCurb CutSigned-offGLOBAL MANAGEMENT LLC09/13/2023
DOB NOWStructuralSigned-offGLOBAL MANAGEMENT LLC09/13/2023
DOB NOWMechanical SystemsSigned-offGLOBAL MANAGEMENT LLC09/06/2023
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN07/26/2023
DOB NOWConstruction FenceSigned-offGLOBAL MANAGEMENT LLC07/24/2023
DOB NOWGeneral ConstructionPermit IssuedGLOBAL MANAGEMENT LLC03/29/2023
DOB NOWSupported ScaffoldSigned-offAKM CONSTRUCTION NY12/01/2022
DOB NOWSidewalk ShedSigned-offAKM CONSTRUCTION NY09/02/2022
DOB NOWPlumbingSigned-offAURA PLUMBING INC08/24/2022
DOB NOWSprinklersSigned-offAURA PLUMBING INC08/23/2022
DOB NOWGeneral ConstructionPermit IssuedGLOBAL MANAGEMENT LLC06/15/2022
DOB NOWConstruction FenceSigned-offGLOBAL MANAGEMENT LLC05/28/2022
DOB NOWFoundationSigned-offGLOBAL MANAGEMENT LLC05/06/2022
1 project · most recent 01/29/2024
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/29/2024Signed-offGLOBAL MANAGEMENT LLCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Lg LSU180HSV5 180,002 BTU · Heat Pump Outdoor ×1
Ventilation
Greenheck Greenheck model RV-10-0-1-F1 1,300 CFM · Exhaust Fan ×1
1 project · most recent 01/29/2024
Sprinkler System
FiledStatusContractorScope
01/29/2024Signed-offPRIME PIPING & HEATING INSprinkler System
1 project · most recent 01/29/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
01/29/2024Signed-offA M B MECHANICAL INCGas, Storm, Water/Sanitary
3 projects · most recent 01/17/2024
General Wiring
FiledStatusContractorScope
01/17/2024CompleteTRUE POWER ELECL CONT LLCGeneral Wiring
12/05/2022CompleteJAM ELECTRICAL CORP—
08/26/2022CompleteHIGH QUALITY ELECTRIC OF—
2 projects · most recent 01/29/2024
Fence
FiledStatusContractorScope
01/29/2024Signed-offA M B MECHANICAL INCFence
05/27/2022——Fence
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
02/22/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
02/15/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
02/08/2024Pass-Final CND-Occupancy InspectionPassView ↗
02/05/2024Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
01/29/2024Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
01/22/2024Fail-Final CND-Occupancy InspectionFailView ↗
12/12/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/08/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/13/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/28/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/06/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 62
DateRequirementInspectorRole
01/30/2024Exterior Insulation and Finish Systems (EIFS)ALDO BRAVOspecial
01/30/2024Lighting controlsALDO BRAVOenergy_progress
01/30/2024MeteringALDO BRAVOenergy_progress
01/30/2024Fenestration areasALDO BRAVOenergy_progress
01/30/2024Air barrier — testing ALDO BRAVOenergy_progress
01/30/2024Permanent certificateALDO BRAVOenergy_progress
01/30/2024Exterior lighting powerALDO BRAVOenergy_progress
01/30/2024Interior lighting powerALDO BRAVOenergy_progress
01/30/2024Maintenance informationALDO BRAVOenergy_progress
01/30/2024Protection of exposed foundation insulationALDO BRAVOenergy_progress
01/30/2024Fenestration and door U-factor and product ratingsALDO BRAVOenergy_progress
01/30/2024Fenestration air leakageALDO BRAVOenergy_progress
01/30/2024Lighting in dwelling unitsALDO BRAVOenergy_progress
01/30/2024Insulation placement and R valuesALDO BRAVOenergy_progress
01/30/2024Energy Code Compliance InspectionsALDO BRAVOprogress
01/30/2024Fire-Resistance Rated ConstructionALDO BRAVOprogress
01/30/2024Fire-Resistant Penetrations and JointsALDO BRAVOspecial
01/29/2024Exterior lighting powerALDO BRAVOenergy_progress
01/29/2024Exterior Insulation and Finish Systems (EIFS)ALDO BRAVOspecial
01/29/2024Fire-Resistant Penetrations and JointsALDO BRAVOspecial
01/29/2024Energy Code Compliance InspectionsALDO BRAVOprogress
01/29/2024Fire-Resistance Rated ConstructionALDO BRAVOprogress
01/29/2024Insulation placement and R valuesALDO BRAVOenergy_progress
01/29/2024Interior lighting powerALDO BRAVOenergy_progress
01/29/2024Lighting controlsALDO BRAVOenergy_progress
Latest 25 of 62.
▾Documents — 161 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/24/2026X00746412-I1Request digital key ↗
08/24/2026X07994085-I1Request digital key ↗
08/23/2026X00679142-S6Request digital key ↗
Showing 3 of 16 on file for this type
▸Applications & Permits11
▸BISPLAN / WORK APPROVAL APPLICATION10
12/22/2023240317741Open ↗
10/11/2023240317741Open ↗
10/05/2023240317741Open ↗
Showing 3 of 10 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
07/08/2022240317741Open ↗
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZoning Exhibit form (1-5)3
08/14/2026X00679142-P1Open ↗
08/14/2026X00679142-I1Open ↗
08/13/2026X00679142-P6Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
07/08/2022240317741Open ↗
04/17/2009220002306Open ↗
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026X00679142-P6Open ↗
08/13/2026X00679142-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00679142-I1Open ↗
▸Seals & Professional Certifications80
▸DOB NOWProgress Inspector Seal & Signature47
09/01/2026X00661707-I1Open ↗
09/01/2026X00661707-I1Open ↗
08/27/2026X00679142-P3Open ↗
Showing 3 of 47 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/24/2026X07994085-I1Open ↗
08/23/2026X00679142-S2Open ↗
08/23/2026X00679142-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/01/2026X08046637-I1Open ↗
09/01/2026X00661707-I1Open ↗
09/01/2026X00661707-I1Open ↗
Showing 3 of 15 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
07/07/2022240317741Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
04/17/2009220002306Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/14/2026X00679142-P1Open ↗
08/14/2026X00679142-I1Open ↗
08/13/2026X00679142-P6Open ↗
▸Safety & Tenant Protection11
▸BISSTREET TREE CHECKLIST3
07/08/2022240317741Open ↗
01/17/2020220002306Open ↗
04/17/2009220002306Open ↗
▸DOB NOWStreet Tree Checklist3
08/14/2026X00679142-P1Open ↗
08/14/2026X00679142-I1Open ↗
08/13/2026X00679142-P6Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
07/08/2022240317741Open ↗
▸BISBPP: STREET TREES SITE PLAN1
07/08/2022240317741Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X00679142-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026X00679142-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X00679142-I1Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
04/17/2009220002306Open ↗
▸Energy Compliance3
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026X00679142-S2Open ↗
08/13/2026X00679142-S3Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026X00679142-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026X00661707-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026X00661707-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026X00661707-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸BISSCHEDULE A - OCCUPANCY / USE2
01/17/2020220002306Open ↗
04/17/2009220002306Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
04/17/2009220002306Open ↗
▸Filing & Intake Forms4
▸BISEFILING JOB APPLICATION COVER SHEET1
04/19/2022240317741Open ↗
▸BISADDITIONAL INFORMATION1
03/06/2024240317741Open ↗
▸BISBOROUGH INTAKE FORM1
01/17/2020220002306Open ↗
▸BISEFILING COVER SHEET1
04/17/2009220002306Open ↗
▸Other Documents18
▸DOB NOWProperty Ownership Certification8
08/23/2026X00679142-P2Open ↗
08/15/2026X00679142-S2Open ↗
08/14/2026X00679142-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSite Survey: Initial3
08/14/2026X00679142-P1Open ↗
08/14/2026X00679142-I1Open ↗
08/13/2026X00679142-P6Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/14/2026X00679142-P1Open ↗
08/13/2026X00679142-I1Open ↗
08/13/2026X00679142-P6Open ↗
▸BISPLOT DIAGRAM1
04/17/2009220002306Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026X00679142-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026X00679142-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026X00661707-I1Open ↗