← Back
Walk-up apt, over six families with stores
513 2 AVENUE
MANHATTAN · BIN 1019899
💬 Discuss this project
1940Year Built
6Stories
C7Building Class
C1-8AZoning
7,944 sfGross Floor Area
13Units
Rent Stabilized6 Open Violations ▸
Walk-up apt, over six families with stores · Owner of record: 513 SECOND AVENUE LLC · 1,778 sf lot · 4.47 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbing
Roof3p · 2 filings · 7 docs
Cellar6p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SARRAF ASSOCIATES L P3107/08/2026
513 SECOND AVENUE LLC103/22/2026
SAHARA'S203/21/2026
SAHARAS303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASHRAF CORP309/30/2025
PORCELLO ENGINEERING, INC.106/13/2024
BAZINI ENGINEERING, P.C.212/17/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PS ENGINEERS203/21/2026
NORTHEAST EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ANDAMIO SCAFFOLDING LLCGeneral Contractor807/03/2026
KEY RESTORATION CORPGeneral Contractor307/08/2026
GREGORY PAPANTONIOUElectrical203/21/2026
ALAFOGIANNIS PLBG & HTGPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUILDING CONSULTING ENGIN1034106/13/2024
FRED PORCELLO, P.E. DBA P531106/13/2024
Building Lifecycle
All (43)Filed (7)Permit Issued (14)Signed Off (5)Violation (14)Special Inspection (3)
08/25/2026
Signed off — Alteration
M01057788-I1
07/28/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
M01294124-I1
07/27/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER EMERGENCY LETTER. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01013376-I1
07/27/2026
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY LIGHT DUTY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01013388-I1
07/13/2026
Signed off — Alteration
FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION
M01247933-I1
06/05/2026
Permit issued — Sidewalk Shed
M01013376-I1-SH
05/18/2026
Permit issued — General Construction
M01057788-I1-GC
03/09/2026
Permit issued — Sidewalk Shed
M01013376-I1-SH
03/04/2026
Permit issued — Supported Scaffold
M01013388-I1-SF
10/01/2025
Permit issued — Protection and Mechanical Methods
M01294124-I1-PMM
09/30/2025
Filed — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
M01294124-I1
07/18/2025
Permit issued — Suspended Scaffold
M01247933-I1-SC
07/11/2025
Filed — Alteration
FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION
M01247933-I1
06/27/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
FRANCISCO PEREZ
03/04/2025
Permit issued — Supported Scaffold
M01013388-I1-SF
03/04/2025
Permit issued — Sidewalk Shed
M01013376-I1-SH
10/31/2024
Permit issued — General Construction
M01057788-I1-GC
07/10/2024
Permit issued — General Construction
M01057788-I1-GC
06/13/2024
Filed — Alteration
M01057788-I1
03/06/2024
Permit issued — Sidewalk Shed
M01013376-I1-SH
03/06/2024
Permit issued — Supported Scaffold
M01013388-I1-SF
03/05/2024
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER EMERGENCY LETTER. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01013376-I1
03/05/2024
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY LIGHT DUTY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01013388-I1
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/15/2022
Violation issued (HPD, closed)
A
09/15/2021
Violation issued (HPD, open)
B
09/15/2021
Violation issued (HPD, closed)
A
01/03/2020
Permit issued — Plumbing
M00225048-S1-PL
12/17/2019
Filed — Alteration
CONNECT TO EXISTING GAS PIPING AND WATER PIPING FOR REPLACEMENT BOILER AND INDIRECT HOT WATER HEATER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00225048-S1
12/16/2019
Permit issued — Boiler Equipment
M00225048-I1-BE
12/12/2019
Filed — Alteration
CONNECT TO EXISTING GAS PIPING AND WATER PIPING FOR REPLACEMENT BOILER AND INDIRECT HOT WATER HEATER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00225048-I1
09/10/2019
Special inspection requirement — HVAC and service water heating equipment
Joseph Bazini
09/10/2019
Special inspection requirement — HVAC and service water heating equipment
Joseph Bazini
08/18/2014
Violation issued (HPD, open)
B
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/31/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/31/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/23/2009
Violation issued (ECB, closed)
Plumbing
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/22/2000
Violation issued (HPD, open)
B
09/01/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC06/05/2026
DOB NOWGeneral ConstructionSigned-offKEY RESTORATION CORP05/18/2026
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC03/09/2026
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC03/04/2026
DOB NOWProtection and Mechanical MethodsSigned-offANDAMIO SCAFFOLDING LLC10/01/2025
DOB NOWSuspended ScaffoldSigned-offKEY RESTORATION CORP07/18/2025
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC03/04/2025
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC03/04/2025
DOB NOWGeneral ConstructionSigned-offKEY RESTORATION CORP10/31/2024
DOB NOWGeneral ConstructionSigned-offKEY RESTORATION CORP07/10/2024
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC03/06/2024
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC03/06/2024
DOB NOWPlumbingPermit IssuedALAFOGIANNIS PLBG & HTG01/03/2020
DOB NOWBoiler EquipmentPermit IssuedALAFOGIANNIS PLBG & HTG12/16/2019
BISPLISSUEDIPS PLUMBING CORP02/14/2019
BISFPISSUEDMASTER FIRE SYSTEMS, INC08/03/2007
BISMHISSUEDSARRAF DANIELA05/02/2003
BISFPISSUEDMASTER FIRE SYSTEMS, INC03/14/2003
BISFPISSUEDMASTER FIRE PREVENTION SYSTEM IN12/15/1992
1 project · most recent 12/17/2019
Gas
FiledStatusContractorScope
12/17/2019Permit IssuedALAFOGIANNIS PLBG & HTGGas
2 projects · most recent 10/07/2025
FiledStatusContractorScope
10/07/2025Permit IssuedBOROWIDE ELECT'L CONTR'S—
03/13/2024Permit IssuedBOROWIDE ELECT'L CONTR'S—
2 projects · most recent 03/05/2024
Scaffold Sidewalk Shed
FiledStatusContractorScope
03/05/2024Signed-offANDAMIO SCAFFOLDING LLCScaffold
03/05/2024Signed-offANDAMIO SCAFFOLDING LLCSidewalk Shed
1 project · most recent 07/11/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
07/11/2025Signed-offKEY RESTORATION CORPSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
06/27/2025Alternative Materials - OTCR Buildings Bulletin NumberFRANCISCO PEREZspecial
09/10/2019HVAC and service water heating equipmentJoseph Bazinienergy_progress
09/10/2019HVAC and service water heating equipment Joseph Bazinienergy_progress
▾Documents — 52 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch5
08/27/2026M01013388-I1Request digital key ↗
08/27/2026M01013376-I1Request digital key ↗
08/27/2026M01057788-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment1
09/05/2026M00225048-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/05/2026M00225048-S1Request digital key ↗
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION5
10/30/2019123406652Open ↗
10/25/2019123406652Open ↗
10/17/2019123406652Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION3
07/23/2019123406652Open ↗
02/15/2019123406652Open ↗
02/01/2019123406652Open ↗
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/05/2026M00225048-I1Open ↗
09/05/2026M00225048-S1Open ↗
08/27/2026M01013388-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
12/19/2019123406652Open ↗
12/12/2018123406652Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/12/2018123406652Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
12/12/2018123406652Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026M01247933-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/22/2026M00225048-I1Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
10/30/2019123406652Open ↗
10/17/2019123406652Open ↗
10/11/2019123406652Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWTenant Protection Plan2
08/13/2026M00225048-S1Open ↗
08/13/2026M00225048-I1Open ↗
▸BISTenant Protection Plan and Notes1
12/12/2018123406652Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/05/2026M00225048-S1Open ↗
09/05/2026M00225048-I1Open ↗
08/27/2026M01057788-I1Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
12/19/2019123406652Open ↗
12/12/2018123406652Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
12/19/2019123406652Open ↗
▸Approvals, Objections & Sign-offs2
▸BISLETTERS - SUPPORTING DOCUMENTATION1
12/19/2019123406652Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/19/2019123406652Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
12/19/2019123406652Open ↗
12/12/2018123406652Open ↗
▸Filing & Intake Forms6
▸BISBOROUGH INTAKE FORM5
12/19/2019123406652Open ↗
10/25/2019123406652Open ↗
10/11/2019123406652Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET1
12/12/2018123406652Open ↗
▸Other Documents2
▸DOB NOWManufacturer's Specifications1
08/13/2026M01247933-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01247933-I1Open ↗