Miscellaneous warehouse
512 GARDNER AVENUE
BROOKLYN · BIN 3429337
💬 Discuss this project
1950Year Built
1Stories
E9Building Class
M3-1Zoning
24,456 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Miscellaneous warehouse · Owner of record: RLF III GARDNER SPE, LLC · 197,188 sf lot · 0.12 FAR built · Flood zone X
Locations of Work
Plumbing
Floor 21p · 1 filing · 3 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
REALTERM1507/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/07/2021$70.0M—R.L.R. INVESTMENTS, L.L.C. → RLF III GARDNER SPE, LLC$2,862/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CODE1403/21/2026
FIRE VIOLATION SERVICES403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARA CONSTRUCTION CORPGeneral Contractor707/08/2026
CELTIC CONSTRUCTION IIGeneral Contractor107/08/2026
METROTECH MECHANICAL CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KATZ ENGINEERING238310/25/2022
Building Lifecycle
All (44)Filed (9)Permit Issued (8)Signed Off (5)Inspection (4)Special Inspection (18)
06/21/2023
Signed off — Alteration
REVISED PLANS PER FDNY LETTER DTD 03-28-2023 2023-TMENGR-00181- PLAN REQUESTING AMENDMENTS TO PLANS FOR INSTALLATION OF ONE CAGE FOR USE AND STORAGE 33 1/3 LPG CYLINDERS FOR USE WITH SEVEN (7) HI-LO UNITS. NO CHANGE TO CO, EGRESS AND ZONING
B00821308-I1
04/27/2023
Permit issued — General Construction
B00821308-I1-GC
04/13/2023
Special inspection requirement — Final
Ashish Patel
04/11/2023
Filed — Alteration
REVISED PLANS PER FDNY LETTER DTD 03-28-2023 2023-TMENGR-00181- PLAN REQUESTING AMENDMENTS TO PLANS FOR INSTALLATION OF ONE CAGE FOR USE AND STORAGE 33 1/3 LPG CYLINDERS FOR USE WITH SEVEN (7) HI-LO UNITS. NO CHANGE TO CO, EGRESS AND ZONING
B00821308-P1
04/11/2023
Special inspection requirement — Final
02/28/2023
Filed — Alteration
REVISED PLANS PER FDNY LETTER DTD 03-28-2023 2023-TMENGR-00181- PLAN REQUESTING AMENDMENTS TO PLANS FOR INSTALLATION OF ONE CAGE FOR USE AND STORAGE 33 1/3 LPG CYLINDERS FOR USE WITH SEVEN (7) HI-LO UNITS. NO CHANGE TO CO, EGRESS AND ZONING
B00821308-I1
02/02/2023
Signed off — Alteration
Renovation of existing commercial space on floor 001 and 002. Mechanical work. There is to be no change of use, occupancy, or egress.
B00778222-I1
01/13/2023
Signed off — Alteration
Replacement of existing windows at existing warehouse space. There is to be no change of use, occupancy, or egress.
B00716130-I1
01/13/2023
Signed off — Alteration
Renovation of existing commercial space on floor 001 and 002. Architectural work. There is to be no change of use, occupancy, or egress.
B00754619-I1
11/17/2022
Signed off — Alteration
B00778216-I1
10/25/2022
Filed — Alteration
Renovation of existing commercial space on floor 001 and 002. Mechanical work. There is to be no change of use, occupancy, or egress.
B00778222-P2
10/06/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/30/2022
Permit issued — Mechanical Systems
B00778222-I1-MS
09/30/2022
Permit issued — General Construction
B00716130-I1-GC
09/30/2022
Permit issued — General Construction
B00754619-I1-GC
09/26/2022
Permit issued — Mechanical Systems
B00778222-I1-MS
09/22/2022
Filed — Alteration
Renovation of existing commercial space on floor 001 and 002. Mechanical work. There is to be no change of use, occupancy, or egress.
B00778222-P1
09/20/2022
Permit issued — General Construction
B00754619-I1-GC
09/20/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/19/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Perry Petrillo
09/19/2022
Special inspection requirement — Final
Perry Petrillo
09/19/2022
Special inspection requirement — Fenestration air leakage
Perry Petrillo
09/19/2022
Special inspection requirement — Air barrier - visual inspection
Perry Petrillo
09/19/2022
Special inspection requirement — Energy Code Compliance Inspections
Perry Petrillo
09/09/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/09/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/08/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN FELLENZER
09/08/2022
Special inspection requirement — Mechanical Systems
YURI KATZ
09/08/2022
Special inspection requirement — Final
JOHN FELLENZER
09/08/2022
Special inspection requirement — Duct leakage testing, insulation and design
JOHN FELLENZER
09/08/2022
Special inspection requirement — HVAC-R and service water heating system controls
JOHN FELLENZER
09/08/2022
Special inspection requirement — HVAC-R and service water heating equipment
JOHN FELLENZER
09/07/2022
Filed — Alteration
Renovation of existing commercial space on floor 001 and 002. Architectural work. There is to be no change of use, occupancy, or egress.
B00754619-P1
09/02/2022
Filed — Alteration
Renovation of existing commercial space on floor 001 and 002. Mechanical work. There is to be no change of use, occupancy, or egress.
B00778222-I1
09/02/2022
Filed — Alteration
B00778216-I1
09/02/2022
Permit issued — Plumbing
B00778216-I1-PL
08/29/2022
Permit issued — General Construction
B00716130-I1-GC
07/11/2022
Filed — Alteration
Renovation of existing commercial space on floor 001 and 002. Architectural work. There is to be no change of use, occupancy, or egress.
B00754619-I1
06/22/2022
Filed — Alteration
Replacement of existing windows at existing warehouse space. There is to be no change of use, occupancy, or egress.
B00716130-I1
04/11/2022
Special inspection requirement — Energy Code Compliance Inspections
Perry Petrillo
04/11/2022
Special inspection requirement — Air barrier - visual inspection
Perry Petrillo
04/11/2022
Special inspection requirement — Fenestration air leakage
Perry Petrillo
04/11/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Perry Petrillo
04/11/2022
Special inspection requirement — Final
Perry Petrillo
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offCELTIC CONSTRUCTION II04/27/2023
DOB NOWMechanical SystemsSigned-offARA CONSTRUCTION CORP09/30/2022
DOB NOWGeneral ConstructionSigned-offARA CONSTRUCTION CORP09/30/2022
DOB NOWGeneral ConstructionSigned-offARA CONSTRUCTION CORP09/30/2022
DOB NOWMechanical SystemsSigned-offARA CONSTRUCTION CORP09/26/2022
DOB NOWGeneral ConstructionSigned-offARA CONSTRUCTION CORP09/20/2022
DOB NOWPlumbingSigned-offMETROTECH MECHANICAL CORP09/02/2022
DOB NOWGeneral ConstructionSigned-offARA CONSTRUCTION CORP08/29/2022
1 project · most recent 05/02/2022
General Wiring
FiledStatusContractorScope
05/02/2022CompleteNOVA ELECTRIC LLCGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/06/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/20/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/09/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/09/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
04/13/2023FinalAshish Patelprogress
04/11/2023Final—progress
09/19/2022Fenestration and door U-factor and product ratingsPerry Petrilloenergy_progress
09/19/2022FinalPerry Petrilloprogress
09/19/2022Fenestration air leakagePerry Petrilloenergy_progress
09/19/2022Air barrier - visual inspectionPerry Petrilloenergy_progress
09/19/2022Energy Code Compliance InspectionsPerry Petrilloprogress
09/08/2022HVAC-R and service water piping design and insulationJOHN FELLENZERenergy_progress
09/08/2022Mechanical SystemsYURI KATZspecial
09/08/2022FinalJOHN FELLENZERprogress
09/08/2022Duct leakage testing, insulation and designJOHN FELLENZERenergy_progress
09/08/2022HVAC-R and service water heating system controlsJOHN FELLENZERenergy_progress
09/08/2022HVAC-R and service water heating equipmentJOHN FELLENZERenergy_progress
04/11/2022Energy Code Compliance InspectionsPerry Petrilloprogress
04/11/2022Air barrier - visual inspectionPerry Petrilloenergy_progress
04/11/2022Fenestration air leakagePerry Petrilloenergy_progress
04/11/2022Fenestration and door U-factor and product ratingsPerry Petrilloenergy_progress
04/11/2022FinalPerry Petrilloprogress
▾Documents — 41 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/29/2026B00716130-I1Request digital key ↗
08/29/2026B00754619-P1Request digital key ↗
08/29/2026B00754619-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications25
▸DOB NOWProgress Inspector Seal & Signature16
09/01/2026B00821308-I1Open ↗
08/27/2026B00754619-I1Open ↗
08/27/2026B00754619-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/29/2026B00754619-I1Open ↗
08/28/2026B00778216-I1Open ↗
08/28/2026B00778222-P2Open ↗
Showing 3 of 9 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/28/2026B00778216-I1Open ↗
08/28/2026B00778222-I1Open ↗
08/13/2026B00716130-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis3
08/13/2026B00716130-I1Open ↗
08/13/2026B00778222-I1Open ↗
08/13/2026B00754619-I1Open ↗