Factory, industrial, semi-fireproof
Rivian Service Center
512 JOHNSON AVENUE · Name © OpenStreetMap contributors · BIN 3070620
💬 Discuss this project
1964Year Built
1Stories
F4Building Class
M1-2Zoning
23,900 sfGross Floor Area
1Units
1 Open Violation ▸FDNY Report ↗
Factory, industrial, semi-fireproof · Owner of record: 498-512 JOHNSON AVE BROOKLYN LLC · 29,000 sf lot · 0.82 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Roof8p · 6 filings · 20 docs
Floor 251p · 1 filing · 11 docs
Floor 24
Floor 23
Floor 22
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 14p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PROLOGIS10007/08/2026
498-512 JOHNSON AVE BROOK103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/13/2019$14.0M—— → —$586/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS1903/21/2026
ALL IN PERMIT CONSULTANTS203/21/2026
LOUIS STRIAR803/21/2026
RIZZO GROUP303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PINE RIDGE CNSN MGMT LLCGeneral Contractor1007/08/2026
J.V.S. SPRINT ENTERPRISESGeneral Contractor707/08/2026
AMP COMMUNICATIONS LLCGeneral Contractor603/21/2026
MACK SIGNS AWNINGSScaffold407/08/2026
CNY BUILDING CORPGeneral Contractor407/08/2026
POWERONE ELECTL CONTRG 003868General Contractor303/22/2026
NEPTUNE SIGNS AWNINGSScaffold207/08/2026
AFGO MECHANICAL SVCS INCGeneral Contractor203/21/2026
A PLUS PLUMBING CORPPlumbing203/22/2026
R.J.C. MECHANICAL CORPPlumbing207/08/2026
POWERONE ELECT'L CONTRGElectrical103/22/2026
GREAT OAKS MECHANICALGeneral Contractor103/22/2026
ALLSTATE SPRINKLER LLCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
VINCENT J. LIOTTA P. E.1974102/06/2026
CODEGREEN510309/30/2024
SKYLINE ENGINEERING, PLLC2671406/21/2022
VALENTINO POMPEO ARCHITEC1013103/09/2021
Building Lifecycle
All (111)Filed (30)Permit Issued (23)Signed Off (15)Violation (11)Inspection (2)Special Inspection (30)
02/25/2026
Signed off — Alteration
REPLACEMENT OF 2 CONDEISNG UNITS ON THE ROOF WITH A TOTAL CAPACITY OF 4.5 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
B01355478-I1
02/06/2026
Filed — Alteration
REPLACEMENT OF 2 CONDEISNG UNITS ON THE ROOF WITH A TOTAL CAPACITY OF 4.5 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
B01355478-I1
02/06/2026
Permit issued — Mechanical Systems
B01355478-I1-MS
02/04/2026
Special inspection requirement — Mechanical Systems
Vincent Liotta
02/04/2026
Special inspection requirement — HVAC-R and service water heating system controls
Vincent Liotta
02/04/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Vincent Liotta
02/04/2026
Special inspection requirement — HVAC-R and service water heating equipment
Vincent Liotta
02/04/2026
Special inspection requirement — Maintenance information
Vincent Liotta
02/04/2026
Special inspection requirement — Final
Vincent Liotta
01/06/2026
Violation issued (FDNY_ORDER, closed)
10/22/2025
Violation issued (FDNY_NOV, closed)
10/22/2025
Violation issued (FDNY_NOV, closed)
03/05/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/02/2024
Violation issued (ECB, closed)
Construction
11/04/2024
Signed off — Alteration
Structural work as per plans filed herewith. No change in egress, use, or occupancy.
B01098389-I1
10/28/2024
Signed off — Alteration
B01096845-I1
10/15/2024
Signed off — Alteration
ERECT ILLUMINATED WALL SIGN ON VARICK AVENUE ELEVATION. SIGN IS ACCESSORY TO RIVIAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00523525-I1
10/15/2024
Signed off — Alteration
B00515034-I1
10/02/2024
Permit issued — Structural
B01098389-I1-ST
10/01/2024
Special inspection requirement — Subgrade Inspections
HATIM ELSAID
10/01/2024
Special inspection requirement — Final
HATIM ELSAID
10/01/2024
Special inspection requirement — Concrete - Cast-In-Place
HATIM ELSAID
09/30/2024
Filed — Alteration
Structural work as per plans filed herewith. No change in egress, use, or occupancy.
B01098389-P1
09/26/2024
Special inspection requirement — Subgrade Inspections
HATIM ELSAID
09/26/2024
Special inspection requirement — Final
HATIM ELSAID
09/26/2024
Special inspection requirement — Concrete - Cast-In-Place
HATIM ELSAID
09/09/2024
Permit issued — Support of Excavation
B01096845-I1-SE
09/05/2024
Filed — Alteration
Structural work as per plans filed herewith. No change in egress, use, or occupancy.
B01098389-I1
08/28/2024
Filed — Alteration
B01096845-I1
09/13/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/14/2023
Permit issued — Mechanical Systems
B00542282-I1-MS
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/03/2022
Permit issued — General Construction
B00749031-S1-GC-CX
08/26/2022
Filed — Alteration
EXTERIOR INSTALLATION OF (6) LEVEL 3, (6) LEVEL 2 ELECTRIC VEHICLECHARGING STATIONS, AND (1) C3 POWER CABINET TO THE EXTERIOR PARKING AREA OF AN EXISTING EV SERVICE CENTER. STRUCTURAL APPLICATION FILED AS SUBSEQUENT.
B00749031-P1
08/26/2022
Special inspection requirement — Post-installed Anchors
Matthew Wavro
08/26/2022
Special inspection requirement — Concrete - Cast-In-Place
Matthew Wavro
08/26/2022
Special inspection requirement — Final
Matthew Wavro
08/26/2022
Special inspection requirement — Footing and Foundation
Matthew Wavro
08/25/2022
Permit issued — General Construction
B00749031-I1-GC
07/14/2022
Signed off — Alteration
GENERAL CONSTRUCTION AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH ALT1 APPLICATION 322092999
B00461408-I1
07/08/2022
Signed off — Alteration
INSTALL NEW MECHANICAL SYSTEM AS PER PLANS FILED
B00477819-I1
06/21/2022
Filed — Alteration
EXTERIOR INSTALLATION OF (6) LEVEL 3, (6) LEVEL 2 ELECTRIC VEHICLECHARGING STATIONS, AND (1) C3 POWER CABINET TO THE EXTERIOR PARKING AREA OF AN EXISTING EV SERVICE CENTER. STRUCTURAL APPLICATION FILED AS SUBSEQUENT.
B00749031-S1
06/16/2022
Filed — Alteration
EXTERIOR INSTALLATION OF (6) LEVEL 3, (6) LEVEL 2 ELECTRIC VEHICLECHARGING STATIONS, AND (1) C3 POWER CABINET TO THE EXTERIOR PARKING AREA OF AN EXISTING EV SERVICE CENTER. STRUCTURAL APPLICATION FILED AS SUBSEQUENT.
B00749031-I1
06/01/2022
Special inspection requirement — Final
Matthew Wavro
06/01/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Wavro
04/21/2022
Signed off — Alteration
B00473671-I1
04/21/2022
Signed off — Alteration
STRUCTURAL WORK IN CONJUNCTION WITH ALT-1 APPLICATION#322092999
B00474148-I1
04/21/2022
Signed off — Alteration
MODIFY EXISTING SPRINKLER SYSTEM AS PER PLANS FILED
B00477337-I1
01/11/2022
Filed — Alteration
GAS WORK FOR INSTALLATION OF ROOF TOP UNITS AND UNIT HEATER AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUAPNCY.
B00632087-P1
12/20/2021
Signed off — Alteration
Replace existing egress door, provide code compliant ADA ramp & new overhead doors. All work as per plan submitted herewith. No change in bulk, use or occupancy.
B00475410-I1
12/01/2021
Permit issued — General Construction
B00475410-I1-GC
11/30/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/24/2021
Permit issued — Plumbing
B00632087-I1-PL
11/18/2021
Filed — Alteration
GAS WORK FOR INSTALLATION OF ROOF TOP UNITS AND UNIT HEATER AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUAPNCY.
B00632087-I1
11/18/2021
Permit issued — General Construction
B00475410-I1-GC
10/19/2021
Permit issued — Structural
B00474148-I1-ST
09/24/2021
Permit issued — Structural
B00474148-I1-ST
07/13/2021
Permit issued — Structural
B00474148-I1-ST
Latest 60 of 111 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offAFGO MECHANICAL SVCS02/06/2026
DOB NOWStructuralSigned-offCNY BUILDING CORP10/02/2024
DOB NOWSupport of ExcavationSigned-offCNY BUILDING CORP09/09/2024
DOB NOWMechanical SystemsPermit IssuedPINE RIDGE CNSN MGMT LLC08/14/2023
DOB NOWGeneral ConstructionPermit IssuedAMP COMMUNICATIONS LLC10/03/2022
DOB NOWGeneral ConstructionPermit IssuedAMP COMMUNICATIONS LLC08/25/2022
DOB NOWGeneral ConstructionSigned-offJ.V.S. SPRINT ENTERPRISES12/01/2021
DOB NOWPlumbingSigned-offR.J.C. MECHANICAL CORP11/24/2021
DOB NOWGeneral ConstructionSigned-offJ.V.S. SPRINT ENTERPRISES11/18/2021
DOB NOWStructuralSigned-offPINE RIDGE CNSN MGMT LLC10/19/2021
DOB NOWStructuralSigned-offPINE RIDGE CNSN MGMT LLC09/24/2021
DOB NOWStructuralSigned-offPINE RIDGE CNSN MGMT LLC07/13/2021
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC06/15/2021
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC06/15/2021
DOB NOWMechanical SystemsSigned-offPINE RIDGE CNSN MGMT LLC04/28/2021
DOB NOWGeneral ConstructionSigned-offPINE RIDGE CNSN MGMT LLC04/23/2021
DOB NOWSprinklersSigned-offALLSTATE SPRINKLER LLC04/05/2021
DOB NOWPlumbingSigned-offR.J.C. MECHANICAL CORP04/02/2021
DOB NOWGeneral ConstructionSigned-offJ.V.S. SPRINT ENTERPRISES03/26/2021
DOB NOWSignSigned-offMACK SIGNS & AWNINGS INC01/08/2020
DOB NOWSignSigned-offMACK SIGNS & AWNINGS INC01/07/2020
DOB NOWSignSigned-offMACK SIGNS & AWNINGS INC01/07/2020
DOB NOWSignSigned-offMACK SIGNS & AWNINGS INC01/07/2020
BISOTISSUEDLEGACY BUILDERS/DEVELOPERS CORP11/20/2020
BISOTISSUEDALBA SERVICES INC11/02/2020
1 project · most recent 01/11/2022
Gas
FiledStatusContractorScope
01/11/2022Signed-offGREAT OAKS MECHANICAL INCGas
5 projects · most recent 10/26/2023
General Wiring Lighting
FiledStatusContractorScope
10/26/2023CompletePOWERONE ELECT'L CONTRGGeneral Wiring
06/06/2022Permit IssuedENNELL GRP ELECTRIC CORPGeneral Wiring
07/01/2021CompleteFSM ELECTRICAL CORPORATIOGeneral Wiring, Lighting
06/15/2021Permit IssuedRAINBOW ELECTRIC CO., INC—
06/15/2021Permit IssuedRAINBOW ELECTRIC CO., INC—
1 project · most recent 08/26/2022
Concrete
FiledStatusContractorScope
08/26/2022Permit IssuedAMP COMMUNICATIONS LLCConcrete
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
09/13/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/30/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 55
DateRequirementInspectorRole
02/04/2026Mechanical SystemsVincent Liottaspecial
02/04/2026HVAC-R and service water heating system controlsVincent Liottaenergy_progress
02/04/2026HVAC-R and service water piping design and insulationVincent Liottaenergy_progress
02/04/2026HVAC-R and service water heating equipmentVincent Liottaenergy_progress
02/04/2026Maintenance informationVincent Liottaenergy_progress
02/04/2026FinalVincent Liottaprogress
10/01/2024Subgrade InspectionsHATIM ELSAIDspecial
10/01/2024FinalHATIM ELSAIDprogress
10/01/2024Concrete - Cast-In-PlaceHATIM ELSAIDspecial
09/26/2024Subgrade InspectionsHATIM ELSAIDspecial
09/26/2024FinalHATIM ELSAIDprogress
09/26/2024Concrete - Cast-In-PlaceHATIM ELSAIDspecial
08/26/2022Post-installed AnchorsMatthew Wavrospecial
08/26/2022Concrete - Cast-In-PlaceMatthew Wavrospecial
08/26/2022FinalMatthew Wavroprogress
08/26/2022Footing and FoundationMatthew Wavroprogress
06/01/2022FinalMatthew Wavroprogress
06/01/2022Fire-Resistant Penetrations and JointsMatthew Wavrospecial
07/01/2021Sprinkler SystemsMatthew Wavrospecial
06/17/2021Structural Steel - WeldingMatthew Wavrospecial
06/17/2021FinalMatthew Wavroprogress
06/17/2021Structural Steel - High Strength BoltingMatthew Wavrospecial
06/17/2021Post-installed AnchorsMatthew Wavrospecial
06/17/2021Structural Steel - DetailsMatthew Wavrospecial
05/26/2021Interior lighting powerMatthew Wavroenergy_progress
Latest 25 of 55.
▾Documents — 199 on file (BIS + DOB NOW)
▸Plans & Drawings30
▸DOB NOWPlans/Sketch14
09/01/2026B00477819-I1Request digital key ↗
09/01/2026B00477819-P1Request digital key ↗
09/01/2026B00515034-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Structural4
09/01/2026B00474148-I1Request digital key ↗
09/01/2026B00474148-P1Request digital key ↗
08/15/2026B00474148-P3Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sign4
09/02/2026B00272422-I1Request digital key ↗
09/02/2026B00272430-I1Request digital key ↗
09/02/2026B00272435-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - General Construction3
09/01/2026B00461408-P1Request digital key ↗
09/01/2026B00461408-I1Request digital key ↗
09/01/2026B00475410-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler3
09/01/2026B00477337-I1Request digital key ↗
09/01/2026B00477337-P1Request digital key ↗
09/01/2026B00477337-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/01/2026B00473671-I1Request digital key ↗
08/15/2026B00473671-P1Request digital key ↗
▸Applications & Permits14
▸BISPLAN / WORK APPROVAL APPLICATION9
08/07/2022340787642Open ↗
10/28/2021340787642Open ↗
06/09/2021322092999Open ↗
Showing 3 of 9 on file for this type
▸BISWORK PERMIT APPLICATION3
06/15/2021322092999Open ↗
11/20/2020340787642Open ↗
11/02/2020340771043Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
06/21/2021322092999Open ↗
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
11/02/2020340771043Open ↗
▸Seals & Professional Certifications85
▸DOB NOWDPL-1: Design Professional Seal & Signature30
09/01/2026B00461408-I1Open ↗
09/01/2026B00461408-P1Open ↗
09/01/2026B00477337-I1Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWProgress Inspector Seal & Signature26
09/23/2026B01355478-I1Open ↗
09/23/2026B01355478-I1Open ↗
08/31/2026B00461408-P1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature23
09/23/2026B01355478-I1Open ↗
08/31/2026B00461408-P1Open ↗
08/29/2026B00474148-P1Open ↗
Showing 3 of 23 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
11/17/2020340787642Open ↗
09/30/2020340771043Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
11/17/2020340787642Open ↗
09/30/2020340771043Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
11/17/2020340787642Open ↗
09/30/2020340771043Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
06/10/2021322092999Open ↗
▸Environmental & Asbestos32
▸DOB NOWDEP ACP-5: Asbestos Assessment Report29
09/01/2026B00461408-P1Open ↗
09/01/2026B00461408-I1Open ↗
09/01/2026B00477337-P1Open ↗
Showing 3 of 29 on file for this type
▸BISASBESTOS: VARIANCE (DEP FORM V5)1
11/02/2020340771043Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/17/2020340787642Open ↗
▸BISAPPLICANT SHALL PROVID E 1 ACP-21 FORMPRIOR TO SIGN OFF: TRU1765MN201
06/29/2021340771043Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
06/29/2021340771043Open ↗
06/10/2021322092999Open ↗
11/20/2020340787642Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
09/01/2026B00475410-I1Open ↗
08/13/2026B00461408-I1Open ↗
08/13/2026B00477819-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
11/17/2020340787642Open ↗
09/30/2020340771043Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
06/29/2021340771043Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
11/02/2020340771043Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY4
06/29/2021340771043Open ↗
06/10/2021322092999Open ↗
11/20/2020340787642Open ↗
Showing 3 of 4 on file for this type
▸BISSUBGRADE INSP / SOILS-SITE PREP1
11/02/2020340771043Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
11/02/2020340771043Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
11/02/2020340771043Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
11/02/2020340771043Open ↗
▸Approvals, Objections & Sign-offs7
▸BISSCHEDULE A - OCCUPANCY / USE3
06/09/2021322092999Open ↗
05/24/2021322092999Open ↗
03/23/2021322092999Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
08/07/2022340787642Open ↗
06/10/2021322092999Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
06/29/2021340771043Open ↗
▸BISFINAL1
11/02/2020340771043Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT3
06/10/2021322092999Open ↗
11/17/2020340787642Open ↗
09/30/2020340771043Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW32
11/05/2021322092999Open ↗
06/29/2021340771043Open ↗
▸Filing & Intake Forms3
▸BISEFILING JOB APPLICATION COVER SHEET2
11/17/2020340787642Open ↗
09/30/2020340771043Open ↗
▸BISEFILING COVER SHEET1
02/24/2021322092999Open ↗
▸Other Documents2
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026B01098389-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B01096845-I1Open ↗