511 EAST 80 STREET
MANHATTAN · Upper East Side-Yorkville · BIN 1050870
💬 Discuss this project
1963Year Built
13Stories
D6Building Class
R8BZoning
166,686 sfGross Floor Area
129Units
LL97 CoveredRent Stabilized10 Open Violations 6 unresolved · 4 paperwork only ▸FISP: SWARMP
Elevator apt, fireproof with stores · Owner of record: 511 EAST 80TH STREET, LLC · 17,885 sf lot · 9.32 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingLandscape
Permit Issued — active, not yet Signed-off
Floor 96p · 1 filing · 20 docs
Floor 8
Floor 76p · 2 filings · 20 docs
Floor 67p · 1 filing · 19 docs
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
CellarUnder Construction6p · 2 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
511 EAST 80TH STREET7208/26/2026
CEPRINE CONSTRUCTION203/22/2026
511 EAST 80 ST LLC503/22/2026
511 E 80TH STREET ASSOCIATES303/22/2026
511 E 80 ST ASSOCIATES403/22/2026
PALIN ENTERPRISES303/22/2026
511 EAST 80ST ASSOCIAT103/22/2026
511 EAST 80 ST ASSOCIA103/22/2026
511 EAST 80TH ASSOCIAT103/22/2026
511 E.80TH ST.ASSOCS103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EDG311/19/2025
SUSTAINABLE DESIGN ENGINEERING PLLC404/18/2024
NS ENGINEERS, P.C.905/02/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
YOUBER DESIGN2603/21/2026
LMS-ACE SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ULAJ INTERIORS CORPGeneral Contractor1007/08/2026
THOMAS MAINTENANCE INCGeneral Contractor408/26/2026
PACE PLUMBING CORPPlumbing307/08/2026
ZORAN VUJICICElectrical203/21/2026
PIETANZA, JOSEPHElectrical103/21/2026
CRESCO ELECTRICAL CORPElectrical103/22/2026
ROSARIO, EDWINElectrical103/21/2026
I.U.O.EElectrical103/21/2026
NYC TRANSITElectrical103/21/2026
PARISI, DINOElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EDG2578311/19/2025
AG ENGINEERING PLLC8899101/04/2025
GREEN RIVER ENVIRONMENTAL7841105/29/2024
JAY KAVI CORPORATION8500404/18/2024
NS ENGINEERS, P.C.1442505/02/2023
SUSTAINABLE DESIGN ENGINE1404212/21/2022
SUNG HO SHIN ARCHITECT2997212/20/2022
Building Lifecycle
All (154)Filed (16)Permit Issued (11)Signed Off (3)Facade (FISP) (15)Violation (60)Inspection (11)Objection (8)Special Inspection (30)
09/16/2026
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
07/17/2026
Permit issued — Structural
M01049161-I1-ST
06/11/2026
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
04/29/2026
Violation issued (HPD, closed)
A
04/18/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/22/2026
Permit issued — Structural
M01100833-I1-GC-CX
12/29/2025
Violation issued (ECB, open)
Unknown
11/19/2025
Filed — Alteration
INSTALLATION OF TEMPORARY SHORING AND NETTING AS PER PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01049161-P1
11/19/2025
Special inspection requirement — Final
Anthony Stasio
11/19/2025
Special inspection requirement — Tenant Protection Plan Compliance
ROBERT MASONE
11/19/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anthony Stasio
11/17/2025
Violation issued (HPD, closed)
I
07/16/2025
Permit issued — Structural
M01049161-I1-ST
04/08/2025
Special inspection requirement — Tenant Protection Plan Compliance
04/08/2025
Special inspection requirement — Final
Anthony Stasio
04/08/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anthony Stasio
03/22/2025
Violation issued (ECB, open)
Construction
03/21/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/04/2025
Filed — Alteration
GARAGE REPAIRS AS PER PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01100833-I1
08/22/2024
Special inspection requirement — Tenant Protection Plan Compliance
ARIEL GOLSHAN
08/22/2024
Special inspection requirement — Concrete - Cast-In-Place
Anthony Stasio
08/22/2024
Special inspection requirement — Final
Anthony Stasio
08/22/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anthony Stasio
08/22/2024
Special inspection requirement — Post-installed Anchors
Anthony Stasio
08/01/2024
Signed off — Alteration
GENERAL CONSTRUCTION TO RENOVATE APT 7AB ON THE 7TH FL TO SUPERSEDE ALT 441-85. WORK WILL INCLUDE NEW PARTITIONS & FINISHES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILNG.
M01027102-I1
07/17/2024
Permit issued — Structural
M01049161-I1-ST
06/07/2024
Permit issued — General Construction
M01027102-I1-GC
05/29/2024
Filed — Alteration
INSTALLATION OF TEMPORARY SHORING AND NETTING AS PER PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01049161-I1
05/06/2024
Objection resolved — Addressed
05/01/2024
Objection raised — Scope
04/18/2024
Filed — Alteration
GENERAL CONSTRUCTION TO RENOVATE APT 7AB ON THE 7TH FL TO SUPERSEDE ALT 441-85. WORK WILL INCLUDE NEW PARTITIONS & FINISHES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILNG.
M01027102-I1
04/17/2024
Special inspection requirement — Tenant Protection Plan Compliance
Jay Kavi
03/28/2024
Special inspection requirement — Final
Kayan Tse
03/28/2024
Special inspection requirement — Energy Code Compliance Inspections
Kenny Mak
08/25/2023
Signed off — Alteration
GENERAL CONSTRUCTION TO RENOVATE APT 7G AND 7H ON THE 7TH FLOOR (RENAME 7GH). WORK WILL INCLUDE NEW PARTITIONS & FINISHES, AND NEW PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
M00815537-I1
08/22/2023
Signed off — Alteration
GENERAL CONSTRUCTION TO RENOVATE APT 7G AND 7H ON THE 7TH FLOOR (RENAME 7GH). WORK WILL INCLUDE NEW PARTITIONS & FINISHES, AND NEW PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
M00815537-S1
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/01/2023
Violation issued (HPD, closed)
C
05/04/2023
Special inspection requirement — Energy Code Compliance Inspections
Shamsul Siddique
05/04/2023
Special inspection requirement — Final
Shamsul Siddique
05/04/2023
Special inspection requirement — Tenant Protection Plan Compliance
Jay Kavi
05/04/2023
Special inspection requirement — Lighting in dwelling units
Shamsul Siddique
05/04/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shamsul Siddique
05/02/2023
Filed — Alteration
GENERAL CONSTRUCTION TO RENOVATE APT 7G AND 7H ON THE 7TH FLOOR (RENAME 7GH). WORK WILL INCLUDE NEW PARTITIONS & FINISHES, AND NEW PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
M00815537-P3
04/12/2023
Filed — Alteration
GENERAL CONSTRUCTION TO RENOVATE APT 7G AND 7H ON THE 7TH FLOOR (RENAME 7GH). WORK WILL INCLUDE NEW PARTITIONS & FINISHES, AND NEW PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
M00815537-P4
04/07/2023
Special inspection requirement — Lighting in dwelling units
Shamsul Siddique
04/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shamsul Siddique
04/07/2023
Special inspection requirement — Tenant Protection Plan Compliance
04/07/2023
Special inspection requirement — Energy Code Compliance Inspections
Shamsul Siddique
04/07/2023
Special inspection requirement — Final
Shamsul Siddique
04/07/2023
Special inspection requirement — Tenant Protection Plan Compliance
03/29/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/29/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/20/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/16/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/13/2023
Permit issued — Plumbing
M00815537-S1-PL
02/25/2023
Filed — Alteration
GENERAL CONSTRUCTION TO RENOVATE APT 7G AND 7H ON THE 7TH FLOOR (RENAME 7GH). WORK WILL INCLUDE NEW PARTITIONS & FINISHES, AND NEW PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
M00815537-P2
02/25/2023
Filed — Alteration
GENERAL CONSTRUCTION TO RENOVATE APT 7G AND 7H ON THE 7TH FLOOR (RENAME 7GH). WORK WILL INCLUDE NEW PARTITIONS & FINISHES, AND NEW PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
M00815537-P1
Latest 60 of 154 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedTHOMAS MAINTENANCE INC07/17/2026
DOB NOWStructuralPermit IssuedTHOMAS MAINTENANCE INC01/22/2026
DOB NOWStructuralPermit IssuedTHOMAS MAINTENANCE INC07/16/2025
DOB NOWStructuralPermit IssuedTHOMAS MAINTENANCE INC07/17/2024
DOB NOWGeneral ConstructionSigned-offULAJ INTERIORS CORP06/07/2024
DOB NOWPlumbingSigned-offPACE PLUMBING CORP03/13/2023
DOB NOWGeneral ConstructionSigned-offULAJ INTERIORS CORP02/13/2023
DOB NOWPlumbingSigned-offPACE PLUMBING CORP01/20/2023
DOB NOWGeneral ConstructionPermit IssuedULAJ INTERIORS CORP12/05/2022
DOB NOWPlumbingSigned-offPACE PLUMBING CORP10/25/2022
DOB NOWGeneral ConstructionPermit IssuedULAJ INTERIORS CORP10/19/2022
BISOTISSUEDCERINA GENERAL CONTR INC09/16/2016
BISOTISSUEDCERINA GENERAL CONTR INC09/08/2016
BISEQISSUEDCEPRINE CONSTRUCTION INC08/26/2016
BISEQISSUEDCEPRINE CONSTRUCTION INC08/02/2016
BISEQISSUEDCEPRINE CONSTRUCTION INC09/17/2015
BISEQISSUEDCEPRINE CONSTRUCTION INC09/09/2015
BISOTISSUEDCERINA GENERAL CONTR INC09/09/2015
BISEQISSUEDCEPRINE CONSTRUCTION INC09/27/2014
BISOTISSUEDCERINA GENERAL CONTR INC09/17/2014
BISEQISSUEDCEPRINE CONSTRUCTION INC09/17/2014
BISOTISSUEDCERINA GENERAL CONTR INC06/06/2014
BISOTISSUEDRITEWAY TANK MAINTENANCE01/21/2014
BISEQISSUEDCEPRINE CONSTRUCTION INC11/18/2013
BISEQISSUEDCEPRINE CONSTRUCTION INC11/13/2013
BISMHISSUEDCRYSTAL COMFORT INC02/08/2013
BISBLISSUEDLEARDON BOILER WORKS.INC01/14/2010
BISOTISSUEDCERINA GENERAL CONTR INC09/26/2003
BISPLISSUEDPACE PLUMB CORP04/18/2003
BISOTISSUEDMATILDA CONSTRUCTION INC04/07/2003
BISEQISSUEDCERINA GENERAL CONTR INC10/22/2002
BISMHISSUEDCRYSTAL COMFORT INC04/19/2002
BISEQISSUEDSPRING ENTERPRIS INC.03/16/2000
BISPLISSUEDSIGNORE & SONS PLBG CORP04/12/1999
BISOTISSUEDTERRA FIRMA CONSTRUCTION01/22/1998
BISPLISSUEDSIGNORE & SONS PLBG CORP02/03/1997
BISOTISSUEDFRANK TERRY CONSTRUCTION11/08/1996
BISEQISSUEDATLANTIC SCAFFOLDING04/23/1996
BISMHISSUEDCRYSTAL COMFORT11/01/1995
1 project · most recent 12/21/2022
Gas Water/Sanitary
FiledStatusContractorScope
12/21/2022Signed-offPACE PLUMBING CORPGas, Water/Sanitary
4 projects · most recent 04/26/2023
General Wiring
FiledStatusContractorScope
04/26/2023CompleteCRESCO ELECTRICAL CORPGeneral Wiring
02/15/2023CompleteCRESCO ELECTRICAL CORPGeneral Wiring
12/30/2022CompleteCRESCO ELECTRICAL CORPGeneral Wiring
12/15/2020CompleteP.S. MARCATO ELEV. CO INC—
2 projects · most recent 11/19/2025
Concrete
FiledStatusContractorScope
11/19/2025Permit IssuedTHOMAS MAINTENANCE INC2 scope_items
01/04/2025Permit IssuedTHOMAS MAINTENANCE INCConcrete
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
09/16/2026Fail-Final PL - Up to 9 Requested FloorsFailView ↗
06/11/2026Fail-Final PL - Up to 9 Requested FloorsFailView ↗
04/18/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/21/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/29/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/29/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/20/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/16/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/27/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/26/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/02/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 50
DateRequirementInspectorRole
11/19/2025FinalAnthony Stasioprogress
11/19/2025Tenant Protection Plan ComplianceROBERT MASONEspecial
11/19/2025Structural Stability – Alterations of existing buildingsAnthony Stasiospecial
04/08/2025Tenant Protection Plan Compliance—special
04/08/2025FinalAnthony Stasioprogress
04/08/2025Structural Stability – Alterations of existing buildingsAnthony Stasiospecial
08/22/2024Tenant Protection Plan ComplianceARIEL GOLSHANspecial
08/22/2024Concrete - Cast-In-PlaceAnthony Stasiospecial
08/22/2024FinalAnthony Stasioprogress
08/22/2024Structural Stability – Alterations of existing buildingsAnthony Stasiospecial
08/22/2024Post-installed AnchorsAnthony Stasiospecial
04/17/2024Tenant Protection Plan ComplianceJay Kavispecial
03/28/2024FinalKayan Tseprogress
03/28/2024Energy Code Compliance InspectionsKenny Makprogress
05/04/2023Energy Code Compliance InspectionsShamsul Siddiqueprogress
05/04/2023FinalShamsul Siddiqueprogress
05/04/2023Tenant Protection Plan ComplianceJay Kavispecial
05/04/2023Lighting in dwelling unitsShamsul Siddiqueenergy_progress
05/04/2023Fire-Resistant Penetrations and JointsShamsul Siddiquespecial
04/07/2023Lighting in dwelling unitsShamsul Siddiqueenergy_progress
04/07/2023Fire-Resistant Penetrations and JointsShamsul Siddiquespecial
04/07/2023Tenant Protection Plan Compliance—special
04/07/2023Energy Code Compliance InspectionsShamsul Siddiqueprogress
04/07/2023FinalShamsul Siddiqueprogress
04/07/2023Tenant Protection Plan Compliance—special
Latest 25 of 50.
▾Documents — 227 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
09/01/2026M00794485-S1Request digital key ↗
09/01/2026M08021201-P1Request digital key ↗
09/01/2026M08021201-S1Request digital key ↗
Showing 3 of 16 on file for this type
▸Applications & Permits26
▸BISPLAN / WORK APPROVAL APPLICATION13
10/06/2016140134209Open ↗
09/25/2016140134209Open ↗
09/05/2016122783327Open ↗
Showing 3 of 13 on file for this type
▸BISWORK PERMIT APPLICATION13
09/22/2016122783327Open ↗
09/02/2016140134209Open ↗
08/01/2016140529382Open ↗
Showing 3 of 13 on file for this type
▸Seals & Professional Certifications90
▸DOB NOWProgress Inspector Seal & Signature26
09/23/2026M08021201-I1Open ↗
09/23/2026M08021201-I1Open ↗
09/23/2026M08021201-I1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
09/23/2026M08021201-I1Open ↗
09/23/2026M08021201-I1Open ↗
09/18/2026M00815537-P1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
09/01/2026M00794485-I1Open ↗
09/01/2026M08021201-I1Open ↗
09/01/2026M08021201-S1Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION14
04/27/2017122783327Open ↗
04/27/2017122783327Open ↗
10/06/2016140134209Open ↗
Showing 3 of 14 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
08/01/2016140529382Open ↗
01/16/2014140146312Open ↗
11/18/2013140135985Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
08/01/2016140529382Open ↗
01/16/2014140146312Open ↗
11/18/2013140135985Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
08/01/2016140529382Open ↗
01/16/2014140146312Open ↗
11/18/2013140135985Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
02/12/2013121522218Open ↗
01/11/2010120241416Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
02/12/2013121522218Open ↗
01/11/2010120241416Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
01/16/2014140146312Open ↗
01/11/2010120241416Open ↗
▸BISEQUIPMENT USE PERMITS1
10/23/2013121522218Open ↗
▸BISEQUIPMENT USE APPLICATION-PERMIT1
10/22/2013121522218Open ↗
▸Safety & Tenant Protection4
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
08/23/2016122783327Open ↗
08/03/2016122783327Open ↗
▸BISTenant Protection Plan and Notes2
08/03/2016122783327Open ↗
08/01/2016140529382Open ↗
▸Environmental & Asbestos22
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
09/01/2026M08021201-P1Open ↗
09/01/2026M08021201-S1Open ↗
09/01/2026M08021201-I1Open ↗
Showing 3 of 14 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
08/03/2016122783327Open ↗
08/01/2016140529382Open ↗
04/30/2014121926899Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
10/08/2011120832028Open ↗
01/11/2010120241416Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
02/12/2013121522218Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
04/27/2017122783327Open ↗
05/12/2016121926899Open ↗
01/06/2016140146312Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
04/27/2017122783327Open ↗
05/12/2016121926899Open ↗
01/06/2016140146312Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
01/16/2014140146312Open ↗
▸BISTECHNICAL REPORT: ENERGY1
10/08/2011120832028Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
11/13/2013140134209Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
01/16/2014140146312Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
08/01/2016140529382Open ↗
11/18/2013140135985Open ↗
11/13/2013140134209Open ↗
▸Approvals, Objections & Sign-offs20
▸BISLETTERS - SUPPORTING DOCUMENTATION11
09/02/2016122783327Open ↗
09/02/2016122783327Open ↗
09/02/2016122783327Open ↗
Showing 3 of 11 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
04/27/2017122783327Open ↗
06/01/2016140135985Open ↗
05/12/2016121926899Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
02/12/2013121522218Open ↗
10/08/2011120832028Open ↗
01/11/2010120241416Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT10
04/27/2017122783327Open ↗
08/03/2016122783327Open ↗
05/12/2016121926899Open ↗
Showing 3 of 10 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE1
09/02/2016122783327Open ↗
▸Filing & Intake Forms16
▸BISADDITIONAL INFORMATION7
11/17/2016140529382Open ↗
10/06/2016140134209Open ↗
01/04/2016140146312Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET5
08/03/2016122783327Open ↗
04/30/2014121926899Open ↗
02/12/2013121522218Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
08/01/2016140529382Open ↗
01/16/2014140146312Open ↗
11/18/2013140135985Open ↗
Showing 3 of 4 on file for this type
▸Other Documents4
▸BISSupporting Document: Fee Deferment3
09/08/2016140134209Open ↗
09/08/2016140134209Open ↗
09/08/2016140134209Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
09/08/2016140134209Open ↗