← Back
Walk-up apt, over six families with stores
510 WEST 218 STREET
MANHATTAN · Inwood · BIN 1065018
💬 Discuss this project
1925Year Built
5Stories
C7Building Class
R7DZoning
32,499 sfGross Floor Area
43Units
LL97 CoveredRent Stabilized40 Open Violations 38 unresolved · 2 paperwork only ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: 510 WEST 218 HOLDING CORP · 9,000 sf lot · 3.61 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalCivil
Permit Issued — active, not yet Signed-off
Floor 13p · 1 filing · 3 docs
Cellar4p · 1 filing · 3 docs
Site & exteriorUnder Construction5p · 3 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AARCO CONTRACTING1207/08/2026
510 GROCERY CORP DBA PARK TERRAC503/21/2026
510 W 218 STREET HOLDING CORP404/09/2026
510 WEST 218 HOLDING403/22/2026
CANDOR CAPITAL ONE105/15/2026
DELI LLC103/21/2026
A S M CONSTRUCTION OF NY103/21/2026
A S M CONSTRUCTION103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ELEVATED ENGINEERING NYC205/14/2026
LOUIS ARENA109/03/2025
SYED ENGINEERING, P.C.312/13/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES303/21/2026
NEW YORK ENGINEERING ASSOCIATES P203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AARCO CONTRACTING LLCGeneral Contractor707/08/2026
E.T. ELEC'L CONTR CO INCElectrical103/22/2026
YOUNG CHOEElectrical103/21/2026
TARGET CONSTRUCTION LLCGeneral Contractor105/15/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616205/14/2026
NEW YORK ENGINEERING ASSO851109/03/2025
SYED ENGINEERING, P.C.7054112/04/2021
Building Lifecycle
All (86)Filed (6)Permit Issued (5)Signed Off (3)Violation (60)Inspection (1)Special Inspection (11)
09/07/2026
Violation issued (ECB, open)
Construction
05/15/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SHAHRIAR QUAYYUM
05/15/2026
Special inspection requirement — Final
SHAHRIAR QUAYYUM
05/15/2026
Special inspection requirement — Masonry
SHAHRIAR QUAYYUM
05/15/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/14/2026
Filed — Alteration
Facade crack repair work
M01392209-P1
05/13/2026
Permit issued — General Construction
M01392209-I1-GC
05/13/2026
Special inspection requirement — Final
SHAHRIAR QUAYYUM
05/13/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/13/2026
Special inspection requirement — Masonry
SHAHRIAR QUAYYUM
05/13/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SHAHRIAR QUAYYUM
05/01/2026
Filed — Alteration
Facade crack repair work
M01392209-I1
04/29/2026
Violation issued (HPD, closed)
A
01/20/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/17/2025
Permit issued — Boiler Equipment
M01233957-I1-BE
09/03/2025
Filed — Alteration
M01233957-I1
08/20/2025
Violation issued (HPD, closed)
C
08/02/2025
Violation issued (HPD, closed)
C
08/02/2025
Violation issued (HPD, closed)
B
08/02/2025
Violation issued (HPD, closed)
A
08/02/2025
Violation issued (HPD, closed)
A
08/02/2025
Violation issued (HPD, closed)
B
08/02/2025
Violation issued (HPD, closed)
B
06/04/2025
Violation issued (HPD, closed)
A
03/31/2025
Violation issued (FDNY_ORDER, closed)
10/24/2024
Violation issued (HPD, closed)
C
10/24/2024
Violation issued (HPD, closed)
C
10/24/2024
Violation issued (HPD, closed)
B
10/24/2024
Violation issued (HPD, closed)
B
10/24/2024
Violation issued (HPD, closed)
B
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2024
Violation issued (ECB, closed)
Boilers
04/02/2024
Violation issued (HPD, closed)
A
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/16/2023
Violation issued (HPD, closed)
A
11/07/2022
Violation issued (HPD, closed)
B
11/05/2022
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00639649-I1
11/05/2022
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00640579-I1
10/18/2022
Violation issued (HPD, closed)
A
10/18/2022
Violation issued (HPD, closed)
B
10/18/2022
Violation issued (HPD, closed)
C
05/09/2022
Signed off — Alteration
PROPOSED BRICKS REPLACEMENT AS PER PLANS NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION
M00642112-I1
02/16/2022
Violation issued (HPD, closed)
A
12/14/2021
Permit issued — Supported Scaffold
M00640579-I1-SF
12/13/2021
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00640579-I1
12/13/2021
Permit issued — General Construction
M00642112-I1-GC
12/04/2021
Filed — Alteration
PROPOSED BRICKS REPLACEMENT AS PER PLANS NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION
M00642112-I1
12/04/2021
Special inspection requirement — Final
RAFI HAMID
12/04/2021
Special inspection requirement — Masonry
RAFI HAMID
Latest 60 of 86 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedTARGET CONSTRUCTION LLC05/13/2026
DOB NOWBoiler EquipmentSigned-offG. BAUER, INC09/17/2025
DOB NOWSupported ScaffoldSigned-offAARCO CONTRACTING LLC12/14/2021
DOB NOWGeneral ConstructionSigned-offAARCO CONTRACTING LLC12/13/2021
DOB NOWSidewalk ShedSigned-offAARCO CONTRACTING LLC12/02/2021
BISPLISSUEDPETER PLUMBING ASSOC. INC.01/22/2014
BISEQISSUEDAMKO DESIGN BUILDER CORP01/07/2014
BISOTISSUEDAMKO DESIGN BUILDER CORP01/07/2014
BISFPISSUEDUNIQUE FIRE SYSTEMS INC10/04/2013
BISPLISSUEDMARQUIS P & H CO., INC04/19/2011
BISOTISSUEDAEG RESTORATION CORP03/03/2011
BISOTISSUEDA S M CONSTRUCTION OF NY11/16/2010
BISMHISSUEDIDEAL KITCHEN VENTILATION01/14/2005
BISPLISSUEDDUAL FUEL PLBG & HTG10/28/2002
BISBLISSUEDDUAL FUEL PLBG & HTG10/28/2002
BISMHISSUEDIDEAL KITCHEN VENTILATION10/25/2002
BISFPISSUEDIDEAL FIRE CONTROL,INC.04/17/2000
BISPLISSUEDPAT SEMENTA P & H CO INC04/23/1998
BISOTISSUEDGENSI CONST.12/04/1997
BISBLISSUEDG. BAUER INC.05/17/1996
4 projects · most recent 04/15/2026
Boiler Controls General Wiring
FiledStatusContractorScope
04/15/2026Permit IssuedRICHARD NEU—
07/14/2025Permit IssuedCOUNTY ELECL CONTRACTOR IBoiler Controls
01/08/2025CompleteE.T. ELEC'L CONTR CO INCGeneral Wiring
12/01/2021CompleteRICHARD NEU—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
01/20/2026Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
05/15/2026Structural Stability – Alterations of existing buildingsSHAHRIAR QUAYYUMspecial
05/15/2026FinalSHAHRIAR QUAYYUMprogress
05/15/2026MasonrySHAHRIAR QUAYYUMspecial
05/15/2026Tenant Protection Plan Compliance—special
05/13/2026FinalSHAHRIAR QUAYYUMprogress
05/13/2026Tenant Protection Plan Compliance—special
05/13/2026MasonrySHAHRIAR QUAYYUMspecial
05/13/2026Structural Stability – Alterations of existing buildingsSHAHRIAR QUAYYUMspecial
12/04/2021FinalRAFI HAMIDprogress
12/04/2021MasonryRAFI HAMIDspecial
12/01/2021FinalRAFI HAMIDprogress
▾Documents — 122 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
09/03/2026M00639649-I1Request digital key ↗
09/03/2026M00642112-I1Request digital key ↗
09/03/2026M00640579-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits22
▸BISPLAN / WORK APPROVAL APPLICATION13
08/21/2014121771430Open ↗
08/08/2014121771430Open ↗
03/31/2014121889714Open ↗
Showing 3 of 13 on file for this type
▸BISWORK PERMIT APPLICATION9
01/29/2014121889714Open ↗
01/09/2014121889714Open ↗
01/09/2014121889714Open ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications31
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
06/12/2014121771430Open ↗
04/08/2014121889714Open ↗
01/09/2014121889714Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/03/2026M00639649-I1Open ↗
08/21/2026M01233957-I1Open ↗
08/17/2026M01392209-P1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
01/09/2014121889714Open ↗
09/13/2013121771430Open ↗
11/19/2010120532655Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/27/2026M01392209-I1Open ↗
08/26/2026M00642112-I1Open ↗
08/23/2026M00639649-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/27/2026M01392209-I1Open ↗
08/26/2026M00642112-I1Open ↗
08/23/2026M01392209-P1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
01/09/2014121889714Open ↗
09/13/2013121771430Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
11/19/2010120532655Open ↗
10/28/2010120506933Open ↗
▸Trade Schedules & Equipment11
▸BISSELF-CERT PLUMBING NOTICE4
03/13/2014121889714Open ↗
02/05/2014121889714Open ↗
11/29/2011120617083Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING3
07/29/2011120617083Open ↗
02/28/2011120617083Open ↗
02/28/2011120617083Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
01/27/2014121889714Open ↗
01/24/2014121889714Open ↗
01/09/2014121889714Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
06/25/2014121630048Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/21/2026M01233957-I1Open ↗
08/17/2026M01392209-P1Open ↗
08/17/2026M01392209-I1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
09/13/2013121771430Open ↗
10/28/2010120506933Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
02/28/2011120617083Open ↗
11/19/2010120532655Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/09/2014121889714Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
04/08/2014121889714Open ↗
01/09/2014121889714Open ↗
01/22/2013120617083Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
04/08/2014121889714Open ↗
01/22/2013120617083Open ↗
▸BISTECHNICAL REPORT: ENERGY1
02/28/2011120617083Open ↗
▸Approvals, Objections & Sign-offs12
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
06/25/2014121630048Open ↗
06/12/2014121771430Open ↗
04/08/2014121889714Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
05/31/2013121630048Open ↗
02/28/2011120617083Open ↗
11/19/2010120532655Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
04/08/2014121889714Open ↗
01/22/2013120617083Open ↗
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT12
06/25/2014121630048Open ↗
06/12/2014121771430Open ↗
04/08/2014121889714Open ↗
Showing 3 of 12 on file for this type
▸Filing & Intake Forms13
▸BISADDITIONAL INFORMATION7
09/10/2014121771430Open ↗
08/21/2014121771430Open ↗
03/31/2014121889714Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET6
01/09/2014121889714Open ↗
09/13/2013121771430Open ↗
05/31/2013121630048Open ↗
Showing 3 of 6 on file for this type
▸Other Documents1
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
12/30/2010120532655Open ↗