← Back
BuildNYC
Old law tenement
510 MANHATTAN AVENUE
MANHATTAN · BIN 1059191
💬 Discuss this project
1901Year Built
5Stories
C4Building Class
R7AZoning
13,565 sfGross Floor Area
10Units
Rent Stabilized1 Active Violation 1 likely answered ▸
Old law tenement · Owner of record: HPH Chosen · 3,468 sf lot · 3.91 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 14p · 1 filing · 2 docs
CellarCellar plumbing work3p · 2 filings · 20 docs
Site & exteriorFacade brick and stucco repair4p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Abj Chosen803/21/2026
HPH Chosen203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Livolt408/01/2022
Enthink Engineers106/09/2022
Post & Lintel103/17/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
2155 Morris803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A & E PlumbingPlumbing607/08/2026
Elbe ConstructionGeneral Contractor303/21/2026
Reliable EnterprisesScaffold303/21/2026
180 ConstructionGeneral Contractor203/21/2026
Towne Plumbing & HeatingPlumbing103/21/2026
Clean Tech MechanicalPlumbing105/08/2019
Medco PlumbingPlumbing112/29/1993
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Livolt7918408/01/2022
Lighthouse5538103/17/2022
Building Lifecycle
06/02/2026
Boiler inspection report filed
Initial · no defects · Accepted
05/09/2026
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE AT 3RD STORY LANDING AT PUBLIC HALL STAIRS, 3rd STORY
HPD violation · open
07/02/2025
Boiler inspection report filed
Initial · no defects · Accepted
04/24/2025
§ 27-2005 ADM code properly repair with similar material the broken or defective broken metal tread (6 up from bottom) at fire passage way at…
HPD violation · closed
03/03/2025
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st…
HPD violation · closed
127 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offA & E Plumbing05/02/2023
DOB NOWSidewalk ShedPermit IssuedReliable Enterprises06/09/2022
DOB NOWGeneral ConstructionSigned-offElbe Construction06/08/2022
DOB NOWPlumbingSigned-offA & E Plumbing11/24/2021
DOB NOWBoiler EquipmentSigned-offA & E Plumbing11/23/2021
DOB NOWBoiler EquipmentSigned-offA & E Plumbing10/05/2021
DOB NOWPlumbingSigned-offA & E Plumbing10/05/2021
BISPLISSUEDClean Tech Mechanical05/08/2019
BISOTISSUED180.Construction04/12/2019
BISOTISSUED180.Construction04/26/2018
BISPLISSUEDTowne Plumbing & Heating02/07/1996
BISEQISSUEDManhattan Builders12/14/1995
BIS—ISSUEDManhattan Builders12/14/1995
BISEQISSUED2021 Associates01/09/1995
BIS—ISSUED2021 Associates01/09/1995
BISPLISSUEDMedco Plumbing12/29/1993
BISEQISSUEDUnited General Construction12/20/1993
BIS—ISSUEDUnited General Construction08/19/1993
BIS—ISSUEDUnited General Construction06/08/1993
BISEQISSUEDUnited General Construction06/08/1993
1 project · most recent 06/09/2022
FiledStatusContractorScope
06/09/2022Permit IssuedRichard Neu—
1 project · most recent 06/09/2022
Sidewalk Shed
FiledStatusContractorScope
06/09/2022Permit IssuedReliable EnterprisesSidewalk Shed
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
06/25/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/12/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/12/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
08/03/2022Fire-Resistant Penetrations and JointsNathan Winklerspecial
08/03/2022HVAC-R and service water heating equipmentNathan Winklerenergy_progress
08/03/2022HVAC-R and service water heating system controlsNathan Winklerenergy_progress
08/02/2022HVAC-R and service water heating system controlsNathan Winklerenergy_progress
08/02/2022Fire-Resistant Penetrations and JointsNathan Winklerspecial
08/02/2022HVAC-R and service water piping design and insulationNathan Winklerenergy_progress
08/02/2022HVAC-R and service water heating equipmentNathan Winklerenergy_progress
02/06/2022Fire-Resistant Penetrations and JointsNathan Winklerspecial
02/06/2022HVAC-R and service water heating equipmentNathan Winklerenergy_progress
02/06/2022HVAC-R and service water heating system controlsNathan Winklerenergy_progress
02/06/2022Fire-Resistant Penetrations and JointsNathan Winklerspecial
02/06/2022HVAC-R and service water piping design and insulationNathan Winklerenergy_progress
02/06/2022HVAC-R and service water heating system controlsNathan Winklerenergy_progress
02/06/2022HVAC-R and service water heating equipmentNathan Winklerenergy_progress
01/10/2022Structural Stability – Alterations of existing buildingsSAMIR ABDALLAspecial
01/10/2022Energy Code Compliance InspectionsWALEED AFRIDIprogress
01/10/2022MasonrySAMIR ABDALLAspecial
01/10/2022FinalWALEED AFRIDIprogress
66 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account