515 WEST 42 STREET · Hell's Kitchen · BIN 1026914
💬 Discuss this project
1962Year Built
7Stories
H3Building Class
C6-4Zoning
122,050 sfGross Floor Area
220Units
LL97 CoveredRent Stabilized5 Open Violations ▸FISP: SAFE
Limited service hotel, often national chain · Owner of record: R.BORN ASSOC. · 23,425 sf lot · 5.21 FAR built · Flood zone X
Locations of Work
ArchitectureEquipmentGeneral
Roof2p · 1 filing · 13 docs
Floor 21 filing · 10 docs
Floor 11 filing · 10 docs
Site & exterior20p · 2 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RBA 421803/21/2026
J G CONSTRUCTION SRVCS503/22/2026
GICO REALTY303/21/2026
NYS REALTY TERMINAL203/21/2026
R.BORN ASSOC.103/22/2026
ROBERT BORN ASSOCIATES103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MILTIADIS LEPTOURGOS, PE109/30/2024
ASHRAF CORP107/02/2024
RICHARD KOENIGSBERG105/21/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION203/21/2026
KMA DESIGNS LLC203/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DK BUILDERS INCGeneral Contractor407/08/2026
J & G CONSTRUCTION SVCSGeneral Contractor303/21/2026
MANHATTAN CONSTRUCTION &General Contractor203/21/2026
RICHARD NEUElectrical103/21/2026
CRUZ, GEORGEElectrical103/21/2026
STEAMFITTERSElectrical103/21/2026
MAX ELECTRIC CO., INCElectrical103/22/2026
OLIVER CHRISTOPHERElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MILTIADIS LEPTOURGOS, PE508109/30/2024
LEO Y LEE ASSOCIATES2481106/28/2024
KOENIGSBERG ENGINEERING,2247105/21/2024
SANDEEP GUNNALA ENGINEERI8482105/21/2024
Building Lifecycle
All (99)Filed (4)Permit Issued (5)Signed Off (2)Facade (FISP) (13)Violation (60)Objection (2)Special Inspection (13)
04/29/2026
Violation issued (HPD, closed)
A
11/17/2025
Violation issued (HPD, closed)
I
10/14/2025
Violation issued (ECB, open)
Construction
02/10/2025
Cycle 9 facade report signed — SAFE
01/21/2025
Cycle 9 facade report submitted
01/13/2025
Signed off — Alteration
M01041871-I1
01/13/2025
Cycle 9 facade inspection completed
11/26/2024
Signed off — Alteration
Remedial repairs of spalling concrete and exposed rebars on 1st and 2nd floor slabs and ceilings at parking garage as per attached plans. Obtain GC permit. Remedial repair of rusty, corroded steel beams at parking garage as per plans. Obtain ST permit.
M01117176-I1
11/18/2024
Violation issued (ECB, closed)
Construction
11/18/2024
Violation issued (ECB, closed)
Construction
11/18/2024
Violation issued (ECB, closed)
Construction
11/18/2024
Violation issued (ECB, closed)
Unknown
11/18/2024
Violation issued (ECB, closed)
Construction
11/18/2024
Violation issued (ECB, closed)
Unknown
11/18/2024
Violation issued (ECB, closed)
Unknown
10/31/2024
Permit issued — General Construction
M01117176-I1-GC-CX
09/30/2024
Filed — Alteration
Remedial repairs of spalling concrete and exposed rebars on 1st and 2nd floor slabs and ceilings at parking garage as per attached plans. Obtain GC permit. Remedial repair of rusty, corroded steel beams at parking garage as per plans. Obtain ST permit.
M01117176-I1
09/30/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Miltiadis Leptourgos
09/30/2024
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
Miltiadis Leptourgos
09/25/2024
Special inspection requirement — Structural Steel - Welding
Miltiadis Leptourgos
09/25/2024
Special inspection requirement — Structural Steel - Details
Miltiadis Leptourgos
09/25/2024
Special inspection requirement — Final
Miltiadis Leptourgos
08/06/2024
Permit issued — General Construction
M01041871-I1-GC
07/11/2024
Permit issued — Suspended Scaffold
M01066761-I1-SC
07/10/2024
Objection raised — Other
07/10/2024
Objection resolved — Addressed
07/03/2024
Permit issued — Sidewalk Shed
M01071132-I1-SH
07/02/2024
Filed — Alteration
M01071132-I1
06/28/2024
Filed — Alteration
Installation of suspended scaffold for facade work or inspection
M01066761-I1
06/14/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Leo Lee
06/14/2024
Special inspection requirement — Post-installed Anchors
Leo Lee
05/31/2024
Permit issued — General Construction
M01041871-I1-GC
05/21/2024
Filed — Alteration
M01041871-I1
04/26/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
RICHARD KOENIGSBERG
04/26/2024
Special inspection requirement — Post-installed Anchors
RICHARD KOENIGSBERG
04/26/2024
Special inspection requirement — Masonry
RICHARD KOENIGSBERG
04/25/2024
Special inspection requirement — Energy Code Compliance Inspections
RICHARD KOENIGSBERG
04/25/2024
Special inspection requirement — Final
RICHARD KOENIGSBERG
04/25/2024
Special inspection requirement — Tenant Protection Plan Compliance
Sandeep Gunnala
02/22/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/24/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/16/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/16/2023
Violation issued (ECB, closed)
Construction
11/16/2023
Violation issued (ECB, closed)
Construction
10/26/2023
Violation issued (HPD, closed)
C
08/02/2023
Violation issued (ECB, closed)
Construction
03/15/2023
Violation issued (HPD, closed)
A
01/13/2023
Violation issued (ECB, closed)
Construction
01/12/2023
Violation issued (ECB, closed)
Unknown
01/12/2023
Violation issued (ECB, closed)
Unknown
01/12/2023
Violation issued (ECB, closed)
Unknown
01/12/2023
Violation issued (ECB, closed)
Unknown
01/12/2023
Violation issued (ECB, closed)
Unknown
01/11/2023
Violation issued (ECB, closed)
Construction
01/11/2023
Violation issued (ECB, closed)
Construction
01/11/2023
Violation issued (ECB, closed)
Construction
11/03/2022
Violation issued (HPD, closed)
I
04/13/2022
Violation issued (ECB, closed)
Elevators
08/23/2021
Violation issued (ECB, closed)
Construction
08/23/2021
Violation issued (ECB, closed)
Construction
Latest 60 of 99 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offMANHATTAN CONSTRUCTION &10/31/2024
DOB NOWGeneral ConstructionSigned-offDK BUILDERS INC08/06/2024
DOB NOWSuspended ScaffoldPermit IssuedRK CONTRACTING INC07/11/2024
DOB NOWSidewalk ShedPermit IssuedJ & G CONSTRUCTION SVCS07/03/2024
DOB NOWGeneral ConstructionSigned-offDK BUILDERS INC05/31/2024
BISOTISSUEDWORLD HUB CONSTRUCTION IN01/22/2013
BISEQISSUEDSTONELEDGE SCAFFOLD CORP06/15/2010
BISEQISSUEDEMPIRE SCAFFOLDING SYSTEM12/14/2007
BISEQISSUEDROCKLEDGE SCAFFOLD CORP04/05/2007
BISMHISSUEDTHE RIGHT CONNECTION P & HINC01/02/2007
BISEQISSUEDROCKLEDGE SCAFFOLD CORP12/06/2006
BISPLISSUEDTHE RIGHT CONNECTION P&H11/14/2005
BISEQISSUEDHI TECH BRIDGING06/25/2004
BISFPISSUEDMASTER FIRE SYSTEMS, INC07/08/2003
BISEQISSUEDSPRING SCAFFOLDING INC.01/23/2001
BISBLISSUEDJ JEKOWSKY AND SONS INC.09/27/2000
BISPLISSUEDJ JEKOWSKY AND SONS INC.09/27/2000
BISFPISSUEDACTIVE FIRE EXTINGUISHER CO INC02/22/1996
4 projects · most recent 01/02/2025
General Wiring
FiledStatusContractorScope
01/02/2025CompleteMAX ELECTRIC CO., INCGeneral Wiring
05/07/2024CompleteRICHARD NEU—
03/25/2024Permit IssuedOMD ELECTRICAL CORP1 meters, 1 new_meters
11/16/2023Permit IssuedMAX ELECTRIC CO., INCGeneral Wiring
1 project · most recent 06/28/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
06/28/2024Permit Issued—Suspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
09/30/2024Structural Stability – Alterations of existing buildingsMiltiadis Leptourgosspecial
09/30/2024Mastic and Intumescent Fire-resistant CoatingsMiltiadis Leptourgosspecial
09/25/2024Structural Steel - WeldingMiltiadis Leptourgosspecial
09/25/2024Structural Steel - DetailsMiltiadis Leptourgosspecial
09/25/2024FinalMiltiadis Leptourgosprogress
06/14/2024Alternative Materials - OTCR Buildings Bulletin NumberLeo Leespecial
06/14/2024Post-installed AnchorsLeo Leespecial
04/26/2024Structural Stability – Alterations of existing buildingsRICHARD KOENIGSBERGspecial
04/26/2024Post-installed AnchorsRICHARD KOENIGSBERGspecial
04/26/2024MasonryRICHARD KOENIGSBERGspecial
04/25/2024Energy Code Compliance InspectionsRICHARD KOENIGSBERGprogress
04/25/2024FinalRICHARD KOENIGSBERGprogress
04/25/2024Tenant Protection Plan ComplianceSandeep Gunnalaspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Travel Inn HotelParkingFloors 1, 2
Project M01117176 Alteration · LOC Issued · 09/30/2024
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 141 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/27/2026M01041871-I1Request digital key ↗
08/27/2026M01071132-I1Request digital key ↗
08/26/2026M01117176-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits25
▸BISPLAN / WORK APPROVAL APPLICATION20
12/18/2017123032681Open ↗
09/26/2017123183214Open ↗
08/31/2017121190978Open ↗
Showing 3 of 20 on file for this type
▸BISWORK PERMIT APPLICATION3
01/22/2013140048160Open ↗
06/16/2010120380818Open ↗
12/14/2007110048109Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
08/08/2016122364093Open ↗
▸DOB NOWHPD Certification Letter or CPC Special Permit1
08/13/2026M01117176-I1Open ↗
▸Zoning, Tax Lot & Property Records7
▸BISZONING RESOLUTION DETERMINATION2
11/22/2017121190978Open ↗
09/08/2017121190978Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
09/08/2017121190978Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
09/08/2017121190978Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
09/08/2017121190978Open ↗
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION1
10/26/2017121190978Open ↗
▸BISZONING DIAGRAM1
10/26/2017121190978Open ↗
▸Seals & Professional Certifications26
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026M01066761-I1Open ↗
09/01/2026M01066761-I1Open ↗
09/01/2026M01041871-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
06/15/2010120380818Open ↗
12/13/2007110048109Open ↗
06/16/2010120380818Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/27/2026M01041871-I1Open ↗
08/13/2026M01071132-I1Open ↗
08/13/2026M01117176-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026M01041871-I1Open ↗
09/01/2026M01041871-I1Open ↗
08/26/2026M01117176-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE2
06/06/2017140648547Open ↗
06/06/2017140648547Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
06/15/2010120380818Open ↗
12/13/2007110048109Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
06/15/2010120380818Open ↗
12/13/2007110048109Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
01/22/2013140048160Open ↗
▸BISPC FULL REPORT1
12/13/2007110048109Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
01/22/2013140048160Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/22/2013140048160Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
02/05/2018140648547Open ↗
▸Safety & Tenant Protection15
▸BISSRO MD ANTI-HARASSMENT CHECKLIST4
02/15/2018140648547Open ↗
01/22/2013140048160Open ↗
06/15/2010120380818Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist3
08/13/2026M01071132-I1Open ↗
08/13/2026M01041871-I1Open ↗
08/13/2026M01117176-I1Open ↗
▸DOB NOWHPD-2: Clinton Special District Anti-Harassment Checklist3
08/13/2026M01041871-I1Open ↗
08/13/2026M01117176-I1Open ↗
08/13/2026M01071132-I1Open ↗
▸BISANTI-HARASSMENT CHECKLIST: CLINTON2
10/26/2017121190978Open ↗
01/22/2013140048160Open ↗
▸BISSTREET TREE CHECKLIST2
09/08/2017121190978Open ↗
08/08/2016122364093Open ↗
▸DOB NOWCertificate of No Harassment1
08/13/2026M01117176-I1Open ↗
▸Environmental & Asbestos10
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
06/15/2010120380818Open ↗
12/13/2007110048109Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
02/15/2018140648547Open ↗
08/16/2017121190978Open ↗
▸DOB NOWOER: Notice of Satisfaction2
08/13/2026M01117176-I1Open ↗
08/13/2026M01041871-I1Open ↗
▸DOB NOWOER: Notice to Proceed2
08/13/2026M01041871-I1Open ↗
08/13/2026M01117176-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/22/2013140048160Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/27/2026M01041871-I1Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
09/06/2017121190978Open ↗
09/06/2017121190978Open ↗
01/22/2013140048160Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
01/22/2013140048160Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY8
10/26/2017121190978Open ↗
09/08/2017121190978Open ↗
09/08/2017121190978Open ↗
Showing 3 of 8 on file for this type
▸BISHYDRO FLOW TEST LETTER1
02/15/2018140648547Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
06/15/2017121190978Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
02/15/2018140648547Open ↗
▸BISSOIL REPORT1
06/15/2017121190978Open ↗
▸Approvals, Objections & Sign-offs12
▸BISLETTERS - SUPPORTING DOCUMENTATION6
10/26/2017121190978Open ↗
08/25/2017122364093Open ↗
08/25/2017122364093Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
11/14/2017121190978Open ↗
10/18/2017121190978Open ↗
09/18/2017121190978Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
06/15/2010120380818Open ↗
12/11/2007110048109Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
01/22/2013140048160Open ↗
▸Filing & Intake Forms21
▸BISEFILING COVER SHEET9
09/26/2017123183214Open ↗
08/29/2017121190978Open ↗
06/01/2017121190978Open ↗
Showing 3 of 9 on file for this type
▸BISADDITIONAL INFORMATION9
02/15/2018140648547Open ↗
11/22/2017121190978Open ↗
10/26/2017121190978Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
06/06/2017140648547Open ↗
01/22/2013140048160Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
08/08/2016122364093Open ↗
▸Other Documents3
▸BISENVIRONMENTAL 'E' DEP NOTICE TO PROCEED1
01/22/2013140048160Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01066761-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01066761-I1Open ↗