← Back
Predominantly retail with other uses
5119 4 AVENUE
BROOKLYN · BIN 3013533
💬 Discuss this project
1922Year Built
3Stories
K4Building Class
R7AZoning
15,000 sfGross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Predominantly retail with other uses · Owner of record: FOURTH SUNSET LLC · 5,000 sf lot · 3 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivilGeneral
Roof5p · 3 filings · 20 docs
Floor 331p · 5 filings · 20 docs
Floor 229p · 2 filings · 20 docs
Floor 12p · 2 filings · 17 docs
Cellar3p · 2 filings · 20 docs
Basement2p · 1 filing · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PLATINUM SERVICES NY703/22/2026
SS & MALIK CONTRACTING103/22/2026
S&B 4TH AVE REALTY203/22/2026
S 2 B 4 AVENUE REALTY103/22/2026
S & B 4 AVE REALTY CORP1803/22/2026
FOURTH SUNSET LLC103/22/2026
KAJ NY CONSTRUCTION203/21/2026
SS A MALIK CONTRACTING203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/25/2023$4.8M—S. & B. 4TH AVENUE REALTY CORP. → FOURTH SUNSET LLC$317/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STUDIO HUJI106/25/2026
YOU GAO103/23/2026
GENARO URUETA202/25/2026
MSM ENGINEERING SERVICES, PLLC408/05/2025
ANDREW KATZ ENGINEERS207/14/2025
PRAMODRAY SHAH, P.E.207/03/2025
SELF EMPLOYED212/03/2024
ASHRAF CORP203/06/2024
SR HARWOOD CONSULTING ENGINEERING309/05/2023
BITOPI CONSULTANTS LLC109/04/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUPERIOR FIRE CONTROL103/21/2026
AVALON DESIGNS3003/21/2026
PLATINUM SERVICES NY403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYC RENOVATION MGMT INCGeneral Contractor807/08/2026
LN NY SERVICING INCGeneral Contractor603/21/2026
PLATINUM SERVICES NY LLCGeneral Contractor303/21/2026
RRP PLUMBING CORPFire Protection207/08/2026
RRP PLUMBING CORPPlumbing207/08/2026
SUPERIOR FIRE CONTROL INCGeneral Contractor104/09/2026
NEPTUNE SIGNS AWNINGSScaffold107/08/2026
FIVE STAR AWNINGS INCGeneral Contractor107/03/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
YOU GAO9407103/23/2026
SHAHRISH SHUVO ENGINEERIN8524202/25/2026
AA BUILDING & INSPECTION1519508/05/2025
DAVID KATZ, P.E.6087207/14/2025
BUTTERFIELD & O'CONNOR4189407/03/2025
M. INT'L ENGINEERING PLLC3129309/05/2023
BITOPI CONSULTANTS LLC7036109/04/2021
Building Lifecycle
All (139)Filed (20)Permit Issued (15)Signed Off (11)Violation (42)Inspection (7)Objection (14)Special Inspection (30)
07/29/2026
Signed off — Alteration
NON-ILLUMINATED NON-ADVERTISING ACCESSORY AWNING - 411 52ND ST. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B01398740-I1
07/01/2026
Permit issued — General Construction
B01398740-I1-GC
06/25/2026
Filed — Alteration
NON-ILLUMINATED NON-ADVERTISING ACCESSORY AWNING - 411 52ND ST. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B01398740-I1
06/25/2026
Special inspection requirement — Final
Ryan Hung
05/15/2026
Signed off — Alteration
ERECT AN ILLUMINATED SIGN ON WALL.NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01370001-I1
05/14/2026
Permit issued — Sign
B01370001-I1-SG
03/23/2026
Filed — Alteration
ERECT AN ILLUMINATED SIGN ON WALL.NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01370001-I1
03/10/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
You Gao
03/10/2026
Special inspection requirement — Final
You Gao
03/04/2026
Signed off — Alteration CO
PROPOSED INTERIOR RENOVATION TO EXISTING 3-STORY BUILDING. SCOPE OF WORK TO INCLUDE NEWPARTITIONS, PLUMBING, LIGHTING AND USE ON 2ND AND 3RD FLOORS ONLY. NO CHANGES TO 1ST FLOOR OR ROOF.
B01158420-I1
02/25/2026
Filed — Alteration CO
PROPOSED INTERIOR RENOVATION TO EXISTING 3-STORY BUILDING. SCOPE OF WORK TO INCLUDE NEWPARTITIONS, PLUMBING, LIGHTING AND USE ON 2ND AND 3RD FLOORS ONLY. NO CHANGES TO 1ST FLOOR OR ROOF.
B01158420-P2
02/25/2026
Special inspection requirement — Interior lighting power
Shahrish Shuvo
02/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
02/25/2026
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
02/25/2026
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
02/25/2026
Special inspection requirement — Lighting controls
Shahrish Shuvo
02/25/2026
Special inspection requirement — Maintenance information
Shahrish Shuvo
01/07/2026
Signed off — Alteration
B00566079-I1
09/03/2025
Signed off — Alteration
PLUMBING WORK FOR AN EXISTING 3 STORIED COMMERCIAL BUILDING SCOPE OF WORK INCLUDES- INSTALLATION OF NEW TOILETS, SINKS AND DRAINS AND INSTALLATION OF NEW GAS METER AND GAS WORK AS NEEDED.
B01048851-I1
08/19/2025
Signed off — Alteration
AUTOMATIC SPRINKLER PROTECTION. CO-ORDINATION BETWEEN THE EXISTING/PROPOSING PLUMBING PIPE LAYOUT/ HVAC DUCT LAYOUT TO BE DONE ON SITE BY THE CONTRACTOR
B00921587-I1
08/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
08/05/2025
Filed — Alteration
PLUMBING WORK FOR AN EXISTING 3 STORIED COMMERCIAL BUILDING SCOPE OF WORK INCLUDES- INSTALLATION OF NEW TOILETS, SINKS AND DRAINS AND INSTALLATION OF NEW GAS METER AND GAS WORK AS NEEDED.
B01048851-P2
07/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
07/24/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/17/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/15/2025
Signed off — Alteration
mechanical modifications for existing 3 story commercial. no change in use egress or occupancy under this application.
B01157565-I1
07/14/2025
Filed — Alteration
mechanical modifications for existing 3 story commercial. no change in use egress or occupancy under this application.
B01157565-P1
07/14/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
David Katz
07/14/2025
Special inspection requirement — HVAC-R and service water heating equipment
David Katz
07/14/2025
Special inspection requirement — Maintenance information
David Katz
07/14/2025
Special inspection requirement — Mechanical Systems
David Katz
07/14/2025
Special inspection requirement — Heating Systems
David Katz
07/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
David Katz
07/14/2025
Special inspection requirement — Energy Code Compliance Inspections
David Katz
07/14/2025
Special inspection requirement — Final
David Katz
07/14/2025
Special inspection requirement — HVAC-R and service water heating system controls
David Katz
07/10/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/09/2025
Special inspection requirement — Final
David Katz
07/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
David Katz
07/09/2025
Special inspection requirement — HVAC-R and service water heating system controls
David Katz
07/09/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
David Katz
07/09/2025
Special inspection requirement — Maintenance information
David Katz
07/09/2025
Special inspection requirement — Mechanical Systems
David Katz
07/09/2025
Special inspection requirement — Energy Code Compliance Inspections
David Katz
07/09/2025
Special inspection requirement — HVAC-R and service water heating equipment
David Katz
07/09/2025
Special inspection requirement — Heating Systems
David Katz
07/03/2025
Filed — Alteration
AUTOMATIC SPRINKLER PROTECTION. CO-ORDINATION BETWEEN THE EXISTING/PROPOSING PLUMBING PIPE LAYOUT/ HVAC DUCT LAYOUT TO BE DONE ON SITE BY THE CONTRACTOR
B00921587-P1
07/03/2025
Special inspection requirement — Post-installed Anchors
Younes Abouyaala
06/20/2025
Signed off — Alteration
Supersede application 340549589, Replace lintels, brick-pointing as needed. Glazing where needed.
B01032043-I1
05/14/2025
Permit issued — Plumbing
B01048851-I1-PL
04/03/2025
Permit issued — General Construction
B01032043-I1-GC
02/27/2025
Signed off — Alteration
MODIFICATION IN STAIRS, NEW ELEVATOR AT 5119 4TH AVENUE.NO CHANGE OF USE EGRESS OR OCCUPANCY.
B00905257-S1
02/26/2025
Permit issued — General Construction
B01158420-I1-GC
02/18/2025
Objection resolved — Addressed
02/06/2025
Objection resolved — Addressed
01/20/2025
Objection resolved — Addressed
01/20/2025
Objection resolved — Addressed
01/14/2025
Objection resolved — Addressed
01/14/2025
Objection resolved — Addressed
01/14/2025
Objection resolved — Addressed
Latest 60 of 139 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offFIVE STAR AWNINGS INC07/01/2026
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC05/14/2026
DOB NOWPlumbingSigned-offRRP PLUMBING CORP05/14/2025
DOB NOWGeneral ConstructionSigned-offLN NY SERVICING INC04/03/2025
DOB NOWGeneral ConstructionPermit IssuedNYC RENOVATION MGMT INC02/26/2025
DOB NOWMechanical SystemsSigned-offNYC RENOVATION MGMT INC12/31/2024
DOB NOWSprinklersSigned-offRALPH W. LANDOLFI JR.08/29/2024
DOB NOWGeneral ConstructionSigned-offNYC RENOVATION MGMT INC08/23/2024
DOB NOWPlumbingSigned-offRRP PLUMBING CORP05/15/2024
DOB NOWGeneral ConstructionSigned-offLN NY SERVICING INC04/10/2024
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC10/03/2023
DOB NOWGeneral ConstructionSigned-offNYC RENOVATION MGMT INC09/19/2023
DOB NOWSprinklersSigned-offRALPH W. LANDOLFI JR.09/06/2023
DOB NOWStructuralSigned-offNYC RENOVATION MGMT INC07/24/2023
DOB NOWMechanical SystemsSigned-offSUPERIOR FIRE CONTROL INC09/09/2021
BISOTISSUEDSS & A MALIK CONTRACTING10/03/2017
BISEQISSUEDKAJ NY CONSTRUCTION INC08/25/2017
BISBLISSUEDK & BH PLUMBING & HTG INC08/17/2005
BISPLISSUEDK & BH PLUMBING & HTG INC08/17/2005
BISEQISSUEDTENACITY EQUIPMENT & GENERAL CON06/01/2005
BISMHISSUEDTENACITY EQUIPMENT & GENERAL CON06/01/2005
BISMHISSUEDCONTINENTAL CORP10/28/2004
BISPLISSUEDSEICKEL AND SONS PLUMBING INC.11/13/1992
BISMHISSUEDSEICKEL AND SONS PLUMBING INC.11/13/1992
5 projects · most recent 04/01/2026
General Wiring
FiledStatusContractorScope
04/01/2026CompleteA ELECTRICAL MAIN SVC INC—
09/10/2025CompleteFIRST STAR ELECTRIC INC5 meters
08/14/2025CompleteFIRST STAR ELECTRIC INCGeneral Wiring
02/06/2024CompleteJAM ELECTRICAL CORP—
09/28/2023CompleteILLUMINOUS ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
07/24/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/17/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/10/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/20/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/20/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/04/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/29/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 59
DateRequirementInspectorRole
06/25/2026FinalRyan Hungprogress
03/10/2026Structural Stability – Alterations of existing buildingsYou Gaospecial
03/10/2026FinalYou Gaoprogress
02/25/2026Interior lighting powerShahrish Shuvoenergy_progress
02/25/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
02/25/2026Energy Code Compliance InspectionsShahrish Shuvoprogress
02/25/2026Fire-Resistance Rated ConstructionShahrish Shuvoprogress
02/25/2026Lighting controlsShahrish Shuvoenergy_progress
02/25/2026Maintenance informationShahrish Shuvoenergy_progress
08/07/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
07/30/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
07/14/2025HVAC-R and service water piping design and insulationDavid Katzenergy_progress
07/14/2025HVAC-R and service water heating equipmentDavid Katzenergy_progress
07/14/2025Maintenance informationDavid Katzenergy_progress
07/14/2025Mechanical SystemsDavid Katzspecial
07/14/2025Heating SystemsDavid Katzspecial
07/14/2025Fire-Resistant Penetrations and JointsDavid Katzspecial
07/14/2025Energy Code Compliance InspectionsDavid Katzprogress
07/14/2025FinalDavid Katzprogress
07/14/2025HVAC-R and service water heating system controlsDavid Katzenergy_progress
07/09/2025FinalDavid Katzprogress
07/09/2025Fire-Resistant Penetrations and JointsDavid Katzspecial
07/09/2025HVAC-R and service water heating system controlsDavid Katzenergy_progress
07/09/2025HVAC-R and service water piping design and insulationDavid Katzenergy_progress
07/09/2025Maintenance informationDavid Katzenergy_progress
Latest 25 of 59.
▾Documents — 121 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch17
09/01/2026B00566079-I1Request digital key ↗
08/26/2026B00921587-P1Request digital key ↗
08/26/2026B00921587-I1Request digital key ↗
Showing 3 of 17 on file for this type
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION5
07/02/2025340536824Open ↗
06/25/2025340549589Open ↗
03/26/2024340549589Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION3
03/26/2024340549589Open ↗
10/02/2017340549589Open ↗
08/23/2017340536824Open ↗
▸Seals & Professional Certifications67
▸DOB NOWSpecial Inspector Seal & Signature30
09/02/2026B01048851-P2Open ↗
09/02/2026B01157565-P1Open ↗
09/01/2026B00905257-P2Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/26/2026B00921587-I1Open ↗
08/26/2026B00905257-P1Open ↗
08/26/2026B00905257-S1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/02/2026B01157565-P1Open ↗
09/02/2026B01157565-P1Open ↗
09/01/2026B01398740-I1Open ↗
Showing 3 of 12 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
10/02/2017340549589Open ↗
08/23/2017340536824Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
10/02/2017340549589Open ↗
08/23/2017340536824Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
10/02/2017340549589Open ↗
08/23/2017340536824Open ↗
▸Safety & Tenant Protection4
▸BISTENANT PROTECTION PLAN AND NOTES2
10/02/2017340549589Open ↗
08/23/2017340536824Open ↗
▸DOB NOWStreet Tree Checklist2
08/13/2026B01158420-P2Open ↗
08/13/2026B01158420-I1Open ↗
▸Environmental & Asbestos17
▸DOB NOWDEP ACP-5: Asbestos Assessment Report16
08/26/2026B00921587-I1Open ↗
08/26/2026B00905257-P2Open ↗
08/26/2026B00905257-I1Open ↗
Showing 3 of 16 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/02/2017340549589Open ↗
▸Energy Compliance2
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
08/23/2017340536824Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/02/2017340549589Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
10/02/2017340549589Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
10/02/2017340549589Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET2
10/02/2017340549589Open ↗
08/23/2017340536824Open ↗
▸Other Documents2
▸DOB NOWProperty Ownership Certification2
08/18/2026B01158420-I1Open ↗
08/18/2026B01158420-P2Open ↗