2 Open Violations 0 unresolved · 2 paperwork only▸
ECB01/08/2003WORK WITHOUT PERMIT. NOTED: AT 2ND FLOOR ADDITIONAL GAS LINE INSTALLED FOR A RES. STOVE, NOT ON APPROVED PLANS. REMEDY: OBTAIN PERMIT OR RESTORE TO LEGAL CONDITION.Nothing owed — awaiting certificate of correction
ECB01/08/2003WORK DOES NOT CONFORM TO APPROVED PLANS. NOTED: PLANS FOR JOB# 300765562 ALT TYPE I- SHOWS AT THE CELLAR LEVEL TO BE 3 TOILETS ADN 2 LAVS. AT TIME OF INSPECTION THERE WAS IN ACTUAL, 2 TOILETS AND 1 LAV. ALSO: SNothing owed — awaiting certificate of correction
Church, synagogue, chapel · Owner of record: BROOKLYN CHINESE BAPTIST CHURCH INC · 4,520 sf lot · 1.68 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.