← Back
Walk-up apt, over six families with stores
510 EAST 12 STREET
MANHATTAN · East Village · BIN 1005170
💬 Discuss this project
1920Year Built
5Stories
C7Building Class
R8BZoning
10,090 sfGross Floor Area
22Units
Rent Stabilized3 Open Violations ▸
Walk-up apt, over six families with stores · Owner of record: EVP 510 EAST 12TH ST LLC · 2,581 sf lot · 3.91 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 42p · 2 filings · 20 docs
Floor 34p · 3 filings · 20 docs
Floor 26p · 4 filings · 20 docs
Floor 1
Cellar1p · 1 filing · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SILVERSTONE PROPERTY GROUP5707/08/2026
EVP 510 EAST 12TH ST LLC603/22/2026
C/O MADISON REALTY CAPITA203/22/2026
EUP 510 EAST 12TH ST LLC103/22/2026
510 EAST 12 STREET LLC203/22/2026
METRO CONTRACTING INC303/21/2026
AJT MANAGEMENT103/21/2026
228 E 6TH STREET503/21/2026
514 EAST12TH STREET303/21/2026
TABAK REALTY2103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/23/2021$9.9M—510 EAST 12TH STREET LLC → EVP 510 EAST 12TH ST LLC$983/sf building
09/10/2015$5.2M—TABAK REALTY, L.L.C. → 510 EAST 12TH STREET LLC$515/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
UNFOLD ARCHITECT, PC2105/26/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HTX BUILDING CONSULTING2103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KG MANAGEMENT CNSLTNG INCGeneral Contractor603/21/2026
PIPESTYLISTS, INCPlumbing307/08/2026
FERRARO, STEVENElectrical103/21/2026
SYED-NAQVI ALTAFElectrical103/21/2026
SYED-NAQVI, ALTAFElectrical103/21/2026
TAKOS, VASILIOS BILLYElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
UNFOLD ARCHITECT77072105/26/2022
Building Lifecycle
All (141)Filed (21)Permit Issued (6)Signed Off (6)Violation (60)Inspection (12)Objection (6)Special Inspection (30)
10/25/2025
Violation issued (HPD, open)
A
10/25/2025
Violation issued (HPD, open)
A
10/25/2025
Violation issued (HPD, closed)
B
10/25/2025
Violation issued (HPD, closed)
B
05/22/2024
Violation issued (ECB, open)
Construction
02/15/2024
Violation issued (ECB, closed)
Construction
01/19/2024
Signed off — Alteration
FILE ALTERATION TYPE 2 PLUMBING JOB ATAPARTMENT UNIT 11 AND 15 ACCORDING TO PLAN, NO CHANGE OF USE, EGRESS, OR OCCUPANCY
M00527319-I1
12/14/2023
Violation issued (ECB, closed)
Construction
07/21/2022
Violation issued (HPD, closed)
C
07/21/2022
Violation issued (HPD, closed)
C
07/01/2022
Signed off — Alteration
FILE ALTERATION TYPE 2 TO RENOVATE EXISTING APARTMENTS OF UNIT 6 AND UNIT10, COMBINGING TWO UNITS ACCORDING TO PLAN, NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
M00520260-I1
06/08/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/08/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/31/2022
Objection resolved — Addressed
05/26/2022
Filed — Alteration
FILE ALTERATION TYPE 2 PLUMBING JOB ATAPARTMENT UNIT 11 AND 15 ACCORDING TO PLAN, NO CHANGE OF USE, EGRESS, OR OCCUPANCY
M00527319-P5
05/26/2022
Objection raised — Scope
05/05/2022
Signed off — Alteration
FILE ALTERATION TYPE 2 PLUMBING JOB ATAPARTMENT UNIT 3 AND 7 ACCORDING TO PLAN, NO CHANGE OF USE, EGRESS, OR OCCUPANCY
M00527316-I1
05/05/2022
Signed off — Alteration
FILE ALTERATION TYPE 2 TO RENOVATE EXISTING APARTMENTS OF UNIT 11 AND UNIT 15, COMBINGING TWO UNITS ACCORDING TO PLAN, NO CHANGE OF USE, EGRESS, OR OCCUPANCY,
M00520267-I1
05/05/2022
Signed off — Alteration
FILE ALTERATION TYPE 2 PLUMBING JOB AT APARTMENT UNIT 6 AND 10 ACCORDING TO PLAN, NO CHANGE OF USE, EGRESS, OR OCCUPANCY
M00527312-I1
05/05/2022
Signed off — Alteration
M00520245-I1
04/08/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/08/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/04/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/30/2022
Special inspection requirement — Energy Code Compliance Inspections
JINHO KIM
03/30/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
JINHO KIM
03/30/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
JINHO KIM
03/25/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/23/2022
Filed — Alteration
FILE ALTERATION TYPE 2 PLUMBING JOB ATAPARTMENT UNIT 3 AND 7 ACCORDING TO PLAN, NO CHANGE OF USE, EGRESS, OR OCCUPANCY
M00527316-P3
03/23/2022
Filed — Alteration
FILE ALTERATION TYPE 2 PLUMBING JOB ATAPARTMENT UNIT 11 AND 15 ACCORDING TO PLAN, NO CHANGE OF USE, EGRESS, OR OCCUPANCY
M00527319-P4
03/23/2022
Filed — Alteration
FILE ALTERATION TYPE 2 PLUMBING JOB AT APARTMENT UNIT 6 AND 10 ACCORDING TO PLAN, NO CHANGE OF USE, EGRESS, OR OCCUPANCY
M00527312-P4
03/22/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
JINHO KIM
03/22/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
JINHO KIM
03/22/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
JINHO KIM
03/22/2022
Special inspection requirement — Energy Code Compliance Inspections
JINHO KIM
03/22/2022
Special inspection requirement — Energy Code Compliance Inspections
JINHO KIM
03/22/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
JINHO KIM
03/04/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
JINHO KIM
03/04/2022
Special inspection requirement — Lighting in dwelling units
JINHO KIM
03/04/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
JINHO KIM
03/04/2022
Special inspection requirement — Interior lighting power
JINHO KIM
03/03/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
JINHO KIM
03/03/2022
Special inspection requirement — Lighting in dwelling units
JINHO KIM
03/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/01/2022
Filed — Alteration
M00520245-P1
03/01/2022
Filed — Alteration
FILE ALTERATION TYPE 2 PLUMBING JOB AT APARTMENT UNIT 6 AND 10 ACCORDING TO PLAN, NO CHANGE OF USE, EGRESS, OR OCCUPANCY
M00527312-P3
03/01/2022
Filed — Alteration
FILE ALTERATION TYPE 2 PLUMBING JOB ATAPARTMENT UNIT 11 AND 15 ACCORDING TO PLAN, NO CHANGE OF USE, EGRESS, OR OCCUPANCY
M00527319-P3
03/01/2022
Filed — Alteration
FILE ALTERATION TYPE 2 TO RENOVATE EXISTING APARTMENTS OF UNIT 6 AND UNIT10, COMBINGING TWO UNITS ACCORDING TO PLAN, NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
M00520260-P1
03/01/2022
Filed — Alteration
FILE ALTERATION TYPE 2 TO RENOVATE EXISTING APARTMENTS OF UNIT 11 AND UNIT 15, COMBINGING TWO UNITS ACCORDING TO PLAN, NO CHANGE OF USE, EGRESS, OR OCCUPANCY,
M00520267-P1
02/24/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/24/2022
Special inspection requirement — Interior lighting power
JINHO KIM
02/24/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
JINHO KIM
02/24/2022
Special inspection requirement — Energy Code Compliance Inspections
JINHO KIM
02/24/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
JINHO KIM
02/24/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
JINHO KIM
02/24/2022
Special inspection requirement — Energy Code Compliance Inspections
JINHO KIM
02/24/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
JINHO KIM
02/24/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
JINHO KIM
02/16/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/28/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
Latest 60 of 141 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offKG MANAGEMENT CNSLTNG09/03/2021
DOB NOWPlumbingSigned-offT & T PLUMBING INC09/02/2021
DOB NOWPlumbingSigned-offT & T PLUMBING INC09/01/2021
DOB NOWPlumbingSigned-offT & T PLUMBING INC09/01/2021
DOB NOWGeneral ConstructionSigned-offKG MANAGEMENT CNSLTNG08/26/2021
DOB NOWGeneral ConstructionSigned-offKG MANAGEMENT CNSLTNG08/26/2021
BISBLISSUEDLEONARD R SIBRIZZI02/16/2018
BISPLISSUEDGMAK PLMBG AND HEATNG LLC02/16/2018
BISOTISSUEDCDP GENERAL CONTRACTORS L06/02/2016
BISPLISSUEDALL PRO PLBG & HTG INC05/27/2016
BISOTISSUEDCDP GENERAL CONTRACTORS L04/25/2016
BISPLISSUEDPRECISION PLBG SVCS., INC01/14/2016
BISOTISSUEDCDP GENERAL CONTRACTORS L11/30/2015
BISPLISSUEDATLANTIS PLBG&HTG CORP09/12/2014
BISOTISSUEDA LITTLE OF EVERYTHING CO08/06/2014
BISOTISSUEDFLORENTON RIVER LLC09/10/2013
BISPLISSUEDABSOLUTE PLBG HTG & MECH05/24/2013
BISOTISSUEDA LITTLE OF EVERYTHING CO05/16/2013
BISPLISSUEDABSOLUTE PLBG HTG & MECH04/16/2013
BISOTISSUEDA LITTLE OF EVERYTHING CO04/11/2013
BISOTISSUEDFLORENTON RIVER LLC02/08/2013
BISOTISSUEDJHALLY & JHALLY CONTG COR01/27/2012
BISEQISSUEDJHALLY & JHALLY CONTG COR01/24/2012
BISEQISSUEDMETRO CONTRACTING NY, INC.12/15/2011
BISOTISSUEDJHALLY & JHALLY CONTG COR05/06/2011
BISOTISSUEDA LITTLE OF EVERYTHING CO07/21/2010
BISOTISSUEDMORTON TABAK & CO04/16/2007
BISOTISSUEDMORTON TABAK & CO.09/21/2005
BISOTISSUEDMORTON TABAK @ CO06/23/2005
BISOTISSUEDMORTON TABAK CO02/16/2005
BISPLISSUEDARIANA CONTRACTING INC03/04/1999
BISOTISSUEDTABAK REALTY02/17/1999
BISOTISSUEDN/A04/02/1996
BISOTISSUEDN/A02/01/1996
3 projects · most recent 03/07/2022
General Wiring Boiler Controls
FiledStatusContractorScope
03/07/2022CompleteE & M ELECTRICAL NY CORPGeneral Wiring
10/04/2018CompleteBLZ ELECTRIC INC.Boiler Controls
01/24/2018Permit IssuedGOTHAM WIRING LICENSEDGeneral Wiring
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
06/08/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/08/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/08/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/08/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/04/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/25/2022Pass-Final General Construction Non-Directive 14PassView ↗
02/24/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/28/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/27/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/21/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/15/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/14/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
03/30/2022Energy Code Compliance InspectionsJINHO KIMprogress
03/30/2022HVAC-R and service water piping design and insulationJINHO KIMenergy_progress
03/30/2022Fire-Resistant Penetrations and JointsJINHO KIMspecial
03/22/2022HVAC-R and service water piping design and insulationJINHO KIMenergy_progress
03/22/2022Fire-Resistant Penetrations and JointsJINHO KIMspecial
03/22/2022Fire-Resistant Penetrations and JointsJINHO KIMspecial
03/22/2022Energy Code Compliance InspectionsJINHO KIMprogress
03/22/2022Energy Code Compliance InspectionsJINHO KIMprogress
03/22/2022HVAC-R and service water piping design and insulationJINHO KIMenergy_progress
03/04/2022Fire-Resistant Penetrations and JointsJINHO KIMspecial
03/04/2022Lighting in dwelling unitsJINHO KIMenergy_progress
03/04/2022Fire-Resistant Penetrations and JointsJINHO KIMspecial
03/04/2022Interior lighting powerJINHO KIMenergy_progress
03/03/2022Fire-Resistant Penetrations and JointsJINHO KIMspecial
03/03/2022Lighting in dwelling unitsJINHO KIMenergy_progress
02/24/2022Interior lighting powerJINHO KIMenergy_progress
02/24/2022Fire-Resistant Penetrations and JointsJINHO KIMspecial
02/24/2022Energy Code Compliance InspectionsJINHO KIMprogress
02/24/2022HVAC-R and service water piping design and insulationJINHO KIMenergy_progress
02/24/2022Fire-Resistant Penetrations and JointsJINHO KIMspecial
02/24/2022Energy Code Compliance InspectionsJINHO KIMprogress
02/24/2022HVAC-R and service water piping design and insulationJINHO KIMenergy_progress
02/24/2022Fire-Resistant Penetrations and JointsJINHO KIMspecial
11/01/2021Energy Code Compliance InspectionsJINHO KIMprogress
11/01/2021Fire-Resistant Penetrations and JointsJINHO KIMspecial
Latest 25 of 38.
▾Documents — 316 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch21
09/03/2026M00527312-P3Request digital key ↗
09/03/2026M00527312-P4Request digital key ↗
09/03/2026M00527312-I1Request digital key ↗
Showing 3 of 21 on file for this type
▸Applications & Permits39
▸BISWORK PERMIT APPLICATION21
02/15/2018140740633Open ↗
02/15/2018140740633Open ↗
02/15/2018140740633Open ↗
Showing 3 of 21 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION17
08/23/2018140740633Open ↗
08/22/2018140740633Open ↗
02/15/2018140740633Open ↗
Showing 3 of 17 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
05/20/2015140236126Open ↗
▸Seals & Professional Certifications103
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION24
10/26/2018140740633Open ↗
06/07/2016122678334Open ↗
05/24/2016122678334Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWProgress Inspector Seal & Signature24
09/27/2026M00527312-P3Open ↗
09/27/2026M00527312-P3Open ↗
09/19/2026M00527316-P3Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
09/03/2026M00527312-P2Open ↗
09/03/2026M00527312-P3Open ↗
09/03/2026M00527312-P4Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/27/2026M00527312-P3Open ↗
09/19/2026M00527316-P3Open ↗
09/02/2026M00527319-P2Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
05/20/2013121609385Open ↗
04/11/2013121549440Open ↗
01/30/2012120961977Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
05/20/2013121609385Open ↗
04/11/2013121549440Open ↗
01/30/2012120961977Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
02/15/2018140740633Open ↗
08/05/2014140236126Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
02/15/2018140740633Open ↗
08/05/2014140236126Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
02/15/2018140740633Open ↗
08/05/2014140236126Open ↗
▸Trade Schedules & Equipment16
▸BISSELF-CERT PLUMBING NOTICE5
03/31/2015140236126Open ↗
01/08/2015140236126Open ↗
07/18/2013121549440Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
08/23/2018140740633Open ↗
08/22/2018140740633Open ↗
04/29/2016122676602Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING5
02/15/2018140740633Open ↗
08/05/2014140236126Open ↗
05/20/2013121609385Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
02/15/2018140740633Open ↗
▸Safety & Tenant Protection4
▸BISTenant Protection Plan and Notes3
05/24/2016122678334Open ↗
04/29/2016122676602Open ↗
02/15/2018140740633Open ↗
▸BISSTREET TREE CHECKLIST1
11/30/2012121447149Open ↗
▸Environmental & Asbestos36
▸DOB NOWDEP ACP-5: Asbestos Assessment Report21
09/03/2026M00527312-P2Open ↗
09/03/2026M00527312-P3Open ↗
09/03/2026M00527312-P4Open ↗
Showing 3 of 21 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)12
02/15/2018140740633Open ↗
05/24/2016122678334Open ↗
04/29/2016122676602Open ↗
Showing 3 of 12 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
01/24/2012120957839Open ↗
05/12/2011120686436Open ↗
Showing 2 of 3 on file for this type
▸Energy Compliance30
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS13
10/26/2018140740633Open ↗
06/01/2016122678334Open ↗
04/29/2016122676602Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.6
09/03/2026M00527312-I1Open ↗
09/03/2026M00527319-I1Open ↗
09/02/2026M00520267-I1Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
10/26/2018140740633Open ↗
05/20/2015140236126Open ↗
07/10/2014121447149Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
02/15/2018140740633Open ↗
08/05/2014140236126Open ↗
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
10/26/2018140740633Open ↗
▸BISTR8: Energy Code Progress Inspections1
01/30/2012120961977Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
08/05/2014140236126Open ↗
▸BISTECHNICAL REPORT: ENERGY1
01/24/2012120957839Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
08/05/2014140236126Open ↗
▸Approvals, Objections & Sign-offs16
▸BISADMINISTRATIVE OBJECTIONS8
05/20/2013121609385Open ↗
04/11/2013121549440Open ↗
11/30/2012121447149Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
10/26/2018140740633Open ↗
05/20/2015140236126Open ↗
07/10/2014121447149Open ↗
Showing 3 of 7 on file for this type
▸BISUtility Company PV System Interconnection Acknowledgement Letter1
01/06/2014121447149Open ↗
▸Cost, Insurance & Ownership29
▸BISCOST AFFIDAVIT18
10/26/2018140740633Open ↗
02/15/2018140740633Open ↗
05/24/2016122678334Open ↗
Showing 3 of 18 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT11
04/26/2016122676602Open ↗
12/16/2015122525080Open ↗
05/20/2013121609385Open ↗
Showing 3 of 11 on file for this type
▸Filing & Intake Forms20
▸BISEFILING COVER SHEET10
05/24/2016122678334Open ↗
04/29/2016122676602Open ↗
11/25/2015122525080Open ↗
Showing 3 of 10 on file for this type
▸BISADDITIONAL INFORMATION5
08/22/2018140740633Open ↗
08/22/2018140740633Open ↗
03/13/2015140236126Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
02/15/2018140740633Open ↗
08/05/2014140236126Open ↗
01/30/2012120961977Open ↗
▸BISBOROUGH INTAKE FORM2
10/26/2018140740633Open ↗
08/22/2018140740633Open ↗
▸Other Documents1
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
05/20/2015140236126Open ↗