← Back
Single or multiple dwelling with stores or offices
514 BROADWAY
STATEN ISLAND · BIN 5008478
💬 Discuss this project
1931Year Built
2.5Stories
S9Building Class
R3-1Zoning
4,225 sfGross Floor Area
4Units
33 Open Violations 32 unresolved · 1 paperwork only ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · 3,260 sf lot · 1.3 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALBANNA ENGINEERING PC106/29/2026
Building Lifecycle
All (33)Filed (1)Violation (31)Special Inspection (1)
06/29/2026
Filed — Alteration
THE REPAIR OF EXTERIOR WALL COMPONENTS AND RESTORATION OF THE BUILDING ENVELOPE IN AREAS AFFECTED BY EMERGENCY RESPONSE OPERATIONS AND SUBSEQUENT EXPOSURE TO THE ELEMENTS INCLUDING 2ND FLOOR REAR APARTMENT CEILING, FLOOR AND WALLS; NO CHANGE TO USE,EGRESS
S01415606-I1
06/11/2026
Special inspection requirement — Final
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/06/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/04/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/08/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/06/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/01/2017
Violation issued (ECB, open)
Boilers
02/24/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/01/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/01/2013
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/13/2011
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/02/2011
Violation issued (HPD, open)
B
08/02/2011
Violation issued (HPD, open)
B
08/02/2011
Violation issued (HPD, open)
B
08/02/2011
Violation issued (HPD, open)
B
08/02/2011
Violation issued (HPD, open)
B
07/07/2011
Violation issued (HPD, open)
B
07/07/2011
Violation issued (HPD, open)
B
07/07/2011
Violation issued (HPD, open)
B
12/31/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/01/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/03/2008
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/19/2007
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/06/2006
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/31/2005
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/20/1989
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Nothing on file for this building.
2 projects · most recent 08/13/2018
FiledStatusContractorScope
08/13/2018Permit IssuedSWITCH ELECT OF THE FIVE4 meters, 1 new_meters
08/07/2018CompleteSWITCH ELECT OF THE FIVE—
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
06/11/2026Final—progress
▾Documents — 3 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026S01415606-I1Request digital key ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026S01415606-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/16/2026S01415606-I1Open ↗