Roof3p · 2 filings · 19 docs
GeneralMechanicalStructural
Filing herewith for installation of Boilers
On file for this job
17 documents · 2 drawing sheets
INSTALLATION OF TEMPORARY ROOF PROTECTION AT ADJACENT PROPERTIES DURING NB BLDG CONST, FILED SEP. ROOF PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this job
2 documents · 1 drawing sheet
Floor 321p · 1 filing · 10 docs
Architecture
INSTALLATION OF DUAL 6500 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
On file for this job
10 documents · 1 drawing sheet
Floor 311p · 1 filing · 10 docs
Architecture
INSTALLATION OF DUAL 6500 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
On file for this job
10 documents · 1 drawing sheet
Floor 301p · 1 filing · 10 docs
Architecture
INSTALLATION OF DUAL 6500 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
On file for this job
10 documents · 1 drawing sheet
Floor 291p · 1 filing · 10 docs
Architecture
INSTALLATION OF DUAL 6500 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
On file for this job
10 documents · 1 drawing sheet
Floor 281p · 1 filing · 10 docs
Architecture
INSTALLATION OF DUAL 6500 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
On file for this job
10 documents · 1 drawing sheet
Floor 271p · 1 filing · 10 docs
Architecture
INSTALLATION OF DUAL 6500 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
On file for this job
10 documents · 1 drawing sheet
Floor 261p · 1 filing · 10 docs
Architecture
INSTALLATION OF DUAL 6500 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
On file for this job
10 documents · 1 drawing sheet
Floor 251p · 1 filing · 10 docs
Architecture
INSTALLATION OF DUAL 6500 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
On file for this job
10 documents · 1 drawing sheet
Floor 241p · 1 filing · 10 docs
Architecture
INSTALLATION OF DUAL 6500 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
On file for this job
10 documents · 1 drawing sheet
Floor 231p · 1 filing · 10 docs
Architecture
INSTALLATION OF DUAL 6500 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
On file for this job
10 documents · 1 drawing sheet
Floor 221p · 1 filing · 10 docs
Architecture
INSTALLATION OF DUAL 6500 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
On file for this job
10 documents · 1 drawing sheet
Floor 211p · 1 filing · 10 docs
Architecture
INSTALLATION OF DUAL 6500 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
On file for this job
10 documents · 1 drawing sheet
Floor 204p · 2 filings · 14 docs
ArchitectureGeneral
This application is filed for a Temporary Use Permit for a sales office including model apartments pursuant to section AC 28-111 and Buildings Bulletin 2010-002. In conjunction with NB# 121205640
On file for this job
4 documents · 3 drawing sheets
INSTALLATION OF DUAL 6500 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
On file for this job
10 documents · 1 drawing sheet
Floor 191p · 1 filing · 10 docs
Architecture
INSTALLATION OF DUAL 6500 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
On file for this job
10 documents · 1 drawing sheet
Floor 181p · 1 filing · 10 docs
Architecture
INSTALLATION OF DUAL 6500 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
On file for this job
10 documents · 1 drawing sheet
Floor 171p · 1 filing · 10 docs
Architecture
INSTALLATION OF DUAL 6500 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
On file for this job
10 documents · 1 drawing sheet
Floor 161p · 1 filing · 10 docs
Architecture
INSTALLATION OF DUAL 6500 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
On file for this job
10 documents · 1 drawing sheet
Floor 151p · 1 filing · 10 docs
Architecture
INSTALLATION OF DUAL 6500 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
On file for this job
10 documents · 1 drawing sheet
Floor 141p · 1 filing · 10 docs
Architecture
INSTALLATION OF DUAL 6500 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
On file for this job
10 documents · 1 drawing sheet
Floor 131p · 1 filing · 10 docs
Architecture
INSTALLATION OF DUAL 6500 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
On file for this job
10 documents · 1 drawing sheet
Floor 121p · 1 filing · 10 docs
Architecture
INSTALLATION OF DUAL 6500 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
On file for this job
10 documents · 1 drawing sheet
Floor 111p · 1 filing · 10 docs
Architecture
INSTALLATION OF DUAL 6500 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
On file for this job
10 documents · 1 drawing sheet
Floor 101p · 1 filing · 10 docs
Architecture
INSTALLATION OF DUAL 6500 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
On file for this job
10 documents · 1 drawing sheet
Floor 91p · 1 filing · 3 docs
Structural
Temporary Dry Construction Standpipe in conjunction with NB# 121205640
On file for this job
3 documents · 1 drawing sheet
Floor 83p · 2 filings · 13 docs
ArchitectureFire ProtectionStructural
Temporary Dry Construction Standpipe in conjunction with NB# 121205640
On file for this job
3 documents · 1 drawing sheet
INSTALLATION OF DUAL 6500 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
On file for this job
10 documents · 2 drawing sheets
Floor 73p · 2 filings · 13 docs
ArchitectureFire ProtectionStructural
Temporary Dry Construction Standpipe in conjunction with NB# 121205640
On file for this job
3 documents · 1 drawing sheet
INSTALLATION OF DUAL 6500 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
On file for this job
10 documents · 2 drawing sheets
Floor 65p · 3 filings · 16 docs
ArchitectureFire ProtectionStructural
Temporary Dry Construction Standpipe in conjunction with NB# 121205640
On file for this job
3 documents · 2 drawing sheets
Install new Sprinkler, Standpipe System in conjunction with New Building application 121205640. Standpipe is designed to meet Class I requirements.
On file for this job
3 documents · 1 drawing sheet
INSTALLATION OF DUAL 6500 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
On file for this job
10 documents · 2 drawing sheets
Floor 54p · 3 filings · 16 docs
ArchitectureFire ProtectionStructural
Temporary Dry Construction Standpipe in conjunction with NB# 121205640
On file for this job
3 documents · 1 drawing sheet
Install new Sprinkler, Standpipe System in conjunction with New Building application 121205640. Standpipe is designed to meet Class I requirements.
On file for this job
3 documents · 1 drawing sheet
INSTALLATION OF DUAL 6500 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
On file for this job
10 documents · 2 drawing sheets
Floor 44p · 3 filings · 16 docs
ArchitectureFire ProtectionStructural
Temporary Dry Construction Standpipe in conjunction with NB# 121205640
On file for this job
3 documents · 1 drawing sheet
Install new Sprinkler, Standpipe System in conjunction with New Building application 121205640. Standpipe is designed to meet Class I requirements.
On file for this job
3 documents · 1 drawing sheet
INSTALLATION OF DUAL 6500 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
On file for this job
10 documents · 2 drawing sheets
Floor 37p · 4 filings · 20 docs
ArchitectureFire ProtectionStructural
This application is filed for a Temporary Use Permit for a sales office including model apartments pursuant to section AC 28-111 and Buildings Bulletin 2010-002. In conjunction with NB# 121205640
On file for this job
4 documents · 1 drawing sheet
Temporary Dry Construction Standpipe in conjunction with NB# 121205640
On file for this job
3 documents · 2 drawing sheets
Install new Sprinkler, Standpipe System in conjunction with New Building application 121205640. Standpipe is designed to meet Class I requirements.
On file for this job
3 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 25p · 2 filings · 6 docs
Fire ProtectionStructural
Temporary Dry Construction Standpipe in conjunction with NB# 121205640
On file for this job
3 documents · 3 drawing sheets
Install new Sprinkler, Standpipe System in conjunction with New Building application 121205640. Standpipe is designed to meet Class I requirements.
On file for this job
3 documents · 2 drawing sheets
Floor 12p · 2 filings · 13 docs
Fire ProtectionMechanical
INSTALLATION OF PIPE SCAFFOLDING AND NEEDLE BEAMS AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
On file for this job
10 documents · 1 drawing sheet
Install new Sprinkler, Standpipe System in conjunction with New Building application 121205640. Standpipe is designed to meet Class I requirements.
On file for this job
3 documents · 1 drawing sheet
Cellar2p · 2 filings · 6 docs
Fire Protection
Temporary Dry Construction Standpipe in conjunction with NB# 121205640
On file for this job
3 documents · 1 drawing sheet
Install new Sprinkler, Standpipe System in conjunction with New Building application 121205640. Standpipe is designed to meet Class I requirements.
On file for this job
3 documents · 1 drawing sheet