← Back
Over six families without stores
512 BEACH 130 STREET
QUEENS · BIN 4304073
💬 Discuss this project
1914Year Built
3Stories
C1Building Class
R2Zoning
3,864 sfGross Floor Area
7Units
Rent Stabilized15 Open Violations 13 unresolved · 2 paperwork only ▸FDNY Report ↗
Over six families without stores · Owner of record: MAKMIA 512 B 130 LLC · 6,000 sf lot · 0.64 FAR built · Flood zone AE
Locations of Work
ArchitectureMechanicalPlumbing
Roof4p · 1 filing · 19 docs
Floor 313p · 2 filings · 20 docs
Floor 213p · 2 filings · 20 docs
Floor 19p · 1 filing · 14 docs
Basement5p · 1 filing · 20 docs
Sub-Basement9p · 1 filing · 14 docs
1 job · most recent 07/22/2026
Water/Sanitary
FiledStatusContractorScope
07/22/2026Permit IssuedRITE WAY HEATING CORPWater/Sanitary
1 job · most recent 12/04/2025
FiledStatusContractorScope
12/04/2025Permit IssuedEMPIRE STATE ELECTL CORP10 meters, 9 new_meters
Building Lifecycle
All (105)Filed (10)Permit Issued (10)Signed Off (4)Violation (41)Inspection (4)Objection (6)Special Inspection (30)
08/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
08/05/2026
Signed off — Alteration
INTERIOR RENOVATION AS PER PLANS FILED HEREWITH TO RESOLVE VACATE DUE TO FIRE AND RESTORE TO PRIOR LEGAL CONDITIONS AS A 7 UNIT BUILDING.
Q00540394-I1
08/04/2026
Signed off — Alteration
INTERIOR RENOVATION AS PER PLANS FILED HEREWITH
Q00503839-I1
07/22/2026
Filed — Alteration
PLUMBING WORK TO RESOLVE VIOLATION AS PER PLANS FILED HEREWITH
Q00558869-P2
07/21/2026
Signed off — Alteration
ROOF AND ATTIC RENOVATION TO RESOLVE VACATE ORDER DUE TO FIRE
Q00488110-I1
07/21/2026
Signed off — Alteration
Q01101127-I1
07/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
07/08/2026
Permit issued — General Construction
Q00488110-I1-GC
07/08/2026
Permit issued — Construction Fence
Q01101127-I1-FN
05/07/2026
Violation issued (HPD, open)
A
04/23/2026
Filed — Alteration
INTERIOR RENOVATION AS PER PLANS FILED HEREWITH TO RESOLVE VACATE DUE TO FIRE AND RESTORE TO PRIOR LEGAL CONDITIONS AS A 7 UNIT BUILDING.
Q00540394-P2
04/17/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Jeff Akerman
04/17/2026
Special inspection requirement — Energy Code Compliance Inspections
Jeff Akerman
04/17/2026
Special inspection requirement — Final
SHIMON GREENEBAUM
04/17/2026
Special inspection requirement — Lowest Floor Elevation
Jeff Akerman
04/17/2026
Special inspection requirement — Lowest Floor Elevation
04/17/2026
Special inspection requirement — Fenestration air leakage
Jeff Akerman
04/17/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Jeff Akerman
04/17/2026
Special inspection requirement — Insulation placement and R values
Jeff Akerman
04/17/2026
Special inspection requirement — Interior lighting power
Jeff Akerman
04/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeff Akerman
03/24/2026
Permit issued — General Construction
Q00503839-I1-GC
12/19/2025
Filed — Alteration
PLUMBING WORK TO RESOLVE VIOLATION AS PER PLANS FILED HEREWITH
Q00558869-P1
11/21/2025
Violation issued (HPD, open)
I
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/20/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/20/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/15/2025
Permit issued — Plumbing
Q00558869-I1-PL
08/13/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/12/2025
Violation issued (HPD, open)
A
04/07/2025
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
04/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
04/07/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
04/07/2025
Special inspection requirement — Final
NAVEEN KUMAR
04/07/2025
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
04/07/2025
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
04/07/2025
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
04/07/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
04/07/2025
Special inspection requirement — Air barrier — testing
Younes Abouyaala
04/07/2025
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
04/05/2025
Filed — Alteration
INTERIOR RENOVATION AS PER PLANS FILED HEREWITH TO RESOLVE VACATE DUE TO FIRE AND RESTORE TO PRIOR LEGAL CONDITIONS AS A 7 UNIT BUILDING.
Q00540394-P1
04/05/2025
Filed — Alteration
ROOF AND ATTIC RENOVATION TO RESOLVE VACATE ORDER DUE TO FIRE
Q00488110-P1
04/03/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeff Akerman
04/02/2025
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Jeff Akerman
04/02/2025
Special inspection requirement — Energy Code Compliance Inspections
Jeff Akerman
04/02/2025
Special inspection requirement — Final
SHIMON GREENEBAUM
04/02/2025
Special inspection requirement — Lowest Floor Elevation
Jeff Akerman
04/02/2025
Special inspection requirement — Lowest Floor Elevation
04/02/2025
Special inspection requirement — Insulation placement and R values
Jeff Akerman
04/02/2025
Special inspection requirement — Interior lighting power
Jeff Akerman
09/19/2024
Permit issued — Construction Fence
Q01101127-I1-FN
09/04/2024
Filed — Alteration
Q01101127-I1
08/26/2024
Permit issued — General Construction
Q00540394-I1-GC
08/26/2024
Permit issued — General Construction
Q00488110-I1-GC
08/26/2024
Permit issued — General Construction
Q00503839-I1-GC
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/16/2023
Permit issued — General Construction
Q00540394-I1-GC
Latest 60 of 105 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NACCARATO CONTRACTING507/10/2026
OWNER OF 512 BEACH 130 ST103/22/2026
MAKMIA 512 B 130603/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/07/2024$1.1M—Private party → MAKMIA 512 B 130 LLC$298/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THE ORDERING FORCE707/22/2026
KHALED MOHAMED112/19/2025
OCEAN ENTERPRISES INC.209/04/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
QUICKFAST603/21/2026
JACK JAFFA & ASSOCIATES503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NACCARATO CONTRACTING INCGeneral Contractor907/10/2026
PALM TREE CONSTRUCTION COGeneral Contractor303/21/2026
GO GREEN CONTRACTORS CORPGeneral Contractor107/08/2026
RITE WAY HEATING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519407/22/2026
BIZ DESIGNS LLC6312404/23/2026
AR-TECH ENGINEERING, P.C.6659104/05/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offNACCARATO CONTRACTING INC07/08/2026
DOB NOWConstruction FenceSigned-offNACCARATO CONTRACTING INC07/08/2026
DOB NOWGeneral ConstructionSigned-offNACCARATO CONTRACTING INC03/24/2026
DOB NOWPlumbingPermit IssuedLS PLUMBING CORP08/15/2025
DOB NOWConstruction FenceSigned-offNACCARATO CONTRACTING INC09/19/2024
DOB NOWGeneral ConstructionSigned-offNACCARATO CONTRACTING INC08/26/2024
DOB NOWGeneral ConstructionSigned-offNACCARATO CONTRACTING INC08/26/2024
DOB NOWGeneral ConstructionSigned-offNACCARATO CONTRACTING INC08/26/2024
DOB NOWGeneral ConstructionSigned-offPALM TREE CONSTRUCTION CO05/16/2023
DOB NOWGeneral ConstructionSigned-offGO GREEN CONTRACTORS CORP05/24/2021
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/20/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/20/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/13/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/03/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
08/18/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
07/20/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
04/17/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Jeff Akermanspecial
04/17/2026Energy Code Compliance InspectionsJeff Akermanprogress
04/17/2026FinalSHIMON GREENEBAUMprogress
04/17/2026Lowest Floor ElevationJeff Akermanprogress
04/17/2026Lowest Floor Elevation—progress
04/17/2026Fenestration air leakageJeff Akermanenergy_progress
04/17/2026Fenestration and door U-factor and product ratingsJeff Akermanenergy_progress
04/17/2026Insulation placement and R valuesJeff Akermanenergy_progress
04/17/2026Interior lighting powerJeff Akermanenergy_progress
04/17/2026Fire-Resistant Penetrations and JointsJeff Akermanspecial
04/07/2025Air barrier - visual inspectionYounes Abouyaalaenergy_progress
04/07/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
04/07/2025Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
04/07/2025FinalNAVEEN KUMARprogress
04/07/2025Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
04/07/2025Energy Code Compliance InspectionsYounes Abouyaalaprogress
04/07/2025Fenestration air leakageYounes Abouyaalaenergy_progress
04/07/2025Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
04/07/2025Air barrier — testing Younes Abouyaalaenergy_progress
04/07/2025Insulation placement and R valuesYounes Abouyaalaenergy_progress
04/02/2025Fire-Resistant Penetrations and JointsJeff Akermanspecial
04/02/2025Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Jeff Akermanspecial
04/02/2025Energy Code Compliance InspectionsJeff Akermanprogress
Latest 25 of 43.
▾Documents — 64 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/27/2026Q00503839-I1Request digital key ↗
08/26/2026Q00558869-P2Request digital key ↗
08/26/2026Q00558869-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications33
▸DOB NOWProgress Inspector Seal & Signature13
08/29/2026Q00488110-P1Open ↗
08/29/2026Q00488110-P1Open ↗
08/29/2026Q00488110-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/27/2026Q00503839-I1Open ↗
08/26/2026Q00558869-I1Open ↗
08/21/2026Q01101127-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
08/29/2026Q00488110-P1Open ↗
08/29/2026Q00488110-P1Open ↗
08/28/2026Q00558869-I1Open ↗
Showing 3 of 9 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/27/2026Q00503839-I1Open ↗
08/26/2026Q00558869-I1Open ↗
08/18/2026Q00558869-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/20/2026Q00488110-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/20/2026Q00488110-I1Open ↗
08/15/2026Q00540394-I1Open ↗
▸Approvals, Objections & Sign-offs8
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
08/20/2026Q00488110-I1Open ↗
08/20/2026Q00488110-P1Open ↗
08/18/2026Q00558869-I1Open ↗
Showing 3 of 8 on file for this type
▸Other Documents2
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q00488110-P1Open ↗
08/13/2026Q00488110-I1Open ↗