DOB02/02/2022FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB10/13/2021FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB09/15/2021FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB07/21/2021FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB06/23/2021FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB04/28/2021FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB03/03/2021FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB01/06/2021FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB11/11/2020FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB09/02/2020FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB09/02/2020FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB01/08/1997V-DOB VIOLATION - ACTIVE
ECB04/10/2025FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTED: AT THE TIME OF INSPECTION OBSERVED VERTICAL CRACKS IN VARIOUS AREAS AT EXPOSURE 1 (39TH STREET) AND EXPOSURE 3 (38TH STREET) ALONG WITH A SECTION OFNothing owed — awaiting certificate of correction
ECB11/12/2021FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER.AT THE TIME OF INSPECTION OBSERVED AT EXP.#1 RIGHT SIDE 5'-0" LONG X 1/2" W/CRACK VERTICALWAY.REPAIR & COMPLY W/CODE.REMEDY:REPAIR &/OR REPLACE.Nothing owed — awaiting certificate of correction
ECB07/20/2021FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER AT TIME OF INSPECTION. NOTED: AT EXP#3 LOOSE/MISSING & OR DISLODGED BRICK &/ON MASONRY NO PROTECTION IN PLACE FOR SIDEWALK TRAFFIC. REMEDY: COMPLY WITH CODE.Nothing owed — awaiting certificate of correction
ECB06/15/2021FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. AT TIME OF INSPECTION NOTED AT EXP#3 LOOSE & DISLODGE BRICK & OR MASONRY W/NO PROTECTION FOR PEDESTRIAN ON SIDEWALK. REMEDY: COMPLY WITH CODE.Nothing owed — awaiting certificate of correction
ECB05/01/2021FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AT TIME OF INSPECTION NOTED AT FACADE EXP #2 MISSING AND/OR CRACKED DISLODGED BRICK AND FALLING STUCCO.REMEDY:COMPLY WITH CODE/PROVIDE PEDESTRIAN PROTECTIONNothing owed — awaiting certificate of correction
ECB03/25/2021FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED AT EXPOSURE#2 OBSERVED DETACHED,CRACKED FALLEN STUCCO MISSING BROKEN AND LOOSE BRICK THROUGHOUT EXP2.REMEDY:REPAIR OR REPLACE.Nothing owed — awaiting certificate of correction
ECB01/29/2021FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:AT TIME OFMY INSPECTION,I OBSERVED AT EXPOSURE#2 AT THE SIDE OF BUILDING FACADE IN DESREPAIR SPALLING STUCCO MISSING BROKEN BRICKS CRACKS NEED TO MAKENothing owed — awaiting certificate of correction
ECB12/11/2020FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. NOTED: AT EXP#2(EAST SIDE OF THE BLDG). FACADE IN DISREPAIR(SPALLING STUCCO,MISSING BROKEN BRICKS CRACKS). REMEDY: REPAIR OR REPLACE.Nothing owed — awaiting certificate of correction
ECB10/13/2020FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. NOTE: AT EXP#4(EASTSIDE OF BLDG)FACADE IN DISREPAIR W.SPALLING STUCCO THROUGHOUT ALSO MISSING BRICKS & SEPERATION AT FFRONT CORNER. REMEDY: REPAIR & OR REPLACENothing owed — awaiting certificate of correction
ECB08/21/2020FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. NOTED: AT TIME OF MY INSPECTION,I OBSERVED THE WALL AT EXP#2(EAST WALL)IS IN STATE OF DISREPAIR EW/FALLEN STUCCO & CREATE BRICK. NEED TO MAKE NECESSARY REPAIRINothing owed — awaiting certificate of correction
ECB02/28/2020FAILURE TO HAVE NEW OR ALTERED PLUMBING SYSTEM TESTED ON 2-28-2020 AT APPROX. 12:05PM I OBSERVED AN ACTIVE GAS MODINE HEATER, A GAS CROCK POT AND A GAS HOT WATER HEATER INSTALLED IN COMMERCIAL ESTABLISHMENT ATNothing owed — awaiting certificate of correction
ECB02/28/2020GAS BEING SUPPLIED TO BUILDING WITHOUT INSPECTION AND CERTIFICATION BY DOB ON 2-28-2020 AT APPROX. 12:05PM I OBSERVED AN ACTIVE GAS MODINE HEATER, A GAS CROCK POT AND A GAS HOT WATER HEATER INSTALLED IN COMMERCNothing owed — awaiting certificate of correction
ECB02/28/2020FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER ON 2-28-2020 AT APPROX. 12:05PM I OBSERVED AN ACTIVE GAS MODINE HEATER BEING FED GAS THROUGH A NON-COMMERCIAL GAS FLEX HOSE, UNIONS ON GAS PIPING AND FUTURENothing owed — awaiting certificate of correction
ECB02/28/2020WORK WITHOUT A PERMIT ON 2-28-2020 AT APPROX. 12:05PM I OBSERVED AN ACTIVE GAS MODINE HEATER, A GAS CROCK POT AND A GAS HOT WATER HEATER INSTALLED IN COMMERCIAL ESTABLISHMENT AT THE ABOVE MENTIONED ADDRESS WITHNothing owed — awaiting certificate of correction
ECB02/12/2020FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. AT TIME OF INSPECTION THE WALL AT EXPOSURE #2 (EAST WALL) IS IN A STATE OF DISREPAIR WITH FALLEN STUCCO AND CRACKED BRICKS. REMEDY: REPAIR AND/OR REPLACENothing owed — awaiting certificate of correction
ECB11/07/2014ELECTRICAL WORK W/O PERMIT OBSERVED AT 12:15PM TEMP WIRING INSTALLED FOR COMPRESSOR ON GROUND FLOOR NO APPLICATION ON FILE FOR TEMPORARY WIRING FOR COMPRESSOR. REMEDY: OBTAIN PERMITNothing owed — awaiting certificate of correction
Auto body / collision or auto repair · 14,225 sf lot · 1 FAR built · Flood zone X