← Back
Hospital, sanitarium, mental institution
Schwarzman Animal Center
510 EAST 62 STREET · Upper East Side-Lenox Hill-Roosevelt Island · BIN 1046252
💬 Discuss this project
1960Year Built
9Stories
I1Building Class
C8-4Zoning
84,645 sfGross Floor Area
1Units
LL97 Covered11 Open Violations 6 unresolved · 5 paperwork only ▸FISP: SWARMP
Hospital, sanitarium, mental institution · 14,850 sf lot · 5.7 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneralOther
Permit Issued — active, not yet Signed-off
Roof6p · 14 filings
Bulkhead1p · 1 filing · 6 docs
Floor 103 filings · 16 docs
Floor 91p · 5 filings
Floor 86 filings
Floor 7Under Construction2p · 5 filings
Floor 6Under Construction2p · 8 filings
Floor 511 filings
Floor 4Under Construction2p · 7 filings
Floor 37 filings
Floor 22p · 7 filings
Floor 1Under Construction4p · 16 filings
Cellar1 filing · 11 docs
Site & exteriorUnder Construction24 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VIK XS SERVICES1007/08/2026
W&W GLASS, LLC503/22/2026
DEPARTMENT OF ENVIRONMENTAL PROTECTION103/22/2026
AMC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TURNER CONSTRUCTION COMPANYGeneral Contractor8307/08/2026
S&E BRIDGE & SCAFFOLD LLC.General Contractor7607/08/2026
WEST NEW YORK RESTORATION OF CTGeneral Contractor3407/08/2026
PACE PLUMBING CORPFire Protection2007/08/2026
OLYMPIC PLBG & HTG SVC INPlumbing1507/08/2026
FM95 NYScaffold1409/07/2026
VIK XS SERVICES INCGeneral Contractor707/08/2026
PAR FIRE PROTECTION LLCFire Protection407/08/2026
FM95NY LLCGeneral Contractor207/08/2026
NASH ELECTRIC SERVICES INElectrical203/22/2026
W & W GLASS LLCGeneral Contractor203/21/2026
COLBATH, SETHElectrical103/21/2026
STINCHFIELD, GRANTElectrical103/21/2026
RADOS MILOJKOVICElectrical103/21/2026
LION HEART ELECTRIC CORPElectrical103/22/2026
DESENA, MICHAELElectrical103/21/2026
FSG ELECTRIC INCElectrical103/22/2026
SAFWAY ATLANTIC, LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECTONIC ENGINEERING CONS1067406/02/2026
AMM ENGINEERING PC725407/24/2025
CHEN ENGINEERING SERVICES1826507/09/2025
LOMBARDO PROF ENGINEERING8566108/15/2023
Building Lifecycle
All (300)Filed (47)Permit Issued (80)Signed Off (43)Facade (FISP) (14)Violation (14)Inspection (44)Objection (28)Special Inspection (30)
09/11/2026
Signed off — Alteration
INSTALL INDIRECTLY ILLUMINATED WALL SIGN (SCHWARZMAN ANIMAL MEDICAL CENTER)
M00756618-I1
09/11/2026
Signed off — Alteration
M00756724-I1
09/11/2026
Signed off — Alteration
INSTALL INDIRECTLY ILLUMINATED WALL SIGN (SCHWARZMAN ANIMAL MEDICAL CENTER)
M00756746-I1
09/03/2026
Signed off — Alteration
Installation of Beta Max material hoist(s) to be operated within pipe scaffold tower(s) as per plan and in accordance with Chapter 33 of NYC 2014 Building Code. No change in use, egress, or occupancy.
M00727604-I1
08/07/2026
Signed off — Alteration
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION FILED UNDER M00450352 & M00450660, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DOT PERMITS BY OTHERS FOR SHED LEGS ON RDWY.
M00572459-I1
08/07/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER DRAWINGS. FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DOT PERMITS BY OTHERS FOR FENCE INSTALLED ON SIDEWALK/ROADWAY.
M00570476-I1
08/07/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER DRAWINGS. OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00592577-I1
07/29/2026
Objection resolved — Addressed
07/29/2026
Special inspection requirement — Air barrier — testing
GEORGE GHEBRYAL
07/29/2026
Special inspection requirement — Sprayed fire-resistant materials
GEORGE GHEBRYAL
07/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
07/29/2026
Special inspection requirement — Electrical motors and elevators
GEORGE GHEBRYAL
07/29/2026
Special inspection requirement — Lowest Floor Elevation
07/29/2026
Special inspection requirement — Interior lighting power
GEORGE GHEBRYAL
07/29/2026
Special inspection requirement — Air barrier - visual inspection
GEORGE GHEBRYAL
07/29/2026
Special inspection requirement — Vestibules
GEORGE GHEBRYAL
07/29/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
GEORGE GHEBRYAL
07/29/2026
Special inspection requirement — Maintenance information
GEORGE GHEBRYAL
07/29/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
GEORGE GHEBRYAL
07/29/2026
Special inspection requirement — Insulation placement and R values
GEORGE GHEBRYAL
07/29/2026
Special inspection requirement — Exterior lighting power
GEORGE GHEBRYAL
07/29/2026
Special inspection requirement — Luminous Exit Path Markings
GEORGE GHEBRYAL
07/29/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
GEORGE GHEBRYAL
07/29/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
GEORGE GHEBRYAL
07/29/2026
Special inspection requirement — Fenestration areas
GEORGE GHEBRYAL
07/29/2026
Special inspection requirement — Lighting controls
GEORGE GHEBRYAL
07/29/2026
Special inspection requirement — Fenestration air leakage
GEORGE GHEBRYAL
07/16/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY PROTECTION DECK AT 3RD FLOOR LEVEL AS PER DRAWINGS. PROTECTION DECK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00485399-I1
07/14/2026
Signed off — Alteration
M00756763-I1
07/14/2026
Signed off — Alteration
INSTALL NON-ILLUMINATED WALL SIGN (SCHWARZMAN ANIMAL MEDICAL CENTER)
M00756730-I1
07/14/2026
Signed off — Alteration
INSTALL NON-ILLUMINATED WALL SIGN (THE ELMER AND MAMDOUHA BOBST HOSPITAL)
M00756645-I1
07/14/2026
Objection raised — Scope
07/10/2026
Permit issued — Sign
M00756699-I1-SG
07/10/2026
Permit issued — Sign
M00756755-I1-SG
07/10/2026
Permit issued — Sign
M00756671-I1-SG
07/10/2026
Permit issued — Sign
M00756724-I1-SG
07/10/2026
Permit issued — Sign
M00756740-I1-SG
07/07/2026
Signed off — Alteration
Additions & modifications to existing sprinkler system and related piping. Filed in conjunction to Alteration CO #M00479941. No change in use, egress or occupancy.
M00450631-I1
07/07/2026
Permit issued — Sign
M00756746-I1-SG
07/06/2026
Permit issued — Sign
M00756645-I1-SG
07/06/2026
Permit issued — Sign
M00756736-I1-SG
07/06/2026
Permit issued — Sign
M00756618-I1-SG
06/29/2026
Cycle 9 facade report signed — SWARMP
06/25/2026
Cycle 9 facade report submitted
06/17/2026
Signed off — Alteration
Removal installation of non-bearing partitions and related finished. No change in use, egress or occupancy.
M00559123-I1
06/15/2026
Cycle 9 facade report signed — UNSAFE
06/10/2026
Signed off — Alteration
INSTALLATION OF PLYWOOD FENCE AS PER DRAWINGS. PLYWOOD FENCE SHALL COMPLY WITH CH #33 OFTHE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DOT PERMITS BY OTHERS FOR FENCE INSTALLED ON SIDEWALK/ROADWAY.
M00551439-I1
06/10/2026
Signed off — Alteration
M00919300-I1
06/10/2026
Signed off — Alteration
TEMPORARY SHORING AS PER DRAWINGS. SHORING SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00971841-I1
06/10/2026
Signed off — Alteration
Suspended Scaffold installation under Alt1 application - - Reflecting site conditions of Suspended scaffold in lieu of CD5 application SR21-2321 set up as per plans filed herewith . No change in use, egress or occupancy.
M00674966-I1
06/10/2026
Signed off — Alteration
STORAGE OF MATERIAL / EQUIPMENT ON TOP OF HEAVY DUTY SIDEWALK SHED. STORAGE SHALL NOT EXCEED 150 PSF. SHED FILED UNDER SEPARATE APPLICATION. STORAGE SHALL COMPLY WITH CH#33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION
M00719878-I1
06/10/2026
Signed off — Alteration
TEMPORARY CRASH DECK AS PER DRAWINGS. CRASH DECK SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00728455-I1
06/10/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SCAFFOLD STAIR TOWER AS PER DRAWINGS. SCAFFOLD STAIR TOWER SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00592564-I1
06/10/2026
Signed off — Alteration
TEMPORARY WORK PLATFORM AS PER DRAWINGS. WORK PLATFORM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01232788-I1
06/10/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AT THE AJDACENT PROPERTY DURING BLDG ALTERATION FILED SEP. TEMPORARY ROOF PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00728445-I1
06/09/2026
Signed off — Alteration
Suspended Hanging Scaffold Installation as per plans filed herewith. No change in use, egress or occupancy
M08043357-I1
06/06/2026
Special inspection requirement — Lowest Floor Elevation
GEORGE GHEBRYAL
06/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
GEORGE GHEBRYAL
06/06/2026
Special inspection requirement — Maintenance information
GEORGE GHEBRYAL
06/06/2026
Special inspection requirement — Final
GEORGE GHEBRYAL
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offRED HOOK SIGN AND ELECT07/10/2026
DOB NOWSignSigned-offRED HOOK SIGN AND ELECT07/10/2026
DOB NOWSignPermit IssuedRED HOOK SIGN AND ELECT07/10/2026
DOB NOWSignSigned-offRED HOOK SIGN AND ELECT07/10/2026
DOB NOWSignSigned-offRED HOOK SIGN AND ELECT07/10/2026
DOB NOWSignSigned-offRED HOOK SIGN AND ELECT07/07/2026
DOB NOWSignSigned-offRED HOOK SIGN AND ELECT07/06/2026
DOB NOWSignSigned-offRED HOOK SIGN AND ELECT07/06/2026
DOB NOWSignSigned-offRED HOOK SIGN AND ELECT07/06/2026
DOB NOWStructuralPermit IssuedTURNER CONSTRUCTION COMPANY04/09/2026
DOB NOWGeneral ConstructionPermit IssuedTURNER CONSTRUCTION COMPANY04/09/2026
DOB NOWStructuralPermit IssuedTURNER CONSTRUCTION COMPANY04/09/2026
DOB NOWGeneral ConstructionPermit IssuedA. PETER LUGER CONST INC03/13/2026
DOB NOWSupported ScaffoldSigned-offA. PETER LUGER CONST INC03/05/2026
DOB NOWGeneral ConstructionSigned-offFM95NY LLC11/13/2025
DOB NOWPlumbingSigned-offOLYMPIC PLBG & HTG SVC IN10/29/2025
DOB NOWProtection and Mechanical MethodsSigned-offS&E BRIDGE & SCAFFOLD LLC09/29/2025
DOB NOWSidewalk ShedSigned-offS&E BRIDGE & SCAFFOLD LLC09/29/2025
DOB NOWConstruction FenceSigned-offS&E BRIDGE & SCAFFOLD LLC09/12/2025
DOB NOWProtection and Mechanical MethodsSigned-offS&E BRIDGE & SCAFFOLD LLC09/12/2025
DOB NOWProtection and Mechanical MethodsSigned-offS&E BRIDGE & SCAFFOLD LLC09/12/2025
DOB NOWGeneral ConstructionSigned-offTURNER CONSTRUCTION COMPANY07/09/2025
DOB NOWProtection and Mechanical MethodsSigned-offA. PETER LUGER CONST INC06/12/2025
DOB NOWStructuralPermit IssuedTURNER CONSTRUCTION COMPANY06/06/2025
DOB NOWStructuralPermit IssuedTURNER CONSTRUCTION COMPANY06/05/2025
DOB NOWGeneral ConstructionPermit IssuedTURNER CONSTRUCTION COMPANY06/05/2025
DOB NOWProtection and Mechanical MethodsSigned-offS&E BRIDGE & SCAFFOLD LLC05/29/2025
DOB NOWCurb CutPermit IssuedTURNER CONSTRUCTION COMPANY05/02/2025
DOB NOWCurb CutPermit IssuedTURNER CONSTRUCTION COMPANY05/02/2025
DOB NOWCurb CutPermit IssuedTURNER CONSTRUCTION COMPANY05/02/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedA. PETER LUGER CONST INC04/24/2025
DOB NOWGeneral ConstructionPermit IssuedA. PETER LUGER CONST INC04/18/2025
DOB NOWProtection and Mechanical MethodsSigned-offVIK XS SERVICES INC04/16/2025
DOB NOWSupported ScaffoldSigned-offA. PETER LUGER CONST INC03/19/2025
DOB NOWGeneral ConstructionPermit IssuedTURNER CONSTRUCTION COMPANY03/06/2025
DOB NOWStructuralPermit IssuedTURNER CONSTRUCTION COMPANY03/06/2025
DOB NOWStructuralPermit IssuedTURNER CONSTRUCTION COMPANY03/06/2025
DOB NOWMechanical SystemsPermit IssuedTURNER CONSTRUCTION COMPANY02/27/2025
DOB NOWSprinklersPermit IssuedLAWRENCE J. LEVINE02/18/2025
DOB NOWSprinklersSigned-offLAWRENCE J. LEVINE02/18/2025
+ 60 more permits on file
2 projects · most recent 06/01/2026
Air Conditioning Systems Refrigeration Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/01/2026Permit IssuedTURNER CONSTRUCTION COMPAAir Conditioning Systems, Refrigeration Systems, Ventilation Systems
Cooling
Mitsubishi Electric PUZ-A24HA7 24,000 BTU · Condensing Unit ×4
TUHYE096 96,000 BTU · Vrf Outdoor ×4
TUHYE144 168,000 BTU · Vrf Outdoor ×4
TURYE366 240,000 BTU · Condensing Unit ×4
TRUZA0241HA70NA 24,000 BTU · Condensing Unit ×2
TUHYE0963AN40AN 96,000 BTU · Vrf Outdoor ×2
TUHYE1683AN40AB 168,000 BTU · Vrf Outdoor ×2
TURYE24030AN40AN 240,000 BTU · Vrf Outdoor ×2
United Cool Air B8G3AHA 43,000 BTU · Condensing Unit ×6
Vertiv MCM040 37,000 BTU · Condensing Unit ×4
PFHZ37A-PLN 37,000 BTU · Condensing Unit ×2
Ventilation
Mitsubishi Electric PKA-A24HA7 24,000 BTU · Fan Coil Indoor ×6
United Cool Air E8G3AHA 73,000 BTU · Fan Coil Indoor ×6
Vertiv PX018 37,000 BTU · Fan Coil Indoor ×4
PPFHZ37A-PLN 37,000 BTU · Fan Coil Indoor ×2
Refrigeration
Filtrine PCP-6000-660-ARL-WP 408,000 BTU · Chiller ×6
09/16/2025Signed-offTURNER CONSTRUCTION COMPAAir Conditioning Systems
Cooling
Aaon AAON-RQ-004-2-H-E609-11A 1,235 CFM · Rooftop Unit ×3
2 projects · most recent 01/14/2025
FiledStatusContractorScope
01/14/2025Signed-offPAR FIRE PROTECTION LLC—
09/03/2024Signed-offPAR FIRE PROTECTION LLC1,224 heads
21 projects · most recent 08/12/2026
General Wiring
FiledStatusContractorScope
08/12/2026CancelledRAINBOW ELECTRIC CO., INC—
08/12/2026CompleteRAINBOW ELECTRIC CO., INC—
08/12/2026CompleteRAINBOW ELECTRIC CO., INC—
08/12/2026CompleteRAINBOW ELECTRIC CO., INC—
08/12/2026CompleteRAINBOW ELECTRIC CO., INC—
08/12/2026CompleteRAINBOW ELECTRIC CO., INC—
08/12/2026CompleteRAINBOW ELECTRIC CO., INC—
08/12/2026CompleteRAINBOW ELECTRIC CO., INC—
08/12/2026CompleteRAINBOW ELECTRIC CO., INC—
08/12/2026CompleteRAINBOW ELECTRIC CO., INC—
12/12/2025CompleteNASH ELECTRIC SERVICES IN—
04/17/2025CompleteJAM ELECTRICAL CORPGeneral Wiring
05/12/2023Permit IssuedFSG ELECTRIC INC—
05/09/2023Permit IssuedFSG ELECTRIC INCGeneral Wiring
11/04/2022CompleteKNIGHT ELEC'L SERV. CORP.General Wiring
3 projects · most recent 09/16/2025
Steel Concrete
FiledStatusContractorScope
09/16/2025Signed-offTURNER CONSTRUCTION COMPA1 scope_items
07/09/2025Permit IssuedWEST NEW YORK RESTORATIONSteel
07/03/2025Permit IssuedTURNER CONSTRUCTION COMPASteel, Concrete
6 projects · most recent 12/10/2025
Scaffold Fence Sidewalk Shed
FiledStatusContractorScope
12/10/2025Signed-offS&E BRIDGE & SCAFFOLD LLCSidewalk Shed
07/24/2025Signed-offWEST NEW YORK RESTORATIONScaffold
06/14/2023Signed-offS&E BRIDGE & SCAFFOLD LLCScaffold
05/19/2023Signed-offS&E BRIDGE & SCAFFOLD LLCFence
07/02/2021Signed-offS&E BRIDGE & SCAFFOLD LLCFence
06/09/2021Permit IssuedWEST NEW YORK RESTORATIONScaffold
▾Field Inspections (DOB CAP) — 70
DateTypeResultReport
04/17/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/17/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/14/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/23/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/22/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/02/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/03/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/27/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/02/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/23/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
05/22/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/22/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/10/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/04/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/04/2025Pass-Final House ConnectionPassView ↗
02/05/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/10/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/07/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/24/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/20/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/20/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/22/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/28/2024Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
10/28/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
Latest 25 of 70.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
07/29/2026Lighting controlsGEORGE GHEBRYALenergy_progress
07/29/2026Insulation placement and R valuesGEORGE GHEBRYALenergy_progress
07/29/2026Electrical motors and elevatorsGEORGE GHEBRYALenergy_progress
07/29/2026Fenestration and door U-factor and product ratingsGEORGE GHEBRYALenergy_progress
07/29/2026Air barrier - visual inspectionGEORGE GHEBRYALenergy_progress
07/29/2026Interior lighting powerGEORGE GHEBRYALenergy_progress
07/29/2026Fenestration air leakageGEORGE GHEBRYALenergy_progress
07/29/2026Sprayed fire-resistant materialsGEORGE GHEBRYALspecial
07/29/2026Wall Panels, Curtain Walls, and VeneersGEORGE GHEBRYALspecial
07/29/2026Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
07/29/2026Lowest Floor Elevation—progress
07/29/2026Exterior lighting powerGEORGE GHEBRYALenergy_progress
07/29/2026VestibulesGEORGE GHEBRYALenergy_progress
07/29/2026Maintenance informationGEORGE GHEBRYALenergy_progress
07/29/2026HVAC-R and service water piping design and insulationGEORGE GHEBRYALenergy_progress
07/29/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)GEORGE GHEBRYALspecial
07/29/2026Air barrier — testing GEORGE GHEBRYALenergy_progress
07/29/2026Fenestration areasGEORGE GHEBRYALenergy_progress
07/29/2026Luminous Exit Path MarkingsGEORGE GHEBRYALspecial
06/06/2026Duct leakage testing, insulation and designGEORGE GHEBRYALenergy_progress
06/06/2026Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
06/06/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)GEORGE GHEBRYALspecial
06/06/2026Electrical motors and elevatorsGEORGE GHEBRYALenergy_progress
06/06/2026HVAC-R and service water heating system controlsGEORGE GHEBRYALenergy_progress
06/06/2026Lowest Floor ElevationGEORGE GHEBRYALprogress
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
AnimalmedicalcentebOther—
Project M00756699 Alteration · Permit Entire · 11/08/2022
Project M00756724 Alteration · LOC Issued · 11/08/2022
Bobst Hospital Elmer and Mamdouha Bobst HospitalMedical / Healthcare—
Project M00756645 Alteration · LOC Issued · 11/08/2022
Schwarzman Animal Medical CenterMedical / Healthcare—
Project M00756618 Alteration · LOC Issued · 11/08/2022
Project M00756722 Alteration · Permit Entire · 11/08/2022
Project M00756730 Alteration · LOC Issued · 11/08/2022
Project M00756736 Alteration · Permit Entire · 11/08/2022
Project M00756740 Alteration · Permit Entire · 11/08/2022
Project M00756755 Alteration · Permit Entire · 11/08/2022
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 1,461 on file (BIS + DOB NOW)
▸Plans & Drawings161
▸DOB NOWPlans/Sketch114
09/04/2026M00485399-I1Request digital key ↗
09/03/2026M00481047-I1Request digital key ↗
09/03/2026M00489527-P3Request digital key ↗
Showing 3 of 114 on file for this type
▸DOB NOWPlans/Sketch - General Construction16
09/04/2026M00450660-P2Request digital key ↗
09/04/2026M00450660-P4Request digital key ↗
09/04/2026M00450660-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler10
09/03/2026M00450713-I1Request digital key ↗
09/03/2026M00450713-P3Request digital key ↗
09/03/2026M00450713-P4Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Plumbing9
09/04/2026M00450703-I1Request digital key ↗
09/02/2026M00450623-P6Request digital key ↗
09/02/2026M00450623-P5Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWPlans/Sketch - Structural4
09/04/2026M00450722-I1Request digital key ↗
Showing 1 of 4 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Applications & Permits147
▸BISPLAN / WORK APPROVAL APPLICATION101
09/22/2025120688951Open ↗
08/04/2025120642876Open ↗
08/04/2025120642867Open ↗
Showing 3 of 101 on file for this type
▸BISWORK PERMIT APPLICATION43
12/06/2021141005285Open ↗
Showing 1 of 43 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
03/07/2025141002180Open ↗
10/25/2021141002180Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
11/08/2023123907512Open ↗
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZoning Exhibit form (1-5)6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISZONING DIAGRAM1
08/16/2021123907512Open ↗
▸BISFLOOD ZONE DESIGN CERTIFICATION1
11/12/2021141005285Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
07/26/2021123907512Open ↗
▸Seals & Professional Certifications543
▸DOB NOWProgress Inspector Seal & Signature163
09/28/2026M00577540-P1Open ↗
09/28/2026M00577540-P1Open ↗
09/02/2026M00801281-P1Open ↗
Showing 3 of 163 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature161
09/04/2026M00450660-P4Open ↗
09/04/2026M00450660-P5Open ↗
09/04/2026M00450660-P3Open ↗
Showing 3 of 161 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature106
09/28/2026M00577540-P1Open ↗
09/26/2026M00593374-I1Open ↗
09/23/2026M00514233-I1Open ↗
Showing 3 of 106 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION82
10/25/2021123195906Open ↗
10/25/2021123195906Open ↗
03/10/2020123599356Open ↗
Showing 3 of 82 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT13
08/09/2021141004455Open ↗
Showing 1 of 13 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
08/09/2021141004455Open ↗
Showing 1 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
08/09/2021141004455Open ↗
Showing 1 of 3 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
10/20/2021141005285Open ↗
06/01/2021141002180Open ↗
▸Trade Schedules & Equipment50
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE20
05/16/2019123450880Open ↗
05/10/2019123450880Open ↗
04/10/2019123599356Open ↗
Showing 3 of 20 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA10
07/30/2021123838222Open ↗
06/06/2019123195899Open ↗
05/22/2019123195899Open ↗
Showing 3 of 10 on file for this type
▸BISSELF-CERT PLUMBING NOTICE8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISEQUIPMENT USE PERMITS6
03/09/2020123599356Open ↗
03/09/2020123599356Open ↗
03/09/2020123599356Open ↗
Showing 3 of 6 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSCHEDULE B - PLUMBING3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Safety & Tenant Protection10
▸BISSTREET TREE CHECKLIST6
10/22/2021141002180Open ↗
05/24/2021123907512Open ↗
Showing 2 of 6 on file for this type
▸BISTenant Protection Plan and Notes4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Environmental & Asbestos85
▸DOB NOWDEP ACP-5: Asbestos Assessment Report46
09/03/2026M00481047-I1Open ↗
09/03/2026M00489527-P2Open ↗
09/03/2026M00489527-I1Open ↗
Showing 3 of 46 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form17
09/04/2026M00450660-I1Open ↗
09/03/2026M00450713-I1Open ↗
09/01/2026M00756671-I1Open ↗
Showing 3 of 17 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
08/06/2019122645619Open ↗
▸Energy Compliance54
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS34
10/25/2021123195906Open ↗
10/25/2021123195906Open ↗
03/10/2020123599356Open ↗
Showing 3 of 34 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS9
03/10/2020123599356Open ↗
06/06/2019123195899Open ↗
02/22/2019123195906Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
12/06/2021141005285Open ↗
10/20/2021141005285Open ↗
05/24/2021123907512Open ↗
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/02/2026141005285Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY6
12/06/2021141005285Open ↗
10/20/2021141005285Open ↗
08/16/2021123907512Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs205
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter150
09/04/2026M00450703-P1Open ↗
09/04/2026M00450703-I1Open ↗
09/03/2026M00481047-I1Open ↗
Showing 3 of 150 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST19
07/24/2025120441879Open ↗
07/24/2025123838222Open ↗
03/10/2020123599356Open ↗
Showing 3 of 19 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE11
10/22/2024123907512Open ↗
10/18/2024123907512Open ↗
10/18/2024123907512Open ↗
Showing 3 of 11 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
08/06/2019122645619Open ↗
08/01/2019122645619Open ↗
Showing 2 of 9 on file for this type
▸BISADMINISTRATIVE OBJECTIONS9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸DOB NOWDEP Variance (V5) letter5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISNYS DEC TIDAL WETLANDS APPROVAL1
06/01/2021141002180Open ↗
▸BISOK TCO 90 DAYS W/PENDING FISP VIOS PER PE W.MELVIN LETTER DATED NOV 1 20231
08/05/2024123907512Open ↗
▸Cost, Insurance & Ownership54
▸BISCOST AFFIDAVIT47
11/12/2021141005285Open ↗
08/16/2021123907512Open ↗
08/09/2021141004455Open ↗
Showing 3 of 47 on file for this type
▸BISOK TO ISSUE TCO PENDING RESOLTION OF OPEN FACADE VIOLATION - AFFIDAVIT ATTACHED2
11/12/2025123907512Open ↗
12/31/2024123907512Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW32
07/23/2025123838222Open ↗
07/23/2025120441879Open ↗
▸BISOK TO ISSUE TCO PENDING RESOLUTION OFOPEN FACADE VIOLATION - AFFIDAVIT ATTACHED2
08/05/2024123907512Open ↗
08/05/2024123907512Open ↗
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
08/18/2021123907512Open ↗
▸Filing & Intake Forms78
▸BISEFILING COVER SHEET31
03/08/2021123907512Open ↗
04/10/2019123838222Open ↗
Showing 2 of 31 on file for this type
▸BISADDITIONAL INFORMATION25
04/22/2025141002180Open ↗
11/27/2024141004455Open ↗
03/12/2024141004455Open ↗
Showing 3 of 25 on file for this type
▸BISBOROUGH INTAKE FORM17
03/10/2020123599356Open ↗
08/06/2019122645619Open ↗
08/01/2019122645619Open ↗
Showing 3 of 17 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
10/20/2021141005285Open ↗
08/09/2021141004455Open ↗
06/01/2021141002180Open ↗
Showing 3 of 5 on file for this type
▸Other Documents42
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸DOB NOWLowest Floor Elevation Plan12
09/04/2026M00450660-I1Open ↗
09/04/2026M00450703-I1Open ↗
09/03/2026M00604730-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)6
09/03/2026M00450713-I1Open ↗
Showing 1 of 6 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION4
06/25/2021123907512Open ↗
06/25/2021123907512Open ↗
06/25/2021123907512Open ↗
Showing 3 of 4 on file for this type
▸BISSupporting Document: Fee Exempt2
08/16/2021123907512Open ↗
08/10/2021123907512Open ↗
▸BISOP-129 INTERNAL (SECONDARY) BACKFLOW PREVENTION DEVICE TEST REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION1
04/22/2025141002180Open ↗
▸BISFEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34)1
05/24/2021123907512Open ↗
▸BISPLOT DIAGRAM1
05/24/2021123907512Open ↗