← Back
Over six families without stores
514 WEST 146 STREET
MANHATTAN · Hamilton Heights-Sugar Hill · BIN 1061949
💬 Discuss this project
1910Year Built
6Stories
C1Building Class
R7AZoning
16,686 sfGross Floor Area
24Units
Rent Stabilized30 Open Violations 27 unresolved · 3 paperwork only ▸
Over six families without stores · Owner of record: 406 MANHATTAN LLC · 3,997 sf lot · 4.17 FAR built · Flood zone X
Locations of Work
StructuralElectricalMechanicalPlumbingEquipmentLandscapeGeneral
Permit Issued — active, not yet Signed-off
Floor 14p · 1 filing · 2 docs
Site & exteriorUnder Construction6p · 2 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GSR CONTRACTOR807/08/2026
AARCO CONTRACTING LLC703/22/2026
ELITE SIMRAN CONSTRUCTION CROP403/22/2026
406 MANHATTAN LLC303/22/2026
MN-9E PARTNERS L P203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASR ENGINEERING PC304/18/2024
BANGASH ASSOCIATES INC.103/17/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES303/21/2026
SHEIKH EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AARCO CONTRACTING LLCGeneral Contractor603/21/2026
ELITE SIMRAN CONSTRUCTIONGeneral Contractor603/21/2026
GSR CONTRACTOR INCGeneral Contractor407/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BANGASH ASSOCIATES INC8488103/17/2024
Building Lifecycle
All (76)Filed (4)Permit Issued (6)Signed Off (1)Violation (60)Special Inspection (5)
06/29/2026
Violation issued (ECB, closed)
Construction
06/29/2026
Violation issued (ECB, open)
Unknown
06/29/2026
Violation issued (ECB, open)
Unknown
06/04/2025
Violation issued (HPD, closed)
A
05/29/2025
Permit issued — Supported Scaffold
M01025841-I1-SF
11/22/2024
Violation issued (HPD, closed)
I
08/29/2024
Permit issued — Sidewalk Shed
M00927079-I1-SH
05/23/2024
Violation issued (HPD, open)
C
05/16/2024
Violation issued (HPD, open)
B
05/16/2024
Violation issued (HPD, open)
A
05/16/2024
Violation issued (HPD, open)
A
05/16/2024
Violation issued (HPD, open)
A
05/16/2024
Violation issued (HPD, open)
A
05/16/2024
Violation issued (HPD, open)
A
05/16/2024
Violation issued (HPD, open)
B
05/16/2024
Violation issued (HPD, open)
B
05/16/2024
Violation issued (HPD, open)
B
05/16/2024
Violation issued (HPD, open)
B
05/03/2024
Signed off — Alteration
APPLICATION FILE TO DAMAGE CONCRETE STEP REMOVE & REINSTALL AT FRONT OF BUILDING AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APLICATION.
M01019487-I1
04/18/2024
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01025841-P1
03/29/2024
Permit issued — Structural
M01019487-I1-ST
03/29/2024
Permit issued — Structural
M01019487-I1-GC
03/28/2024
Permit issued — Supported Scaffold
M01025841-I1-SF
03/27/2024
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01025841-I1
03/17/2024
Filed — Alteration
APPLICATION FILE TO DAMAGE CONCRETE STEP REMOVE & REINSTALL AT FRONT OF BUILDING AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APLICATION.
M01019487-I1
03/16/2024
Special inspection requirement — Structural Steel - Details
FAZAL BANGASH
03/13/2024
Special inspection requirement — Concrete - Cast-In-Place
FAZAL BANGASH
03/13/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAZAL BANGASH
03/13/2024
Special inspection requirement — Tenant Protection Plan Compliance
FAZAL BANGASH
03/13/2024
Special inspection requirement — Final
FAZAL BANGASH
02/18/2024
Violation issued (HPD, open)
A
02/18/2024
Violation issued (HPD, open)
C
02/18/2024
Violation issued (HPD, closed)
C
02/14/2024
Violation issued (HPD, open)
C
02/14/2024
Violation issued (HPD, open)
C
02/14/2024
Violation issued (HPD, open)
B
02/14/2024
Violation issued (HPD, open)
B
11/15/2023
Violation issued (HPD, closed)
I
08/31/2023
Filed — Alteration
M00927079-I1
08/31/2023
Permit issued — Sidewalk Shed
M00927079-I1-SH
11/02/2022
Violation issued (HPD, closed)
I
05/06/2022
Violation issued (HPD, open)
C
02/16/2022
Violation issued (HPD, closed)
A
01/29/2022
Violation issued (HPD, open)
C
01/29/2022
Violation issued (HPD, closed)
C
01/29/2022
Violation issued (HPD, closed)
C
01/29/2022
Violation issued (HPD, open)
C
04/02/2021
Violation issued (HPD, closed)
I
04/02/2021
Violation issued (HPD, closed)
A
12/10/2020
Violation issued (HPD, closed)
C
12/01/2020
Violation issued (HPD, closed)
B
09/03/2020
Violation issued (HPD, closed)
C
09/03/2020
Violation issued (HPD, closed)
B
08/03/2020
Violation issued (HPD, closed)
B
08/03/2020
Violation issued (HPD, closed)
B
08/03/2020
Violation issued (HPD, closed)
B
08/03/2020
Violation issued (HPD, open)
C
08/03/2020
Violation issued (HPD, open)
C
08/03/2020
Violation issued (HPD, closed)
A
04/03/2020
Violation issued (HPD, closed)
C
Latest 60 of 76 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedGSR CONTRACTOR INC05/29/2025
DOB NOWSidewalk ShedPermit IssuedAARCO CONTRACTING LLC08/29/2024
DOB NOWStructuralSigned-offELITE SIMRAN CONSTRUCTION03/29/2024
DOB NOWStructuralSigned-offELITE SIMRAN CONSTRUCTION03/29/2024
DOB NOWSupported ScaffoldPermit IssuedGSR CONTRACTOR INC03/28/2024
DOB NOWSidewalk ShedPermit IssuedAARCO CONTRACTING LLC08/31/2023
BISPLISSUEDTAR-MAC PLG & HTG03/24/1992
BISEQISSUEDCENTURY BUILDING ASSOCIATES ,INC03/02/1992
BISEQRE-ISSUEDCENTURY BUILDING ASSOCIATES ,INC12/12/1991
BIS—ISSUEDCENTURY BUILDING ASSOCIATES ,INC12/12/1991
1 project · most recent 04/18/2024
Scaffold
FiledStatusContractorScope
04/18/2024Permit IssuedGSR CONTRACTOR INCScaffold
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
03/16/2024Structural Steel - DetailsFAZAL BANGASHspecial
03/13/2024Concrete - Cast-In-PlaceFAZAL BANGASHspecial
03/13/2024Structural Stability – Alterations of existing buildingsFAZAL BANGASHspecial
03/13/2024Tenant Protection Plan ComplianceFAZAL BANGASHspecial
03/13/2024FinalFAZAL BANGASHprogress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/29/2026M00927079-I1Request digital key ↗
08/27/2026M01019487-I1Request digital key ↗
08/27/2026M01025841-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/29/2026M00927079-I1Open ↗
08/27/2026M01019487-I1Open ↗
08/13/2026M01025841-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/26/2026M01019487-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026M01019487-I1Open ↗