← Back
Over six families without stores
510 WEST 176 STREET
MANHATTAN · Washington Heights (South) · BIN 1063202
💬 Discuss this project
1906Year Built
5Stories
C1Building Class
R7-2Zoning
15,600 sfGross Floor Area
20Units
Rent Stabilized5 Open Violations ▸
Over six families without stores · Owner of record: PACT RENAISSANCE COLLABORATIVE LLC · 4,346 sf lot · 3.59 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingEquipmentGeneral
Roof4p · 1 filing · 4 docs
Floor 515p · 3 filings · 20 docs
Floor 415p · 3 filings · 20 docs
Floor 315p · 3 filings · 20 docs
Floor 214p · 3 filings · 20 docs
Floor 111p · 2 filings · 15 docs
Cellar30p · 5 filings · 20 docs
Site & exterior9p · 1 filing · 6 docs
Filed — no permit issued1p · 1 filing · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNERS REP603/22/2026
NEW YORK CITY HOUSING AUTHORITY503/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DAGHER ENGINEERING PLLC1202/09/2024
PAUL PERDEK, PROF. ENG. PLLC208/25/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.2403/21/2026
AE DESIGN SOLUTION403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CORE SCAFFOLD SYSTEMS INC.General Contractor603/21/2026
DUAL FUEL COMPANY LLCGeneral Contractor303/21/2026
PYRAMID ETC COMPANIES, LLGeneral Contractor303/21/2026
A & E PLUMBING CORPPlumbing307/08/2026
DUAL FUEL PLUBING & HTINGPlumbing307/08/2026
V. VASS ELECTRIC CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M. HAMDI GUNAL, PE, P.C.30001012/05/2022
Building Lifecycle
All (93)Filed (14)Permit Issued (9)Signed Off (5)Violation (28)Inspection (7)Special Inspection (30)
04/29/2026
Violation issued (HPD, closed)
A
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/21/2025
Violation issued (HPD, closed)
C
10/21/2025
Violation issued (HPD, closed)
B
10/21/2025
Violation issued (HPD, closed)
C
10/21/2025
Violation issued (HPD, closed)
C
10/21/2025
Violation issued (HPD, closed)
C
10/21/2025
Violation issued (HPD, closed)
C
10/21/2025
Violation issued (HPD, closed)
C
12/02/2024
Signed off — Alteration
Plumbing work filed in conjunction with Interior renovation filed under DOB Job #140957221. No change in use, occupancy, or egress.
M00528645-I1
10/17/2024
Permit issued — Plumbing
M00528645-I1-PL
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/19/2024
Violation issued (HPD, closed)
C
08/19/2024
Violation issued (HPD, closed)
C
02/21/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/09/2024
Filed — Alteration
Plumbing work filed in conjunction with Interior renovation filed under DOB Job #140957221. No change in use, occupancy, or egress.
M00528645-P1
02/09/2024
Special inspection requirement — Energy Code Compliance Inspections
Mehmet Gunal
02/09/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Mehmet Gunal
01/31/2024
Signed off — Alteration
M00521650-I1
11/17/2023
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
11/08/2023
Permit issued — Plumbing
M00528645-I1-PL
10/30/2023
Permit issued — Mechanical Systems
M00521650-I1-MS
10/10/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/12/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/20/2022
Signed off — Alteration
Boiler work as per plans filed.
M00396684-I1
12/13/2022
Signed off — Alteration
Plumbing work as per plans filed.
M00324861-I1
12/12/2022
Special inspection requirement — HVAC insulation and sealing
Mehmet Gunal
12/12/2022
Special inspection requirement — Maintenance information
Mehmet Gunal
12/12/2022
Special inspection requirement — Energy Code Compliance Inspections
Mehmet Gunal
12/12/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mehmet Gunal
12/05/2022
Filed — Alteration
Plumbing work as per plans filed.
M00324861-P4
11/16/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mehmet Gunal
11/16/2022
Special inspection requirement — Energy Code Compliance Inspections
Mehmet Gunal
11/16/2022
Special inspection requirement — HVAC insulation and sealing
Mehmet Gunal
11/16/2022
Special inspection requirement — Maintenance information
Mehmet Gunal
11/09/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/04/2022
Filed — Alteration
Plumbing work as per plans filed.
M00324861-P3
10/12/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/03/2022
Filed — Alteration
Plumbing work as per plans filed.
M00324861-P2
09/06/2022
Special inspection requirement — Maintenance information
Mehmet Gunal
09/06/2022
Special inspection requirement — Energy Code Compliance Inspections
Mehmet Gunal
09/06/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mehmet Gunal
09/06/2022
Special inspection requirement — HVAC insulation and sealing
Mehmet Gunal
08/16/2022
Permit issued — Plumbing
M00324861-I1-PL
07/28/2022
Permit issued — Sidewalk Shed
M00567494-I1-SH
06/24/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
02/14/2022
Signed off — Alteration
M00550033-I1
09/23/2021
Permit issued — Boiler Equipment
M00396684-I1-BE
08/25/2021
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00567494-P1
08/12/2021
Filed — Alteration
Plumbing work as per plans filed.
M00324861-P1
08/11/2021
Permit issued — Mechanical Systems
M00550033-I1-MS
07/30/2021
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00567494-I1
07/30/2021
Permit issued — Sidewalk Shed
M00567494-I1-SH
07/28/2021
Filed — Alteration
M00550033-I1
07/28/2021
Filed — Alteration
Boiler work as per plans filed.
M00396684-P1
07/28/2021
Special inspection requirement — Maintenance information
Mehmet Gunal
07/28/2021
Special inspection requirement — HVAC and service water heating system controls
Mehmet Gunal
Latest 60 of 93 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offA & E PLUMBING CORP10/17/2024
DOB NOWPlumbingSigned-offA & E PLUMBING CORP11/08/2023
DOB NOWMechanical SystemsSigned-offPYRAMID ETC COMPANIES, LL10/30/2023
DOB NOWPlumbingSigned-offDUAL FUEL PLUBING & HTING08/16/2022
DOB NOWSidewalk ShedPermit IssuedCORE SCAFFOLD SYSTEMS INC07/28/2022
DOB NOWBoiler EquipmentSigned-offDUAL FUEL PLUBING & HTING09/23/2021
DOB NOWMechanical SystemsSigned-offDUAL FUEL COMPANY LLC08/11/2021
DOB NOWSidewalk ShedPermit IssuedCORE SCAFFOLD SYSTEMS INC07/30/2021
DOB NOWBoiler EquipmentSigned-offDUAL FUEL PLUBING & HTING06/10/2021
BISOTISSUEDMONADNOCK CONSTRUCTION IN11/07/2023
BISOTISSUEDMONADNOCK CONSTRUCTION IN11/17/2022
BISOTISSUEDPYRAMID ETC COMPANIES, LL08/03/2022
BISOTISSUEDMONADNOCK CONSTRUCTION IN10/04/2021
BISOTISSUEDMONADNOCK CONSTRUCTION IN10/01/2021
BISOTISSUEDPYRAMID ETC COMPANIES, LL08/12/2021
BISOTISSUEDMONADNOCK CONSTRUCTION IN07/15/2021
BISEQISSUEDLAKHI GENERAL CONTRACTOR02/26/2015
BISEQISSUEDLAKHI GENERAL CONTRACTOR08/14/2014
BISOTISSUEDLAKHI GENERAL CONTRACTOR08/12/2014
BISEQISSUEDAKRO GENERAL CONTR. INC12/01/2010
BISEQISSUEDAKRO GENERAL CONTR. INC02/19/2010
BISEQISSUEDNYC CONSTRUCTION SVC. INC01/21/2010
BISPLISSUEDDUAL FUEL PLUBING & HTING03/27/2006
3 projects · most recent 10/26/2023
Boiler Controls
FiledStatusContractorScope
10/26/2023CompleteABILENE ELECTRIC INC—
02/27/2022CompleteITKIN ELECTRIC CORP.Boiler Controls
07/30/2021CompleteV. VASS ELECTRIC CORP—
1 project · most recent 08/25/2021
Sidewalk Shed
FiledStatusContractorScope
08/25/2021Permit IssuedCORE SCAFFOLD SYSTEMS INCSidewalk Shed
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
02/21/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/17/2023Fail-Final PL - Up to 9 Requested FloorsFailView ↗
10/10/2023Pass-Final CND-Occupancy InspectionPassView ↗
07/12/2023Pass-Final CND-Occupancy InspectionPassView ↗
11/09/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/12/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/24/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
02/09/2024Energy Code Compliance InspectionsMehmet Gunalprogress
02/09/2024HVAC-R and service water piping design and insulationMehmet Gunalenergy_progress
12/12/2022HVAC insulation and sealing Mehmet Gunalenergy_progress
12/12/2022Maintenance informationMehmet Gunalenergy_progress
12/12/2022Energy Code Compliance InspectionsMehmet Gunalprogress
12/12/2022Fire-Resistant Penetrations and JointsMehmet Gunalspecial
11/16/2022Fire-Resistant Penetrations and JointsMehmet Gunalspecial
11/16/2022Energy Code Compliance InspectionsMehmet Gunalprogress
11/16/2022HVAC insulation and sealing Mehmet Gunalenergy_progress
11/16/2022Maintenance informationMehmet Gunalenergy_progress
09/06/2022Maintenance informationMehmet Gunalenergy_progress
09/06/2022Energy Code Compliance InspectionsMehmet Gunalprogress
09/06/2022Fire-Resistant Penetrations and JointsMehmet Gunalspecial
09/06/2022HVAC insulation and sealing Mehmet Gunalenergy_progress
07/28/2021Maintenance informationMehmet Gunalenergy_progress
07/28/2021HVAC and service water heating system controls Mehmet Gunalenergy_progress
07/28/2021HVAC and service water heating equipment Mehmet Gunalenergy_progress
07/28/2021Fire-Resistant Penetrations and JointsMehmet Gunalspecial
07/28/2021Heating SystemsMehmet Gunalspecial
07/19/2021HVAC and service water heating equipment Mehmet Gunalenergy_progress
07/19/2021Maintenance informationMehmet Gunalenergy_progress
07/19/2021HVAC and service water heating system controls Mehmet Gunalenergy_progress
07/19/2021Fire-Resistant Penetrations and JointsMehmet Gunalspecial
07/19/2021Heating SystemsMehmet Gunalspecial
09/11/2020Fire-Resistant Penetrations and JointsMehmet Gunalspecial
Latest 25 of 30.
▾Documents — 199 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch6
09/03/2026M00521650-I1Request digital key ↗
09/03/2026M00528645-P1Request digital key ↗
09/03/2026M00528645-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
09/01/2026M00324861-P2Request digital key ↗
09/01/2026M00324861-P4Request digital key ↗
09/01/2026M00324861-P3Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment2
09/04/2026M00396684-I1Request digital key ↗
08/15/2026M00396684-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00396151-I1Request digital key ↗
▸Applications & Permits20
▸BISPLAN / WORK APPROVAL APPLICATION10
07/19/2021140957221Open ↗
07/08/2021140957221Open ↗
09/24/2020140957221Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION9
08/12/2021140956534Open ↗
07/15/2021140957221Open ↗
02/25/2015140297676Open ↗
Showing 3 of 9 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
12/03/2015140239258Open ↗
▸Seals & Professional Certifications67
▸DOB NOWProgress Inspector Seal & Signature21
09/23/2026M00396684-I1Open ↗
09/23/2026M00396684-I1Open ↗
09/23/2026M00396684-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/03/2026M00521650-I1Open ↗
09/03/2026M00550033-I1Open ↗
09/03/2026M00567494-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/23/2026M00396684-I1Open ↗
09/23/2026M00396684-I1Open ↗
09/02/2026M00324861-I1Open ↗
Showing 3 of 9 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
09/24/2020140957221Open ↗
09/23/2020140956534Open ↗
02/25/2015140297676Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
09/24/2020140957221Open ↗
09/23/2020140956534Open ↗
02/25/2015140297676Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
09/24/2020140957221Open ↗
09/23/2020140956534Open ↗
02/25/2015140297676Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
11/27/2010120540557Open ↗
02/19/2010120271026Open ↗
01/22/2010120248543Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
11/27/2010120540557Open ↗
02/19/2010120271026Open ↗
01/22/2010120248543Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
05/12/2016140186796Open ↗
01/22/2010120248543Open ↗
▸Safety & Tenant Protection10
▸DOB NOWTenant Protection Plan8
08/13/2026M00396684-P1Open ↗
08/13/2026M00324861-P3Open ↗
08/13/2026M00324861-P1Open ↗
Showing 3 of 8 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES2
09/24/2020140957221Open ↗
09/23/2020140956534Open ↗
▸Environmental & Asbestos18
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
09/03/2026M00521650-I1Open ↗
09/03/2026M00550033-I1Open ↗
08/13/2026M00396151-I1Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
02/19/2010120271026Open ↗
01/22/2010120248543Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
09/24/2020140957221Open ↗
04/16/2014140186796Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
08/12/2021140956534Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
12/03/2010120540557Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
01/23/2024140957221Open ↗
01/23/2024140957221Open ↗
08/12/2021140956534Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
01/23/2024140957221Open ↗
03/30/2023140956534Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
09/24/2020140957221Open ↗
09/23/2020140956534Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026M00528645-I1Open ↗
08/13/2026M00521650-I1Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
03/30/2023140956534Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00396684-I1Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY6
01/23/2024140957221Open ↗
01/23/2024140957221Open ↗
08/12/2021140956534Open ↗
Showing 3 of 6 on file for this type
▸BISMASONRY1
03/30/2023140956534Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
03/30/2023140956534Open ↗
▸Approvals, Objections & Sign-offs28
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter14
09/03/2026M00521650-I1Open ↗
09/03/2026M00550033-I1Open ↗
09/03/2026M00567494-I1Open ↗
Showing 3 of 14 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
01/24/2024140957221Open ↗
03/31/2023140956534Open ↗
05/12/2016140186796Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
11/27/2010120540557Open ↗
02/19/2010120271026Open ↗
01/22/2010120248543Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION3
05/05/2016140297676Open ↗
05/05/2016140297676Open ↗
12/03/2015140239258Open ↗
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)2
09/24/2020140957221Open ↗
09/23/2020140956534Open ↗
▸BISFINAL1
03/30/2023140956534Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT4
09/24/2020140957221Open ↗
09/23/2020140956534Open ↗
05/12/2016140186796Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
01/23/2024140957221Open ↗
03/30/2023140956534Open ↗
▸Filing & Intake Forms11
▸BISEFILING JOB APPLICATION COVER SHEET5
09/24/2020140957221Open ↗
09/23/2020140956534Open ↗
02/25/2015140297676Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET3
11/27/2010120540557Open ↗
02/19/2010120271026Open ↗
01/22/2010120248543Open ↗
▸BISADDITIONAL INFORMATION3
07/19/2021140957221Open ↗
10/31/2014140239258Open ↗
09/30/2014140239258Open ↗
▸Other Documents4
▸BISFEE EXEMPTION DOCUMENTATION4
09/24/2020140957221Open ↗
09/23/2020140956534Open ↗
02/25/2015140297676Open ↗
Showing 3 of 4 on file for this type