← Back
General warehouse
512 EAST 74 STREET
💬 Discuss this project
1910Year Built
2Stories
E1Building Class
M1-4Zoning
19,437 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
General warehouse · 10,217 sf lot · 1.9 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof24p · 2 filings · 20 docs
Floor 2111p · 5 filings · 20 docs
Floor 1107p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HOSPITAL FOR SPECIAL SURGERY2407/08/2026
PAMBARTIM REALTY203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FROM ARCHITECTURE DPC604/23/2025
AMA CONSULTING ENGINEERS, PC611/18/2022
CUONO ENGINEERING PLLC203/04/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL EXPEDITING2803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
UGL CORPGeneral Contractor1107/08/2026
RAEL AUTOMATIC SPR.CO INCFire Protection207/08/2026
J. CAIAZZO PLBG & HTG CORPlumbing207/08/2026
T.M.T ELECTRIC INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FUTURE TECH CONSULTANTS O5891111/18/2022
Building Lifecycle
All (131)Filed (14)Permit Issued (9)Signed Off (5)Violation (8)Inspection (9)Objection (56)Special Inspection (30)
11/10/2025
Signed off — Alteration
New roof membrane on existing deck. No change to zoning, use, egress, occupancy.
M00540595-I1
05/15/2025
Special inspection requirement — Final
matteo fraticelli
05/15/2025
Special inspection requirement — Insulation placement and R values
Stephen Marchese
05/06/2025
Objection resolved — Addressed
05/05/2025
Objection raised — Other
04/23/2025
Filed — Alteration
New roof membrane on existing deck. No change to zoning, use, egress, occupancy.
M00540595-P1
04/21/2025
Special inspection requirement — Final
matteo fraticelli
04/21/2025
Special inspection requirement — Insulation placement and R values
Stephen Marchese
03/05/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/26/2025
Signed off — Alteration
Removal and installation of new ductowrk and mechancial equipment to accommodate the warehouse. All work as per plans filed herewith. No change to zoning, use, egress, occupancy.
M00550880-I1
02/26/2025
Signed off — Alteration
Structural work including reinforcement, new foundation for elevator and stair in the existing building, new framing and infill to accommodate removal of skylights, installatio of dunnage for new MEP equipment on the roof, reinforcement of parapet wall.
M00537529-I1
12/04/2024
Violation issued (ECB, closed)
Construction
11/19/2024
Violation issued (FDNY_ORDER, closed)
07/15/2024
Signed off — Alteration
Installation of a new sprinkler system including piping and heads thgoughout the 2 story building to accommodate the warehouse occuapncy; remove existing plumbing and install new plumbing fixtures and piping throughout as per plans.
M00551227-I1
02/01/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/07/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/31/2023
Permit issued — Sprinklers
M00551227-I1-EW-SP
07/28/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/15/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/09/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/06/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/30/2022
Special inspection requirement — Sprinkler Systems
Stephen Marchese
11/30/2022
Special inspection requirement — Post-installed Anchors
Stephen Marchese
11/18/2022
Filed — Alteration
Installation of a new sprinkler system including piping and heads thgoughout the 2 story building to accommodate the warehouse occuapncy; remove existing plumbing and install new plumbing fixtures and piping throughout as per plans.
M00551227-P3
11/10/2022
Special inspection requirement — Sprinkler Systems
Stephen Marchese
11/10/2022
Special inspection requirement — Post-installed Anchors
Stephen Marchese
11/01/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/21/2022
Permit issued — Sprinklers
M00551227-I1-PL
08/08/2022
Permit issued — Foundation
M00537529-I1-GC-CX
07/29/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
06/09/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/24/2022
Filed — Alteration
Installation of a new sprinkler system including piping and heads thgoughout the 2 story building to accommodate the warehouse occuapncy; remove existing plumbing and install new plumbing fixtures and piping throughout as per plans.
M00551227-P2
03/21/2022
Filed — Alteration
Removal and installation of new ductowrk and mechancial equipment to accommodate the warehouse. All work as per plans filed herewith. No change to zoning, use, egress, occupancy.
M00550880-P1
03/11/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Stephen Marchese
03/11/2022
Special inspection requirement — Post-installed Anchors
Stephen Marchese
03/11/2022
Special inspection requirement — Sprinkler Systems
Stephen Marchese
03/11/2022
Special inspection requirement — Final
Stephen Marchese
03/11/2022
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Marchese
03/11/2022
Special inspection requirement — Mechanical Systems
Stephen Marchese
03/11/2022
Special inspection requirement — Duct leakage testing, insulation and design
Stephen Marchese
03/11/2022
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Marchese
03/11/2022
Special inspection requirement — Maintenance information
Stephen Marchese
03/04/2022
Filed — Alteration
Structural work including reinforcement, new foundation for elevator and stair in the existing building, new framing and infill to accommodate removal of skylights, installatio of dunnage for new MEP equipment on the roof, reinforcement of parapet wall.
M00537529-P1
03/04/2022
Special inspection requirement — Final
Young Suh
03/04/2022
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Tony Canale
03/04/2022
Special inspection requirement — Concrete - Cast-In-Place
Stephen Marchese
03/04/2022
Special inspection requirement — Masonry
Stephen Marchese
03/04/2022
Special inspection requirement — Structural Steel - High Strength Bolting
Stephen Marchese
03/04/2022
Special inspection requirement — Structural Steel - Details
Stephen Marchese
03/04/2022
Special inspection requirement — Post-installed Anchors
Stephen Marchese
03/04/2022
Special inspection requirement — Subgrade Inspections
Stephen Marchese
03/04/2022
Special inspection requirement — Structural Steel - Welding
Stephen Marchese
03/04/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Stephen Marchese
03/04/2022
Special inspection requirement — Footing and Foundation
Stephen Marchese
02/24/2022
Special inspection requirement — Masonry
Stephen Marchese
02/24/2022
Special inspection requirement — Concrete - Cast-In-Place
Stephen Marchese
02/23/2022
Filed — Alteration CO
M00510777-P2
12/13/2021
Filed — Alteration
Installation of a new sprinkler system including piping and heads thgoughout the 2 story building to accommodate the warehouse occuapncy; remove existing plumbing and install new plumbing fixtures and piping throughout as per plans.
M00551227-P1
10/06/2021
Filed — Alteration CO
M00510777-P1
09/15/2021
Permit issued — Sprinklers
M00551227-I1-EW-SP
Latest 60 of 131 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offRAEL AUTOMATIC SPR.CO INC10/31/2023
DOB NOWSprinklersSigned-offJ. CAIAZZO PLBG & HTG COR10/21/2022
DOB NOWFoundationSigned-offUGL CORP08/08/2022
DOB NOWSprinklersSigned-offRAEL AUTOMATIC SPR.CO INC09/15/2021
DOB NOWMechanical SystemsSigned-offUGL CORP09/15/2021
DOB NOWSprinklersSigned-offJ. CAIAZZO PLBG & HTG COR09/02/2021
DOB NOWGeneral ConstructionPermit IssuedUGL CORP09/01/2021
DOB NOWGeneral ConstructionSigned-offUGL CORP07/07/2021
DOB NOWGeneral ConstructionSigned-offUGL CORP07/07/2021
BISMHISSUEDCENTERLINE DRISTRIBUTORS INC06/22/1999
BISPLISSUEDROBERT MARTENS PLG & HTG03/06/1996
BISMHISSUEDCENTERLINE DISTRIBUTORS02/06/1996
BISOTISSUEDCONSOLIDATED FLOORING CORP.12/20/1995
2 projects · most recent 07/22/2021
General Wiring
FiledStatusContractorScope
07/22/2021CompleteT.M.T ELECTRIC INC—
06/17/2021Permit IssuedT.M.T ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
02/01/2024Pass-Final CND-Occupancy InspectionPassView ↗
12/07/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/28/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/15/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/09/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/06/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/01/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/29/2022Fail-Final General Construction Non-Directive 14FailView ↗
06/09/2022Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 51
DateRequirementInspectorRole
05/15/2025Finalmatteo fraticelliprogress
05/15/2025Insulation placement and R valuesStephen Marcheseenergy_progress
04/21/2025Finalmatteo fraticelliprogress
04/21/2025Insulation placement and R valuesStephen Marcheseenergy_progress
11/30/2022Sprinkler SystemsStephen Marchesespecial
11/30/2022Post-installed AnchorsStephen Marchesespecial
11/10/2022Sprinkler SystemsStephen Marchesespecial
11/10/2022Post-installed AnchorsStephen Marchesespecial
03/11/2022HVAC-R and service water piping design and insulationStephen Marcheseenergy_progress
03/11/2022Post-installed AnchorsStephen Marchesespecial
03/11/2022Sprinkler SystemsStephen Marchesespecial
03/11/2022FinalStephen Marcheseprogress
03/11/2022HVAC-R and service water heating system controlsStephen Marcheseenergy_progress
03/11/2022Mechanical SystemsStephen Marchesespecial
03/11/2022Duct leakage testing, insulation and designStephen Marcheseenergy_progress
03/11/2022HVAC-R and service water heating equipmentStephen Marcheseenergy_progress
03/11/2022Maintenance informationStephen Marcheseenergy_progress
03/04/2022FinalYoung Suhprogress
03/04/2022Subsurface Investigations (Borings/Test Pits)Tony Canalespecial
03/04/2022Concrete - Cast-In-PlaceStephen Marchesespecial
03/04/2022MasonryStephen Marchesespecial
03/04/2022Structural Steel - High Strength BoltingStephen Marchesespecial
03/04/2022Structural Steel - DetailsStephen Marchesespecial
03/04/2022Post-installed AnchorsStephen Marchesespecial
03/04/2022Subgrade InspectionsStephen Marchesespecial
Latest 25 of 51.
▾Documents — 69 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
09/03/2026M00539850-I1Request digital key ↗
09/03/2026M00537529-P1Request digital key ↗
09/03/2026M00540595-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026M00510777-I1Open ↗
▸Seals & Professional Certifications38
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/03/2026M00537529-I1Open ↗
09/03/2026M00540595-P1Open ↗
09/03/2026M00540595-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/02/2026M00510777-P1Open ↗
09/02/2026M00510777-P1Open ↗
08/29/2026M00539850-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/23/2026M00551227-I1Open ↗
09/23/2026M00551227-I1Open ↗
09/02/2026M00510777-P1Open ↗
Showing 3 of 11 on file for this type
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist3
09/03/2026M00510777-P1Open ↗
09/03/2026M00510777-P2Open ↗
09/03/2026M00510777-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026M00510777-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026M00510777-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
09/03/2026M00540595-I1Open ↗
08/13/2026M00537529-I1Open ↗
08/13/2026M00551227-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.2
09/03/2026M00540595-I1Open ↗
08/13/2026M00550880-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
09/03/2026M00540595-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/15/2026M00537529-I1Open ↗
08/13/2026M00537529-P1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026M00537529-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026M00537529-I1Open ↗