ECB03/24/2026FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS #39106945H ISSUED ON 02/26/2024, AND FAILURE TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28.201.1 AND 1 RCNY 102-01(D)(2). AN ACCEPTABLE CERT$6K due
ECB03/24/2026FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS #39106946J ISSUED ON 02/26/2024, AND FAILURE TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28.201.1 AND 1 RCNY 102-01(D)(2). AN ACCEPTABLE CERT$1K due
ECB02/26/2024RESPONDENT ISSUED RCA ON 12/13/2021 FAILURE TO HAVE NEW OR ALTERED PLUMBING SYSTEM TESTED I OBSERVED IN CELLAR INSTALLED GAS LINE FOR NEW QAS DRYER ALSO WASTE LINES INSTALLED FOR THE BATHROOM AND SINK WITHOUT A$1K due
ECB02/26/2024RESPONDENT ISSUED RCA ON 12/13/2021 IN CELLAR GAS LINE WAS INSTALLED FOR NEW GAS DRYER. ALSO WASTE LINES WERE INSTALLED FOR BATHROOM AND SINK WITHOUT A PLUMBING PERMIT FAILING TO PROVIDE ACCESS TO DETERMINE IF$630 due
ECB02/26/2024RESPONDENT ISSUED RCA ON 12/13/2021 IN CELLAR HOT WATER HEATER TEMPERATURE RELIVE VALVE WAS INSTALLED WITH GATE VALVE WHICH COULD PREVENT RELEASE OF THE PRESSURE OF HOT WATER HEATER. VENT TO HOT WATER HEATER HA$315 due
ECB02/26/2024RESPONDENT ISSUED RCA ON 12/13/2021 GAS BEING SUPPLIED TO BUILDING WITHOUT INSPECTION AND CERTIFICATION BY DOB I OBSERVED IN CELLAR GAS SUPPLYING GAS DRYER WITHOUT INSPECTION AND CERTIFICATION BY DOB FAILING TO$2K due