← Back
Two family frame
514 VAN DUZER STREET
STATEN ISLAND · BIN 5108812
💬 Discuss this project
1925Year Built
2Stories
B2Building Class
R3XZoning
2,450 sfGross Floor Area
2Units
Two family frame · 4,424 sf lot · 0.55 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction3p · 1 filing · 8 docs
Floor 1Under Construction3p · 1 filing · 8 docs
CellarUnder Construction4p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STEVEN R. SAVINO ARCHITECT PC207/22/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MONARCH FACILITY SOLUTIONGeneral Contractor107/30/2026
SB RENOVATION & MODELINGGeneral Contractor107/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STEVEN R. SAVINO ARCHIT1216107/22/2026
Building Lifecycle
All (16)Filed (2)Permit Issued (2)Special Inspection (12)
07/29/2026
Permit issued — General Construction
S01421817-I1-GC
07/27/2026
Permit issued — General Construction
S01421817-I1-GC
07/22/2026
Filed — Alteration
REPAIR FIRE DAMAGE TO THE FLOOR JOIST, WALLS, AND PARTY WALL. REPLACE ALL SHEETROCK THROUGHOUT HOUSE DAMAGED BY WATER, NO CHANGE IN USE, EGRESS OR OCCUPANCY,
S01421817-I1
07/22/2026
Filed — Alteration
REPAIR FIRE DAMAGE TO THE FLOOR JOIST, WALLS, AND PARTY WALL. REPLACE ALL SHEETROCK THROUGHOUT HOUSE DAMAGED BY WATER, NO CHANGE IN USE, EGRESS OR OCCUPANCY,
S01421817-S1
07/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
Steven Savino
07/06/2026
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
07/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
Steven Savino
07/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Savino
06/29/2026
Special inspection requirement — Fenestration air leakage
Steven Savino
06/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Savino
06/29/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Steven Savino
06/29/2026
Special inspection requirement — Fenestration areas
Steven Savino
06/29/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Steven Savino
06/29/2026
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
06/29/2026
Special inspection requirement — Fire-Resistance Rated Construction
Steven Savino
06/24/2026
Special inspection requirement — Final
Steven Savino
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedMONARCH FACILITY SOLUTION07/29/2026
DOB NOWGeneral ConstructionPermit IssuedSB RENOVATION & MODELING07/27/2026
1 project · most recent 07/22/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/22/2026——Gas, Water/Sanitary
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
07/06/2026HVAC-R and service water heating system controlsSteven Savinoenergy_progress
07/06/2026Energy Code Compliance InspectionsSteven Savinoprogress
07/06/2026HVAC-R and service water heating equipmentSteven Savinoenergy_progress
07/06/2026HVAC-R and service water piping design and insulationSteven Savinoenergy_progress
06/29/2026Fenestration air leakageSteven Savinoenergy_progress
06/29/2026Fire-Resistant Penetrations and JointsSteven Savinospecial
06/29/2026Fenestration and door U-factor and product ratingsSteven Savinoenergy_progress
06/29/2026Fenestration areasSteven Savinoenergy_progress
06/29/2026Structural Stability – Alterations of existing buildingsSteven Savinospecial
06/29/2026Energy Code Compliance InspectionsSteven Savinoprogress
06/29/2026Fire-Resistance Rated ConstructionSteven Savinoprogress
06/24/2026FinalSteven Savinoprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/16/2026S01421817-S1Request digital key ↗
08/16/2026S01421817-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/25/2026S01421817-I1Open ↗
08/25/2026S01421817-I1Open ↗
08/25/2026S01421817-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/16/2026S01421817-S1Open ↗
08/16/2026S01421817-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026S01421817-I1Open ↗