← Back
BuildNYC
Primarily 3 family with 1 store or office
5102 6TH AVENUE
BROOKLYN · BIN 3013622
💬 Discuss this project
1931Year Built
3Stories
S3Building Class
R6AZoning
3,717 sfGross Floor Area
4Units
12 Active Violations ▸FDNY Report ↗
Primarily 3 family with 1 store or office · 1,487 sf lot · 2.5 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofTemporary platform and bracing shoring installation3p · 2 filings · 18 docs
Floor 3Storm water piping and plumbing work24p · 2 filings · 20 docs
Floor 2Storm water piping and plumbing work27p · 2 filings · 20 docs
Floor 1Temporary platform and bracing shoring installation25p · 3 filings · 20 docs
CellarInstall kitchen hood and 4 AC split units28p · 3 filings · 20 docs
Site & exteriorInstall non-illuminated awning on front face of building9p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Safe-Shield Enterprises503/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/10/2021$1.6M—Private party → Private party$437/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Factory Engineering Works509/04/2025
NY Building Associates603/11/2025
J&R Design and Inspection112/29/2023
Ashraf111/24/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Kon Ho Lee Consulting Engineer PLL2203/21/2026
Highquality Construction VNW203/21/2026
Danico Services203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MZX GroupGeneral Contractor707/08/2026
Safe-Sheild EnterpriseScaffold303/21/2026
A.C. Morgan ElectricElectrical103/22/2026
W Product & SuppliesGeneral Contractor104/09/2026
MZX GroupScaffold107/08/2026
American Standard P&H CororpPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM Engineering6244703/11/2025
Factory Engineering Works8855304/18/2024
Building Lifecycle
All (106)Filed (13)Permit Issued (9)Signed Off (7)Violation (15)Inspection (6)Objection (26)Special Inspection (30)
11/19/2025
Signed off — Alteration
INSTALL NON-ILLUMINATED AWNING ON FRONT FACE OF BUILDING. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B01281442-I1
09/24/2025
Permit issued — General Construction
B01281442-I1-GC
09/04/2025
Filed — Alteration
INSTALL NON-ILLUMINATED AWNING ON FRONT FACE OF BUILDING. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B01281442-I1
09/03/2025
Special inspection requirement — Final
Kui He
09/03/2025
Special inspection requirement — Energy Code Compliance Inspections
Kui He
03/24/2025
Special inspection requirement — Interior lighting power
NARESH MAHANGU
03/24/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
NARESH MAHANGU
03/24/2025
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
03/24/2025
Special inspection requirement — Maintenance information
NARESH MAHANGU
03/24/2025
Special inspection requirement — Lighting controls
NARESH MAHANGU
03/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
03/24/2025
Special inspection requirement — Masonry
NARESH MAHANGU
03/24/2025
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
03/24/2025
Special inspection requirement — Fenestration areas
NARESH MAHANGU
03/24/2025
Special inspection requirement — Fenestration air leakage
NARESH MAHANGU
03/24/2025
Special inspection requirement — Exterior lighting power
NARESH MAHANGU
03/24/2025
Special inspection requirement — Fire-Resistance Rated Construction
NARESH MAHANGU
03/11/2025
Filed — Alteration CO
Convert existing residential building to community facility house of workship. Obtain a new C of O.
B08000806-P4
03/11/2025
Special inspection requirement — Exterior lighting power
NARESH MAHANGU
03/11/2025
Special inspection requirement — Masonry
NARESH MAHANGU
03/11/2025
Special inspection requirement — Lighting controls
NARESH MAHANGU
03/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
03/11/2025
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
03/11/2025
Special inspection requirement — Maintenance information
NARESH MAHANGU
03/11/2025
Special inspection requirement — Fenestration areas
NARESH MAHANGU
03/11/2025
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
03/11/2025
Special inspection requirement — Interior lighting power
NARESH MAHANGU
03/11/2025
Special inspection requirement — Fire-Resistance Rated Construction
NARESH MAHANGU
03/11/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
NARESH MAHANGU
03/11/2025
Special inspection requirement — Fenestration air leakage
NARESH MAHANGU
02/26/2025
Signed off — Alteration
FILE CONSTRUCTION WORK TO INSTALL TEMPORARY PLATFORM & BRACING SHORING BELOW SCAFFOLD AT 1-STORY ROOF AT REAR. REMOVE ECB VIOLATION #39524115K & #39524116M. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00983422-I1
02/25/2025
Signed off — Alteration CO
Convert existing residential building to community facility house of workship. Obtain a new C of O.
B08000806-S1
02/11/2025
Signed off — Alteration
Install kitchen hood and 4 A/C split unit system. No change in use, occupancy or egress.
B01032301-I1
02/10/2025
Signed off — Alteration
B00950637-I1
02/10/2025
Signed off — Alteration
Plumbing work on Cellar,1st,2nd and 3rd floor. No change in sue, occupancy or egress.
B08013795-I1
09/20/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/17/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
09/11/2024
Permit issued — General Construction
B00983422-I1-GC
07/11/2024
Permit issued — Mechanical Systems
B01032301-I1-MS
06/04/2024
Objection resolved — Addressed
05/24/2024
Signed off — Alteration
HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 BUIILDING CODE.
B00967042-I1
05/14/2024
Objection resolved — Addressed
05/14/2024
Objection resolved — Addressed
05/14/2024
Objection resolved — Addressed
05/14/2024
Objection resolved — Addressed
05/14/2024
Objection resolved — Addressed
05/06/2024
Special inspection requirement — Maintenance information
NARESH MAHANGU
04/29/2024
Objection raised — Admin
04/29/2024
Objection raised — Energy
04/29/2024
Objection raised — Scope
04/29/2024
Objection raised — Inspections
04/29/2024
Objection raised — Scope
04/24/2024
Objection raised — Other
04/18/2024
Filed — Alteration
Install kitchen hood and 4 A/C split unit system. No change in use, occupancy or egress.
B01032301-I1
04/18/2024
Filed — Alteration CO
Convert existing residential building to community facility house of workship. Obtain a new C of O.
B08000806-P3
04/18/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
NARESH MAHANGU
04/18/2024
Special inspection requirement — Fenestration air leakage
NARESH MAHANGU
04/18/2024
Special inspection requirement — Fenestration areas
NARESH MAHANGU
02/29/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/29/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
Latest 60 of 106 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offW Product & Supplies09/24/2025
DOB NOWGeneral ConstructionSigned-offMZX Group09/11/2024
DOB NOWMechanical SystemsSigned-offMZX Group07/11/2024
DOB NOWGeneral ConstructionSigned-offMZX Group01/09/2024
DOB NOWConstruction FenceSigned-offMZX Group11/27/2023
DOB NOWSidewalk ShedSigned-offSafe-Sheild Enterprise11/24/2023
DOB NOWPlumbingSigned-offAmerican Standard P&H Cororp09/26/2023
DOB NOWGeneral ConstructionPermit IssuedMZX Group09/25/2023
DOB NOWStructuralSigned-offMZX Group09/21/2023
1 project · most recent 11/26/2024
General Wiring
FiledStatusContractorScope
11/26/2024CompleteA.C. Morgan ElectricGeneral Wiring
1 project · most recent 03/11/2025
Steel Concrete Masonry
FiledStatusContractorScope
03/11/2025Permit IssuedMZX GroupSteel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
09/20/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/17/2024Fail-Final CND-Occupancy InspectionFailView ↗
02/29/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/29/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/05/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/30/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 73
DateRequirementInspectorRole
09/03/2025FinalKui Heprogress
09/03/2025Energy Code Compliance InspectionsKui Heprogress
03/24/2025Lighting controlsNARESH MAHANGUenergy_progress
03/24/2025Fenestration and door U-factor and product ratingsNARESH MAHANGUenergy_progress
03/24/2025Exterior lighting powerNARESH MAHANGUenergy_progress
03/24/2025MasonryNARESH MAHANGUspecial
03/24/2025Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
03/24/2025Energy Code Compliance InspectionsNARESH MAHANGUprogress
03/24/2025Fire-Resistance Rated ConstructionNARESH MAHANGUprogress
03/24/2025Air barrier - visual inspectionNARESH MAHANGUenergy_progress
03/24/2025Fenestration areasNARESH MAHANGUenergy_progress
03/24/2025Maintenance informationNARESH MAHANGUenergy_progress
03/24/2025Interior lighting powerNARESH MAHANGUenergy_progress
03/24/2025Fenestration air leakageNARESH MAHANGUenergy_progress
03/11/2025Fenestration areasNARESH MAHANGUenergy_progress
03/11/2025MasonryNARESH MAHANGUspecial
03/11/2025Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
03/11/2025Energy Code Compliance InspectionsNARESH MAHANGUprogress
03/11/2025Fire-Resistance Rated ConstructionNARESH MAHANGUprogress
03/11/2025Air barrier - visual inspectionNARESH MAHANGUenergy_progress
03/11/2025Maintenance informationNARESH MAHANGUenergy_progress
03/11/2025Lighting controlsNARESH MAHANGUenergy_progress
03/11/2025Fenestration and door U-factor and product ratingsNARESH MAHANGUenergy_progress
03/11/2025Interior lighting powerNARESH MAHANGUenergy_progress
03/11/2025Fenestration air leakageNARESH MAHANGUenergy_progress
Latest 25 of 73.
▾Documents — 112 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/27/2026B08000806-P2Request digital key ↗
08/27/2026B08000806-P1Request digital key ↗
08/27/2026B08000806-S1Request digital key ↗
Showing 3 of 13 on file for this type
▸Seals & Professional Certifications69
▸DOB NOWProgress Inspector Seal & Signature34
09/12/2026B01281442-I1Open ↗
09/12/2026B01281442-I1Open ↗
09/01/2026B08000806-P1Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature22
09/01/2026B08000806-P1Open ↗
09/01/2026B08000806-P1Open ↗
09/01/2026B08000806-P1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/26/2026B00950637-I1Open ↗
08/26/2026B08013795-I1Open ↗
08/26/2026B08013795-P1Open ↗
Showing 3 of 13 on file for this type
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist4
08/13/2026B08000806-P3Open ↗
08/13/2026B08000806-P2Open ↗
08/13/2026B08000806-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B08000806-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/26/2026B08013795-I1Open ↗
08/26/2026B08013795-P1Open ↗
08/25/2026B01032301-I1Open ↗
Showing 3 of 9 on file for this type
▸Approvals, Objections & Sign-offs12
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter12
08/26/2026B00950637-I1Open ↗
08/13/2026B08013795-I1Open ↗
08/13/2026B08013795-P1Open ↗
Showing 3 of 12 on file for this type
▸Other Documents4
▸DOB NOWProperty Ownership Certification4
08/13/2026B08000806-P2Open ↗
08/13/2026B08000806-I1Open ↗
08/13/2026B08000806-P3Open ↗
Showing 3 of 4 on file for this type