DOB02/24/2017VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
DOB03/03/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
DOB05/15/2014VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
DOB12/13/2011VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
DOB12/31/2009V-DOB VIOLATION - ACTIVE
DOB01/01/2009V-DOB VIOLATION - ACTIVE
DOB01/03/2008V-DOB VIOLATION - ACTIVE
DOB02/13/2004V-DOB VIOLATION - ACTIVE
DOB02/13/2004V-DOB VIOLATION - ACTIVE
DOB02/13/2004V-DOB VIOLATION - ACTIVE
DOB02/07/2000V-DOB VIOLATION - ACTIVE
DOB02/07/2000V-DOB VIOLATION - ACTIVE
DOB02/07/2000V-DOB VIOLATION - ACTIVE
DOB03/16/1999V-DOB VIOLATION - ACTIVE
DOB03/16/1999V-DOB VIOLATION - ACTIVE
DOB03/16/1999V-DOB VIOLATION - ACTIVE
DOB05/04/1998V-DOB VIOLATION - ACTIVE
DOB05/04/1998V-DOB VIOLATION - ACTIVE
DOB05/04/1998V-DOB VIOLATION - ACTIVE
DOB08/29/1995V-DOB VIOLATION - ACTIVE
DOB08/16/1993V-DOB VIOLATION - ACTIVE
DOB11/13/199046A/32 DRAIN COCK ON BOILER CLOGGED
ECB11/19/2004B4A/50C BQ9/50D 36/50E 32A/50F 50A 50B (50A) NO EMERGENCY SWITCH AT BOILER ROOM ENTRANCE (50B) NO FIX FRESH AIR VENTELATION. (50C) EXPOSED WOOD BEAM OVER BOILER. (50D) REMOVED THREADED END FROM SAFETY OR RELIEFNothing owed — awaiting certificate of correction
ECB11/19/2004B4A/50B BQ9/50C 36/50D 32A/50E 19B 50A (50A) NO EMERGENCY SWITCH AT BOILER ROOM ENTRANCE. (50B) NO FIX FRESH AIR VENTILATION. (50C) EXPOSED WOOD BEAMS OVEN BOILER. (50D) REMOVED THREADED END FROM SAFETY ORNothing owed — awaiting certificate of correction
ECB11/19/2004B4A/50C BQ9/50D 36/50E 32A/(50F) 50A 50B (50A) NO EMERGENCY SWITCH AT BOILER ROOM ENTRANCE. (50B) NO FIX FRESH AIR VENTELATION. (50C) EXPOSED WOOD BEAM OVER BOILER. (50D) REMOVED THREADED END FROM SAFETY ORNothing owed — awaiting certificate of correction
ECB06/03/1991FAILURE TO MAINTAIN HOLES IN CELLAR CEILING THROUGHOUT 2 WATER LEAK DAMAGE BEAM AT EAST SIDE OF BUILDING REMEDY MAKE ALL NECESSARY REPAIRS IN A SAFE AND LAWFUL MANNERNothing owed — awaiting certificate of correction
Predominantly retail with other uses · 2,000 sf lot · 1.6 FAR built · Flood zone X