← Back
Two family frame
514 ELTINGVILLE BLVD
STATEN ISLAND · Great Kills-Eltingville · BIN 5073823
💬 Discuss this project
1975Year Built
2Stories
B2Building Class
R3-1Zoning
2,600 sfGross Floor Area
2Units
Two family frame · 4,300 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
Electrical
Roof1 filing · 5 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC105/20/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272105/20/2026
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
08/07/2026
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01404585-I1
05/28/2026
Permit issued — Solar
S01404585-I1-SL
05/20/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01404585-I1
05/20/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
05/20/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
05/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
05/19/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
05/19/2026
Special inspection requirement — Final
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC05/28/2026
1 project · most recent 05/20/2026
FiledStatusContractorScope
05/20/2026CompleteSUNRUN SOLAR ELECTL CORP—
1 project · most recent 05/20/2026
FiledStatusContractorScope
05/20/2026Signed-offSUNRUN INSTALLATION SVC27 panels, 12.15 kw, 568 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
05/20/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
05/20/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
05/19/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
05/19/2026Energy Code Compliance InspectionsWalid Abdullaprogress
05/19/2026FinalWalid Abdullaprogress
▾Documents — 5 on file (BIS + DOB NOW)
▸Seals & Professional Certifications5
▸DOB NOWProgress Inspector Seal & Signature3
08/27/2026S01404585-I1Open ↗
08/27/2026S01404585-I1Open ↗
08/27/2026S01404585-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/27/2026S01404585-I1Open ↗
08/27/2026S01404585-I1Open ↗