← Back
Limited service hotel, often national chain
514 WEST 168 STREET
MANHATTAN · Washington Heights (South) · BIN 1089931
💬 Discuss this project
2014Year Built
11Stories
H3Building Class
C4-4Zoning
38,418 sfGross Floor Area
2Units
LL97 CoveredRent Stabilized4 Open Violations 3 unresolved · 1 paperwork only ▸
Limited service hotel, often national chain · Owner of record: 514 WEST 168TH STREET, LLC · 4,750 sf lot · 8.09 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectrical
Roof1p · 1 filing · 6 docs
Floor 31p · 1 filing · 6 docs
Floor 21p · 1 filing · 6 docs
Floor 1
Site & exterior8p · 2 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TOTAL NY CONSTRUCTION CORP503/22/2026
EDGE PROPERTY GROUP403/22/2026
514 WEST 168TH STREET, LLC303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SYED ENGINEERING, P.C.104/21/2021
O&S ASSOCIATES103/12/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
O S ASSOCIATES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ENERGY BUILDING CONSTRUCTGeneral Contractor403/21/2026
TOTAL NY CONSTRUCTION CORPGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
O&S ASSOCIATES2753103/12/2021
Building Lifecycle
All (30)Filed (2)Permit Issued (3)Signed Off (2)Violation (16)Objection (2)Special Inspection (5)
04/29/2026
Violation issued (HPD, open)
A
06/04/2025
Violation issued (HPD, open)
A
04/02/2024
Violation issued (HPD, open)
A
03/16/2023
Violation issued (HPD, closed)
A
11/02/2022
Violation issued (HPD, closed)
I
02/16/2022
Violation issued (HPD, closed)
A
01/24/2022
Signed off — Alteration
Exterior Facade Restoration
M00476311-I1
01/03/2022
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC.
M00500562-I1
08/24/2021
Permit issued — General Construction
M00476311-I1-GC
08/13/2021
Violation issued (ECB, closed)
Construction
04/22/2021
Permit issued — Sidewalk Shed
M00500562-I1-SH
04/21/2021
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC.
M00500562-I1
04/16/2021
Permit issued — General Construction
M00476311-I1-GC
04/08/2021
Special inspection requirement — Final
RAFI HAMID
04/02/2021
Violation issued (HPD, closed)
A
04/02/2021
Violation issued (HPD, closed)
I
03/18/2021
Objection raised — Scope
03/18/2021
Objection resolved — Addressed
03/12/2021
Filed — Alteration
Exterior Facade Restoration
M00476311-I1
03/02/2021
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
SUCHITH JAYASENA
03/02/2021
Special inspection requirement — Masonry
SUCHITH JAYASENA
03/02/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
SUCHITH JAYASENA
02/25/2021
Special inspection requirement — Final
SUCHITH JAYASENA
08/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/10/2018
Violation issued (HPD, closed)
I
10/10/2017
Violation issued (ECB, closed)
Elevators
10/10/2017
Violation issued (ECB, closed)
Elevators
10/10/2017
Violation issued (ECB, closed)
Elevators
10/10/2017
Violation issued (ECB, closed)
Elevators
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offENERGY BUILDING CONSTRUCT08/24/2021
DOB NOWSidewalk ShedSigned-offTOTAL NY CONSTRUCTION COR04/22/2021
DOB NOWGeneral ConstructionSigned-offENERGY BUILDING CONSTRUCT04/16/2021
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/08/2021FinalRAFI HAMIDprogress
03/02/2021Exterior Insulation and Finish Systems (EIFS)SUCHITH JAYASENAspecial
03/02/2021MasonrySUCHITH JAYASENAspecial
03/02/2021Structural Stability – Alterations of existing buildingsSUCHITH JAYASENAspecial
02/25/2021FinalSUCHITH JAYASENAprogress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch1
09/03/2026M00500562-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
08/14/2026M00476311-I1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWSpecial Inspector Seal & Signature3
08/22/2026M00476311-I1Open ↗
08/22/2026M00476311-I1Open ↗
08/22/2026M00476311-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
09/04/2026M00476311-I1Open ↗
08/13/2026M00500562-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/23/2026M00500562-I1Open ↗
08/22/2026M00476311-I1Open ↗